21 Pa. Super. 52 | Pa. Super. Ct. | 1902
Opinion by
The only ruling of the court below assigned for error is the refusal to give a binding instruction in favor of the defendant. The defendant company was engaged in building a large round brick chimney, at the Union Station, in the city of Pittsburg. The structure had an inside diameter of fourteen feet at the base which gradually lessened toward the top and at the height of 150 feet from the ground, which had been reached at the time of the occurrence out of which this action arose, was twelve feet. The materials used in the construction were hoisted to the top inside of the structure by means of a line passing through pulleys and attached to a large bucket, the power being furnished by an engine. The means adopted to protect the workmen at the bottom of the stack, whose duty it was to fill the buckets with the building materials and then make fast to it the hoisting rope, from injury by objects falling from the top of the stack, consisted of two platforms filling the entire inside diameter, excepting a hole in the center about two feet square through which the hoisting bucket passed; one about eight feet from the base, just above the heads of the men, and the other near the top of the stack, on which latter the bricklayers and their helpers worked. One of the pulleys over which the hoisting line ran was fastened at the edge of the hole in the lower platform and, at the time the plaintiff was injured, a sheave, or open pulley wheel, without any device to keep the line from jumping off, was there used. When the buckets were lowered to the bottom the line would sometimes come off this sheave, and it was necessary that it should be replaced before another bucket could be hoisted. It was necessary, in order to accomplish this, that one of the workmen should stand directly under the opening through which the buckets passed and, turning his face upward so that he could see what he was doing, put the line in place. While in this position the man might be struck by any object falling from the top of the chimnejr, but the workmen were not exposed to that peril in the discharge of any other part of their duty. The line having come off the sheave the plaintiff was directed by the engineer to replace it. He called to the men working at the top of the stack warning them what he was about to do, and one of the bricklayers’ helpers replied, “ All right; go ahead.” Plaintiff then stepped under
The man at the bottom of the stack could not know whether the bricklayers at the top had actually ceased work in response to his signal or not, nor could he see whether the upper platform was so constructed as to meet the inside of the chimney and thus prevent the falling of any of the material, in case the bricklayers had failed to suspend operations. What the plaintiff did was directly in the line of his employment. We cannot say, in view of the warning that he gave and the fact that the duty had been discharged in the same manner during a considerable period, that he was as a matter of law guilty of contributory negligence in placing himself in the position in which he was injured: Bennett v. Standard Plate Glass Company, 158 Pa. 120.
The learned counsel for the appellant has argued that there was not sufficient evidence to show how the plaintiff was injured; or where the mortar came from. There was, however, evidence that the mortar was wet, and that there was about a trowelful of it. It is hardly possible that mortar of such a character and in such a quantity could have fallen out of the finished wall below the upper platform. One witness testified positively that it did not go through the opening in the center of the upper platform; that there were three bricklayers who were actually working at the time the plaintiff was injured, that the upper platform at that time was within a course or two of the tiles used in construction, of the top of the work; that there was an open space of one and one half inches around between the chimney and the edge of the platform, and that he had on former occasions seen mortar go down through such an opening and striking on the step or ladder lower down glance out and go through the opening in the lower platform, but without catching anybody. There can be no doubt that the mortar fell from above. Whether it went through the opening between the platform and the brick work of the chimney was, under the evidence, a question for the jury.
There was evidence which would have justified a finding that the sheave used at the lower platform in connection with the hoisting line was a defective device. During the earlier part