263 Mass. 55 | Mass. | 1928
This is an action of tort to recover for personal injuries alleged to have been suffered by the plaintiff because of a defect in the sidewalk of Foster Street, a public way which the defendant was required to maintain in a reasonably safe condition for the use of travellers. G. L. c. 84, §§ 1,15. It was admitted that due notice of the time, place and cause of the accident was given, and that on November 24,1924, a contract was awarded to one Daddario to build a sewer in the street, and the contractor began the work about December 9, 1924, which was completed about May 17,1925. The plaintiff lived on the right side of Foster Street going toward Commonwealth Avenue, and the jury could find on her testimony that for weeks, perhaps months, prior to the accident which happened April 10, 1925, she had observed the work of excavation from the time it began to the day she was injured. The soil from the excavation had been thrown in piles parallel to the trench to a height of three and one half to five and one half feet or more. The piles filled the street gutter and part of the dirt sidewalk, which had a granite curbing, leaving only an open strip about two feet in width. The rain or surface water flowing down and following the grade of the sidewalk caused an irregular channel or "gully” in the material excavated running diagonally across the sidewalk, which was about eight inches wide and eight inches deep. The plaintiff had noticed this gully for five or six days, and several times had called the attention of the patrolman on the route to it. While walking with her daughter just about dusk on the right side of Foster Street, she testified that she “was extra cautious because she knew that the gully or depression was in the sidewalk,” and "was picking her way along; as she approached the gully” which she saw in front of her but not just where she placed her foot, and then stepped on a portion of the sidewalk about four or six inches from the edge of the gully where the dirt looked solid. The dirt gave way and she slipped and fell into the gully. The defendant offered no evidence in con
The city had the right to construct the sewer, and to close the street wholly or partially to travel during the work of construction, provided sufficient means were taken to caution the public against entering thereon. G. L. c. 83, § 1. See G. L. c. 84, § 15. The condition of the street and sidewalk were known to the plaintiff, and no notice could have given her greater information than she possessed from her own observation and knowledge. It is obvious that under such circumstances the city owed no duty to the plaintiff to warn her against entering the street and using the sidewalk as a public way. Cody v. Boston, 258 Mass. 267.
Exceptions overruled.