Ohio Valley Environmental Coalition v. United States Army Corps of EngineersOhio Valley Environmental Coalition v. United States Army Corps of Engineers
MEMORANDUM OPINION AND ORDER
Pending before the Court are several motions by the parties for full or partial summary judgment: Plaintiffs’ Motion for Partial Summary Judgment Against the Loadout Nellis Surface Mine (Doc. 112); Intervenor-Defendant, Loadout, LLC’s, Motion for Summary Judgment (Doc. 115); Intervenor-Defendant, Fola Coal Company, LLC’s, Motion for Partial Summary Judgment (Doc. 135); Plaintiffs’ Cross-Motion for Partial Summary Judgment (Doc. 139); and Intervenor-Defendant, Fola Coal Company, LLC’s, Motion for Summary Judgment (Doc. 150). For the reasons explained below, the Court GRANTS in part and DENIES in part Parties’ motions.
More specifically, the Court RULES as follows:
1. The Court FINDS the Corps violated the Clean Water Act and the National Environmental Policy Act by failing to provide adequate public notice and comment regarding Loadout’s § 404 permit. Therefore, Plaintiffs’ Motion for Partial Summary Judgment Against the Load-out Nellis Surface Mine on Count 5 of their Third Amended Complaint [Plaintiffs’ claim that the Corps violated its obligations under the CWA and NEPA to provide adequate notice and comment and to involve the public in its environmental impact analysis when it issued a § 404 permit for Loadout’s Nellis Surface Mine (Doc. 112) ] 1 is GRANTED.
2. Intervenor-Defendant Loadout’s motion for summary judgment on Counts 5, 6 and 7 of Third Amended Complaint [Plaintiffs’ claims that: the Corps violated the CWA and NEPA because (1) they failed to provide adequate public notice and comment on Loadout’s § 404 permit and adequate pre-decisional public involvement in its preparation of the relevant Environmental Assessment (Count 5); (2) the Corp’s determination that Loadout’s Nellis Surface Mine will not cause significant degradation of water of the U.S. is illegal, arbitrary and capricious (Count 6); and (3) the Corps’ Finding of No Significant Impact on the Nellis Surface Mine violates NEPA and is arbitrary and capricious because the Corps failed to take a hard look at the environmental impacts of the project (Count 7) (Doc. 115) ] is GRANTED in part and DENIED in part. The motion is GRANTED insofar as it is controlled by the Fourth Circuit’s decision in Ohio Valley Environmental Coalition v. Aracoma Coal Co.,556 F.3d 177 (2009) (Counts 6 & 7). However, it is DENIED with regard to Count 5, Plaintiffs’ claim that the Corps failed to provide adequate public notice and comment.
3. The Court FINDS the Corps violated the CWA and NEPA by failing to provide adequate public notice and comment regarding Fola’s § 404 permits. Therefore, Intervenor-Defendant Fola’s motion for partial summary judgment on Count 1 of Plaintiffs’ Fourth Amended Complaint [Plaintiffs’ claim that the Corps violated the CWA and NEPA by failing to provide adequate notice and comment on, and pre-decisional public involvement in, the § 404 permit for Fola’s Ike Fork No. 1 and Ike Fork No. 2 Surface Mines (Doc. 135) ] is DENIED and Plaintiffs’ cross-motion for partial summary judgment on the same claim (Doc. 139) is GRANTED.
4. Intervenor-Defendant Fola’s motion for summary judgment as to each count against it in Plaintiffs’ Fourth Amended Complaint (Counts 1-4) [ (1) Plaintiffs’ claim regarding notice and comment (Count 1); (2) Plaintiffs’ claim that the Corp’s determination that Fola’s mines will not cause significant degradation of waters of the U.S. is illegal, arbitrary and capricious (Count 2); (3) the claim that the Corps’ Finding of No Significant Impact on the Ike Fork permits violates NEPA and is arbitrary and capricious (Count 3); and (4) Plaintiffs’ claim that the Corps does not have jurisdiction to issue a § 404 permit for discharges from the toes of valley fills and, thus, the attempt to permit these discharges violates the CWA (Count 4) (Doc. 150)] is GRANTED in part, DENIED in part, and partially HELD IN ABEYANCE. The motion is GRANTED insofar as it is controlled by the Fourth Circuit’s decision in Ohio Valley Environmental Coalition v. Aracoma Coal Co. (Counts 2 & 4, and all of Count 3 except ¶ 76 g.); it is DENIED with regard to Count 1, Plaintiffs’ claim that the Corps failed to provide adequate public notice and comment; and the motion is HELD IN ABEYANCE with regard to Plaintiffs’ claim that the Corps had no reasoned basis or substantial evidence to conclude that the selenium discharges from Fola’s Ike Fork mines would be individually or cumulatively insignificant (Count 3, ¶76 g.).
I. Background
A. Procedural History and Relevant Case Law
In a complaint filed on August 7, 2008, Plaintiffs sought declaratory and injunctive relief on claims that the U.S. Army Corps of Engineers (“the Corps”) failed to comply with § 404 of the Clean Water Act (“CWA”), 33 U.S.C. § 1344, and the National Environmental Policy Act (“NEPA”), 42 U.S.C. § 4321 et seq., when issuing a permit for a large surface mine— the Hobet Surface Mine No. 22 — in Lincoln County, West Virginia. Since that time, Plaintiffs’ claims regarding Hobet Mining’s § 404 permit have been resolved. See PL’s Mot. for Leave to File a Third Am. Compl. (Doc. 85) (dismissing claims against the Corps related to Hobet Surface Mine No. 22). However, in the year that followed the original complaint, Plaintiffs amended their suit to add several claims against the Corps regarding surface mines operated by three additional companies: Fola Coal Company, LLC (“Fola”), Load-out, LLC (“Loadout”), and Appalachian Fuels, LLC (“AppFuels”). See PL’s Second Am. Compl. (Doc. 58) (adding claims related to Fola’s Ike Fork No. 1 and Ike Fork No. 2 Surface Mines); PL’s Third Am. Compl. (Doc. 120) (adding claims related to Loadout’s Nellis Surface Mine); PL’s Fourth Am. and Supplemental Compl. (Doc. 121) (adding claims related to AppFuels’ Fourmile North Surface Mine). These claims took two primary forms: (1) substantive, and (2) procedural. With regard to their substantive claims, Plaintiffs argued that the permits violated the CWA § 404(b)(1) Guidelines (“CWA Guidelines”) and that the Corps’ Findings of No Significant Impact (“FONSI”) and related Environmental Assessments (“EA”) violated NEPA. With regard to their procedural claims, Plaintiffs contend that the Corps failed to comply with its duties under the CWA and NEPA to provide adequate public notice, public comment, and other public involvement in its review process for the mines’ § 404 permits.
For the most part, Plaintiffs’ substantive claims are controlled by the Fourth Circuit’s decision in
Ohio Valley Environmental Coalition v. Aracoma Coal Company,
However, the Fourth Circuit disagreed and reversed this Court, holding: (1) the Corps’ decision regarding the scope of its NEPA analysis was entitled to deference and the Corps was reasonable in limiting the scope of its analysis to the impact of filling jurisdictional waters; (2) the Corps adequately supported its mitigated FON-SIs under NEPA and its findings of no significant degradation under the CWA
2
; and (3) the Corps did not exceed its § 404 authority in permitting “unitary waste systems” consisting of sediment ponds together with the stream segments that connect them.
Id.
at 197, 200-01, 206-07, 209, 216. For each of its holdings, the Fourth Circuit relied heavily on a theory of agency deference. Specifically, the Circuit Court relied on
Auer
or
Seminole Rock
deference, a “highly deferential” kind of review that is appropriate when a court reviews an agency’s interpretation of its own regulations,
see, e.g., id.
at 193 (citing
Auer v. Robbins,
The Fourth Circuit’s mandate in Aroco ma controls the majority of Plaintiffs’ substantive claims. Specifically, the deference accorded to the Corps under Aracoma requires this Court to FIND: (1) the Corps’ determinations that Loadout and Fola’s surface mines will not cause significant degradation to the waters of the U.S. are reasonable and, thus, in accordance with existing law; (2) the Corps’ FONSIs are reasonable and therefore also in accordance with existing law; and (3) Plaintiffs’ claim that the Corps does not have jurisdiction to issue a § 404 permit for discharges from the toes of valley fills is unpersuasive. Thus, the Court GRANTS summary judgment to Intervenor-Defendants on these counts.
In light of
Aracoma,
the only issues remaining in the instant matter are: (1) whether the Corps complied with its duties under the CWA and NEPA to provide adequate public notice and comment and predecisional public involvement in issuing
B. Regulatory Framework
“A complex statutory framework under-girds the regulation of [mountaintop mining operations.]”
Aracoma,
1. THE CLEAN WATER ACT
Congress passed the CWA with the express intent to “restore and maintain the chemical, physical, and biological integrity of the Nation’s waters.” 33 U.S.C. § 1251. This goal is achieved, in large part, by a general prohibition on the discharge of pollutants into navigable waters of the United States. Id. at § 1311. The Act contains two major exceptions to this prohibition, however. First, § 402 permits the discharge of pollutants through a national pollution discharge elimination system, id. at § 1342, and, second, § 404 permits the discharge of dredged or fill material into the navigable waters at specified disposal sites. Id. at § 1344. Pursuant to § 404, permits for the discharge of dredged or fill material may be issued by the Secretary of the U.S. Army Corps of Engineers (“Secretary”), after notice and an opportunity for public hearing. Id.; 33 C.F.R. § 320.2(f). Such authority must be exercised in accordance with the guidelines developed by the Administrator of the U.S. Environmental Protection Agency (“EPA”) and published in 40 C.F.R. Part 230 (hereinafter “CWA Guidelines” or “404(b)(1) Guidelines”), as well as in accordance with the Corps’ own regulations. 33 C.F.R. § 320.2(f).
The overall purpose of the § 404 permit evaluation process and the attendant public notice is to determine whether a proposed project will result in significant, unacceptable adverse effects to the waters of the United States.
See
40 C.F.R. §§ 230.1, 230.10, 230.12; 33 C.F.R §§ 320.2(f), 320.4. This is consistent with the CWA’s purpose of restoring and maintaining the waters of the United States,
see
33 U.S.C. § 1251, and is achieved through a process known as the public interest review. According to the Corps’ regulation at 33 C.F.R. § 320.4(a)(1), the decision whether to issue a § 404 permit must be “based on an evaluation of the probable impacts ... of the proposed activity and its intended use on the public interest.”
3
33 C.F.R. § 320.4(a)(1). There is a presumption that “a permit will be granted unless the district engineer determines that it would be contrary to the public interest,”
id.,
which is defined in terms of environmental degradation. A permit is contrary to the public interest if the “discharge of dredged or fill material ... will cause or contribute to significant degradation of the waters of the United States.” 40 C.F.R. § 230.10(c). If a pro
The Corps protects the public interest, fulfilling its statutory and regulatory obligations under § 404, by engaging in the permit evaluation process outlined by the CWA and CWA Guidelines. To initiate this process, an interested party files a § 404 permit application with the Corps. Such an application “must include a complete description of the proposed activity including necessary drawings, sketches, or plans sufficient for public notice.” 33 C.F.R. 325.1(d)(1) (2007) 4 ; see also id. (“Detailed engineering plans and specifications are not required,” however, the application must describe “the location, purpose and need for the proposed activity; scheduling of activity; the names and addresses of adjoining property owners; the location and dimensions of adjacent structures; and a list of authorizations required by other federal, interstate, state, or lobal agencies ... including all approvals received or denials already made.”). “[Wjithin 15 days of receipt of an application the district engineer will either determine that the application is complete ... or that it is incomplete and notify the applicant of the information necessary for a complete application.” 33 C.F.R. 325.2(a)(2). Once the application is deemed complete, public notice must be issued within 15 days. 33 U.S.C. § 1344(a) (“Not later than the fifteenth day after the date an applicant submits all the information required to complete an application for a permit under this subsection, the Secretary shall publish notice required by this subsection.”); 33 C.F.R. 325.2(d)(1) (“The public notice will be issued within 15 days of receipt of all information required to be submitted by the applicant in accord with paragraph 325.1.(d) of this Part.”).
“[T]o the maximum extent practicable, a decision with respect to an application for a permit ... will be made not later than
2. THE NATIONAL ENVIRONMENTAL POLICY ACT
NEPA was enacted with lofty goals. The Congressional declaration of purpose provides,
The purposes of this chapter are: To declare a national policy which will encourage productive and enjoyable harmony between man and his environment; to promote efforts which will prevent or eliminate damage to the environment and biosphere and stimulate the health and welfare of man; to enrich the understanding of the ecological systems and natural resources important to the Nation; and to establish a Council on Environmental Quality.
42 U.S.C. § 4321. NEPA is an “action-forcing” statute, which “promotes its purpose in two ways. First, NEPA ensures that a federal agency will carefully consider the effects of its actions on the environment by specifying formal procedures the agency must follow before taking action. Second, NEPA requires an agency to disseminate widely its findings on the environmental impacts of its actions.”
Nat’l Audubon Society v. Dep’t of Navy,
A § 404 permit requires environmental review pursuant to NEPA. Additionally, the § 404 permitting process implicates an intermediate form of environmental review known as the “mitigated EA.” The “so-called mitigated EA” is used when an agency determines that, although they will be significant, the adverse environmental impacts associated with a proposed project can be reduced below significance using mitigation. Id. at 191-92 (“Even where an EA determines that a proposed action will have a significant environmental impact, an agency may avoid issuing an EIS where it finds that mitigating measures can be taken to reduce the environmental impact of the project below the level of significance. In these situations, the agency can issue a ‘so-called mitigated FONSI.’ ”) (internal citations and quotations omitted). The mitigated EA and mitigated FONSI are relevant here because they are commonly used in the mountaintop coal-mining context. See Id. at 187 (“For each of the four permits, the Corps prepared Environmental Assessments that concluded that the permitted activity would not result in significant environmental impacts given planned mitigation measures. On that basis, the Corps issued a “Finding of No Significant Impact” for all four permits.”).
Whether used in the context of an EIS, EA or mitigated EA, public involvement is critical to NEPA’s function.
See, e.g., California v. Block,
First, 40 C.F.R. § 1500.1, the section entitled “Purpose,” provides, in relevant part:
NEPA procedures must insure that environmental information is available to public officials and citizens before decisions are made and before actions are taken. The information must be of high quality. Accurate scientific analysis, expert agency comments, and public scrutiny are essential to implementing NEPA. Most important, NEPA documents must concentrate on the issues that are truly significant to the action in question, rather than amassing needless detail. 40 C.F.R. § 1500.1(b).
Additionally, the CEQ Guidelines mandate that the lead agency on an EA “shall involve environmental agencies, applicants, and the public, to the extent practicable, in preparing assessments,” 40 C.F.R. § 1501.4(b); a duty which includes “[m]ak[ing] diligent efforts to involve the public in preparing and implementing their NEPA procedures,” 40 C.F.R. § 1506.6(a), and “[s]olicit[ing] appropriate information from the public.” 40 C.F.R. § 1506.6(d).
C. Factual Background
Plaintiffs claim that the public notices issued for the § 404 permit applications for Loadout’s Nellis Surface Mine and Fola’s Ike Fork mines were deficient under the CWA and NEPA. Therefore, an evaluation of this claim requires an understanding of the facts surrounding the issuance of each permit.
1. PERMIT APPROVAL FOR THE LOADOUT NELLIS SURFACE MINE
Loadout filed its application for a CWA § 404 permit for its Nellis Surface Mine on April 10, 2005. The Corps deemed the application complete on May 25, 2006, and issued public notice of the application on June 2, 2006. Public comment on the notice was open for 30 days, until July 2, 2006. 6 The notice document for the Nellis Surface Mine is three and a half pages long. Loadout Notice (Doc. 86-1). It includes several standard sections, including but not limited to descriptions of: the purpose of the notice, the relevant regulatory program, the requirements of § 404, the § 401 water quality certification requirement, the public interest review, and the § 404 comment procedures. Id. Additionally, the notice contains some project-specific information, including the location of the proposed project and a description of the proposed work. Id. The location of the project is described with longitude and latitude measurements and by tributary names. Id. The section entitled “Description of Proposed Work” consists of two paragraphs, where the Corps: (1) specifies the purpose of the proposed project; (2) describes the type of structures proposed (four valley fills, two permanent sediment ponds, and one temporary sediment pond); and (3) provides the linear footage of the expected permanent and temporary impacts to waters of the United States, including whether the impacts would be to an intermittent or ephemeral stream. Id. Finally, a summary of the proposed impacts is provided in table form and several maps and drawings, including cross sections of the proposed valley fills, are included in the notice. 7 Id.
The Corps received ten comments in response to the Loadout Notice, including a twenty-nine page comment letter submitted on behalf of Plaintiffs by Margaret Janes of the Appalachian Center for the Economy and the Environment (“Appalachian Center”). See Appalachian Center’s Loadout Comments (Doc. 86-11). Plaintiffs’ comments cover a wide range of topics, including but not limited to: criticism of the Corps’ analysis of practicable alternatives; criticism of the scope of the overall analysis; and the suggestion that the permit may not sufficiently protect water quality standards. Id. Additionally, Plaintiffs’ comment letter scrutinizes the expected use of mitigation to offset the project’s adverse environmental impacts. Id. Attached to their comments, Plaintiffs provide expert reports produced by Drs. Bruce Wallace and Margaret Palmer as well as published articles on stream restoration. However, neither through their comments nor at any time later in the permitting process did Plaintiffs request a public hearing on the application.
Shortly after the close of public comment on its application, on July 7, 2006, Loadout submitted an Environmental Information Document for the Nellis Surface Mine (“Loadout EID”). The EID contains a detailed analysis of practicable alternatives; a comprehensive description of how mining would proceed under the proposed plan; a lengthy explanation of actions the company will take to mitigate adverse impacts; and a detailed proposal regarding post-mining land use. 8 Loadout EID (Doc. 86-5). Next, in July 2007, approximately one year after the comment period closed, Loadout submitted an initial Compensatory Mitigation Plan (“Loadout CMP”) to the Corps. That same month, the Corps circulated the Loadout CMP to the U.S. Fish and Wildlife Service (“USFW”), the U.S. Office of Surface Mining (“OSM”), the West Virginia DEP (“WVDEP”), the West Virginia Division of Natural Resources (‘WVDNR”), and the West Virginia Division of Culture and History (“WVDCH”) for review and comment. Then, in December 2007 and March 2009, respectively, Loadout sent the Corps two letters with information to supplement the CMP.
The Loadout CMP was not made available for public comment. Additionally, none of the federal or state agencies to which the CMP was circulated made comments on it. Together, the CMP and its supplements provide a detailed analysis of the potential adverse environmental impacts of the Nellis Surface Mine’s § 404 permit, including the expected severity of these impacts and the mitigation measures proposed to counter them.
9
See
Loadout EID (Doc. 86-5); Loadout CMP (Doc. 86-2). In its CMP, Loadout proposes to mitigate adverse impacts by using stream creation and stream restoration. Specifically, Loadout proposes to mitigate the permanent impacts its project will have to 11,162
The Corps issued the § 404 permit for Loadout’s Nellis Surface Mine on April 21, 2008, approximately nine months after Loadout submitted its initial CMP. Load-out Permit (Doc. 86-6). Attached to the permit, the Corps provided an 88-page Combined Decision Document (“Loadout CDD”) in which it published a FONSI for the Nellis Surface Mine. The Loadout CMP plays a prominent role in the Load-out CDD. The Loadout CDD incorporates the entire CMP by reference and, in a section entitled “Applicant’s Proposed Mitigation,” the CDD contains a twenty-page discussion of the CMP. Loadout CDD (Docs. 86-3 & 86-4). Additionally, the CMP is referenced throughout the Corps’ discussions of the significance (or lack thereof) of the individual and cumulative impacts of the § 404 permit and the Corps refers to the mitigation plan in response to a large portion of Plaintiffs’ comments. 10 Id. Finally, the Loadout FONSI, which is issued in the last section of the Loadout CDD, directly refers to the CMP as “quantitatively assessing] impacts to aquatic resources and presenting] a mitigation design to compensate for the stream function loss associated with the proposed project.” Id. at 87. The Loadout CDD therefore acknowledges that the Loadout FONSI is based, in large part, on the mitigation measures provided for in the CMP.
2. PERMIT APPROVAL FOR FOLA’S IKE FORK MINES NOS. 1 AND 2
The permit evaluation process for Fola’s Ike Fork mines was similar to that of Loadout’s Nellis Surface Mine. Fola filed its initial application on October 19, 2004, and the Corps determined the application was complete and issued notice for public comment on April 13, 2005. Fola Notice (Doc. 36-1). The comment period on the Fola Notice was then open for 30 days, until May 14, 2005.
Id.
The Fola Notice is four pages long and it contains many of the standard sections present in the Load-out Notice.
11
Id.
Additionally, similar to the Loadout Notice, the Fola Notice con
Pursuant to the Fola Notice, the Appalachian Center submitted comments on behalf of Plaintiffs. These comments were nearly identical in form and substance to the comments submitted in response to the Loadout Notice. There were five additional public comments received in response to the Fola Notice.
Similarities notwithstanding, the process by which the Corps evaluated Fola’s § 404 permit differed from the Loadout permit evaluation in a few significant ways. First, on November 2, 2004, prior to issuing public notice, the Corps wrote Fola and requested additional information on the project. In its letter, the Corps informed Fola that its application did not provide “sufficient information regarding the extent of jurisdictional waters of the U.S. that have been or would be impacted by the [Ike Fork permit activity]” and that additional information “[was] required in order to advertise [Fola’s] proposal via a public notice.” Corps’ Letter to Fola, Nov. 2, 2004 (Doc 73-16). Following this statement, the Corps provided Fola with a list of items imperative to, and thus required before, the issuance of public notice. Although not included in this specific, pre-notice list, the letter requests that Fola provide the agency with an EID and a CMP. This request is explained as follows:
In order to issue a Section 404 [individual permit], the Corps must conclude the project is consistent with the Section 404(b)(1) Guidelines [ ] and the project is not contrary to public interest. The information contained below and enclosed is intended to assist you in determining what information, beyond that already required in SMCRA and other state permits, must be submitted with an IP request. The information required by SMCRA and other state permits may be sufficient to address some of the requirements. The required information provides the factual basis for the Corps to make the aforementioned conclusions to facilitate final IP decisions. The following information is required in order to process an IP request:
1) an alternatives analysis pursuant to the Guidelines and the NEPA,
2) a compensatory mitigation plan developed in accordance with the Corps’ Regulatory Guidance Letter dated December 2k, 2002 (attached),
3) a description of the affected environment is necessary to help understand the environmental impacts of proposed projects and no action alternatives, and
4) information concerning other land disturbance activities and watershed improvement projects within the same watersheds as the proposed activity on water quality and aquatic habitat. Id. (emphasis supplied)
This letter distinguishes the Fola permit process, at least in part, from the Loadout process because — through the letter — the Corps indicates that the Fola application was not complete upon submission and identifies what type of information and/or documents are necessary before a determination of completion can be made. Further, the letter specifically informs the company what information is necessary in order for the Corps to determine that the proposed § 404 permit will comply with CWA and NEPA standards. This list of information and documents explicitly includes a compensatory mitigation plan.
Public notice for the Fola application issued on April 13, 2005, and the comment period on the notice ended on May 14, 2005. Fola submitted an initial CMP for the Ike Fork mines (“Fola CMP”) in October 2006, nearly a year and a half after public comment on the application closed. Fola’s Mem. In Supp. Of Mot. For Partial Summ. J. (Doc. 136), 2. Further, Fola submitted a final EID for the Ike Fork mines (“Fola EID”) in January 2007 and a supplement to the CMP in December 2007. Fola’s EID and CMP are similar in scope and content to those submitted by Load-out. They contain detailed explanations of the mining plan; the environmental quality of the land and water to be affected; the linear feet of stream to be affected (32,-731); and the mitigation techniques proposed to offset such environmental degradation. 14 See Fola EID; Fola CMP (Doc. 56-1, Doc. 56-2 & Doc. 56-3). Specifically, as the permit indicates, the CMP provides that Fola will “compensate for unavoidable adverse impacts to waters of the United States [by ensuring] the following mitigation measures ... [o]ff-site creation of 18,-834.7 linear feet of intermittent stream channels and 17,608.8 linear feet of ephemeral stream channels; [][o]n-site restoration/enhancement of 100 linear feet of ephemeral stream channel and 4,785 linear feet of intermittent streams; and [ ] establishment of 47.4 acres of riparian habitat.” Fola Permit (Doc. 36-8), Special Cond. No. 9. Further, as indicated in the Fola Decision Document (“Fola DD”), the CMP describes the stream creation sites evaluated and selected. Such descriptions include whether the site was subject to previous mining activities, the elevation and topography of the site, and the site’s expected function. See Fola DD (Doc. 36-4), 32-33. Finally, as was the case with the Loadout documents, the Fola EID and Fola CMP were submitted to multiple federal and state agencies for review and comment, but were not released for public comment.
The Corps issued the permit for Fola’s Ike Fork No. 1 and Ike Fork No. 2 mines on March 5, 2008, nearly three years after the public notice issued and approximately a year and a half after Fola submitted an initial CMP for the project. The permit was accompanied by a 144-page decision document, which contained eleven appendices totaling several hundred pages. Fola DD (Doc. 36-3 through Doc. 36-7). Similar to the Loadout CMP, Fola’s CMP plays a central role in the Fola DD. First, the Fola DD contains a twenty-page evaluation of Fola’s CMP. Additionally, the DD’s discussion of expected individual and cumulative impacts centers, in large part, upon specific mitigation measures provided for in the CMP.
Id.
Finally, in its discussion of the FONSI issued for the Ike Fork mines
[i]n consideration of the all [sic.] of the information noted above with reference to the information documented below under Section XI(E) related to the structure and function of the aquatic ecosystem, it has been determined that the applicant’s proposed compensatory mitigation measures are commensurate with the impacts to waters of the United States and aquatic resources benefits would occur as a result of implementing the applicant’s mitigation work plan. Id. (Doc. 36-4), 41.
II. Standards of Review
A. Summary Judgment
Rule 56(c) of the Federal Rules of Civil Procedure provides that summary judgment is proper if “the pleadings, the discovery and disclosure of materials on file, and any affidavits show that there is no genuine issue as to any material fact and that the movant is entitled to judgment as a matter of law.” Fed.R.Civ.P. 56(c). When considering a motion for summary judgment, the Court considers the facts in the light most favorable to the nonmoving party.
Adickes v. S.H. Kress, and Co.,
Still, the party opposing summary judgment “must do more than simply show that there is some metaphysical doubt as to material facts.”
Id.
at 586,
B. The Administrative Procedure Act
“Claims challenging federal agency action under the CWA and NEPA are subject to judicial review under the APA.”
Aracoma,
III. Analysis
A. Plaintiffs’ Notice Claims Are Not Moot
Intervenor-Defendant Loadout argues that, due to the deference the Fourth
Although it is correct that judgment in favor of Plaintiffs may not alter the Corps’ decision to issue the Loadout permit or move the Corps to require changes to the permit as issued, the company’s argument for mootness is unpersuasive. Plaintiffs’ procedural claim is that they were denied an opportunity for meaningful notice and comment under the CWA and NEPA. Therefore, Plaintiffs assert a procedural, not a substantive right.
The U.S. Supreme Court’s holding in
Massachusetts v. EPA
is instructive. “When a litigant is vested with a procedural right, that litigant has standing if there is some possibility that the requested relief will prompt an injury-causing party to reconsider the decision that allegedly harmed the litigant.”
Massachusetts v. EPA
Here, Plaintiffs argue that public notice for the Nellis Surface Mine and the Ike Fork Surface mines were deficient. Further, Plaintiffs request that the Corps re-notice the permit applications with more complete information on mitigation, contending that such re-notice will (1) provide the public with a meaningful opportunity to comment on the applications, and (2) force the Corps to reconsider these permits, possibly with new information. In contrast to Loadout’s argument, Plaintiffs do not assert that re-notice and reconsideration of the permits is likely to change the Corps’ decisions regarding approval. Such a finding is not necessary to withstand mootness, however, because under
Massachusetts v. EPA
the existence of a specific, achievable procedural remedy is sufficient grounds to find in Plaintiffs’ favor.
Massachusetts,
B. The Corps Failed to Comply with the Notice Requirements of the CWA
The issue presented with respect to the CWA is whether — in light of the central role compensatory mitigation plays in determinating whether a § 404 permit for a mountaintop coal mine will cause or contribute to significant environmental degradation — the Loadout and Fola Notices, which contained no substantive information on proposed mitigation, were suffi
To determine whether the public notices for the Loadout and Fola mines were sufficient, the Court must consider whether the Corps’ conclusion that the mining companies’ permit applications were complete at the time of issuance complies with law. Completion and public notice are inextricably linked. A complete application is defined in terms of the sufficiency of the submitted materials to provide a meaningful opportunity for public comment, 33 C.F.R. § 325.1(d)(9) (“An application will be determined to be complete when sufficient information is received to issue a public notice (See 33 CFR 325.1(d) and 325.3(a).)”), and the 15-day deadline for the issuance of public notice is triggered by the completeness of a permit application. 33 C.F.R. § 325.2(d)(1) (“The public notice will be issued within 15 days of receipt of all information required to be submitted by the applicant in accordance with paragraph 325.1(d) of this Part.”); 33 C.F.R. § 325.2(a)(2) (“Within 15 days of receipt of an application the district engineer will either determine that the application is complete (see 33 CFR 325.1(d)(9) and issue public notice as described in § 325.3 of this Part ... or that it is incomplete and notify the applicant of the information necessary for a complete application.”)). The regulations instruct that “[t]he issuance of a public notice will not be delayed to obtain information necessary to evaluate an application.” 33 C.F.R. § 325.1(d)(9). However, because completion is defined by the sufficiency of the submitted materials to warrant public notice, id,., it is controlled by 33 C.F.R. § 325.3(a), which governs the content of a public notice. 33 C.F.R. § 325.3(a) provides a non-exhaustive list of materials that must be included in a § 404 notice. Pertinent here, it mandates that “[t]he notice must ... include sufficient information to give a clear understanding of the nature and magnitude of the activity to generate meaningful comment.” 33 C.F.R. § 325.3(a).
As outlined above, the CWA and CWA Guidelines create a tension between the content and timing of a § 404 notice. First, there is the Congressional mandate that public notice be issued no later than 15 days after a § 404 permit application is complete, 33 U.S.C. § 1344(a); 33 C.F.R. § 325.3(d)(3), which allows the public to participate early in the application process.
15
Then, there is the Corps’ regulatory duty to issue notice that contains sufficient information to allow for meaningful comment.
See, e.g.,
33 C.F.R. § 325.3(a)(1) (“The notice must [ ] include sufficient information to give a clear understanding of the nature and magnitude of the activity to generate meaningful comment.”);
Connecticut Light & Power Co. v. Nuclear Regulatory Comm’n,
Here, the timing-content tension created by the issuance of notice required the Corps to exercise its discretion in balancing these potentially conflicting requirements. Specifically, the Corps exercised such discretion when determining whether the Loadout and Fola applications were sufficiently complete to warrant public notice and when deciding what information to include in the attendant notices. The pertinent question is therefore whether the Corps’ determinations of completeness should be afforded substantial deference.
The Court is sensitive to the high degree of deference accorded to the Corps in
Aracoma
and afforded any agency under 5 U.S.C. § 706(2).
See Aracoma,
Generally, decisions made pursuant to an agency’s discretionary authority are afforded substantial deference, especially if those decisions rely upon an agency’s scientific or technical expertise,
Aracoma,
To explain the inconsistency between the language of the CWA and CWA Guidelines and the Corps’ determinations of completion regarding the Loadout and Fola applications, the Court turns to the portions of the statute and guidelines that cabin the Corps’ permit-based discretion. Specifically, the Court looks to the standard for evaluating the sufficiency of a public notice established in 33 C.F.R. § 325.3(a), which ultimately defines when an application is complete. See 33 C.F.R. § 325.1(d)(9). “Public notice is the primary method of advising all interested parties of the proposed activity for which a permit is sought and of soliciting comments and information necessary to evaluate the probable impacts on the public interest.” 33 C.F.R. § 325.3(a). According to the Corps’ regulations, “notice must therefore give a clear understanding of the nature and magnitude of the activity to generate meaningful comment.” Id. When assessing the reasonableness of the Corps’ actions, the Court considers the application of this standard in the context of existing § 404 case law, as well as other administrative law cases, which address the sufficiency of notice and therefore help define what it means for comment to be “meaningful.”
Pursuant to
Aracoma,
the issuance of a § 404 permit constitutes informal rule-making under the APA.
The standards articulated in
Home Box Office
and
Connecticut Light & Power
are discussed in
National Asphalt Pavement Association v. Train,
where the D.C. Circuit concludes that “in order to have a meaningful opportunity to comment, one must be aware of the information the agency finally decides to rely on in taking agency action,”
In the instant case, Plaintiffs challenge the sufficiency of the Loadout and Fola Notices on account that these notices contained no substantive information on mitigation. The standard established in 33 C.F.R. § 325.3(a), viewed in light of the aforementioned circuit court cases, supports this argument. Compensatory mitigation is critical to the Corps’ determination that a § 404 permit for a mountaintop coal mine will not cause or contribute to significant environmental degradation and, thus, is not contrary to the public interest.
See, e.g., Aracoma,
Taken together,
Aracoma,
the Loadout and Fola decision documents, the Corps’ November 2 letter to Fola, and the Corps’ argument before the Court confirm that compensatory mitigation is the principle factor considered when conducting a § 404 permit review. The evidence indicates that compensatory mitigation is “the information the agency finally decides to rely on in taking agency action,”
Appalachian Power,
Because the notices contained no substantive information on mitigation, the clear answer to this question is no. The notices did not “give [the public] a clear understanding of the nature and magnitude of the activity to generate meaningful comment.”
See
33 C.F.R. § 325.3(a)(1). Without any substantive information on mitigation, the notices failed to provide an accurate picture of the Corps’ reasoning and prevented useful criticism on the part of Plaintiffs and on the part of the public in general.
See Connecticut Light & Power,
Several federal district court cases support this conclusion, including:
National Wildlife Federation v. Marsh,
To begin with,
Marsh
involved a challenge by environmental groups to a § 404 permit approved by the Corps for construction of an oil refinery in the Chesapeake Bay.
Applying that reasoning here, this Court finds that — because it is critical to the Corps’ ability to issue a finding of no significant degradation — information on proposed mitigation, like the Staff Evaluation in Marsh, constitutes the rationale and pivotal data underlying the Corps’ decision to issue a § 404 permit for a mountaintop mine. Accordingly, information on proposed mitigation is the rationale and pivotal data that must be entered into the administrative record and released for public review and comment before the close of comment on a § 404 permit for a mountaintop mine.
Hall
provides a similar conclusion. In
Hall,
environmental groups challenged the issuance of a § 404 permit to the Navy for construction of an aircraft carrier home-port near Everett, Washington.
The Hall Court’s conclusion — that the monitoring plan constituted the rationale and pivotal data underlying the Corps’ permit decision — was based upon the prominent role the monitoring plan played in the two EISs conducted on the proposed project, in the Corps’ Record of Decision (“ROD”) published on the project, and in the Corps’ finding of no significant environmental degradation. Id. at 948; id. at 938 (“Adequacy of an EIS hinges, inter alia, on the completeness of the mitigation plan. Here, the Corps’ EIS discusses various mitigation measures. With reference to the CAD proposals, it is clear that the monitoring plan is the centerpiece of the Corps’ mitigation plan. The government repeatedly relies on the monitoring plan[.]”) (internal citations omitted); id. at 945 (“[T]he Corps relies on the EISs and the studies cited therein to conclude that the RADCAD project will not cause significant degradation.”). Additionally, the finding that the Corps failed to comply with the public notice requirements of the CWA Guidelines was based on the fact that the Navy did not submit its monitoring plan — which provided the Corps a basis upon which to determine no significant degradation — until after the close of public comment. Id. at 948 (“As the court has already explained in the context of NEPA’s requirements, a simple review of the time line in this case demonstrates that the Corps did in fact violate its own regulations, in that the Navy published its final monitoring plan in November of 1987, and the Corps approved it in April of 1988, nearly sixteen months after the close of the public comment period.”); id. at 948 (“The process used by the Corps, in effect, prevented the public from commenting on the single most important feature of the RADCAD project — the monitoring plan.”).
Because the facts in
Hall
are similar to the facts in the instant case, the reasoning and conclusion in
Hall
are applicable here. To begin with, the monitoring plan in
Hall
is the functional equivalent of the mitigation information at issue in this litigation. As discussed, the monitoring plan served as the centerpiece of the aircraft carrier homeport’s mitigation plan, providing the material justification for the Corps’ issuance of a finding of no significant degradation, which allowed the project to proceed without further environmental review and/or conditions. Similarly, here, the CMPs submitted by Loadout and Fola, and information on compensatory mitigation in general, served as the rationale and pivotal data which allowed the Corps to determine that the Loadout and Fola permits would not cause or contribute to significant degradation.
21
The Loadout and
In sum, because information concerning proposed mitigation was not submitted by either permittee, in initial or final form, until after public notice was issued and comment closed on the Loadout and Fola applications,
23
the notices at issue failed to provide the public an adequate opportunity to comment. As in
Hall,
the failure to subject any substantive information on mitigation to public review and comment “had the effect of shielding the essential data and the agency’s rationale from public hearing and comment,”
see Hall,
Although the district court in
Wood
found public notice sufficient, its reasoning does not compel a different result.
See
The Wood Court’s decision is not contrary to this Court’s conclusion. The ultimate purpose of the notice provisions contained in the CWA and CWA Guidelines is to ensure that a permit issued pursuant to the statute complies with the statutory intent to “restore and maintain the chemical, physical, and biological integrity of the Nation’s waters,” 33 U.S.C. § 1251, by minimizing potential adverse effects on the environment. See 40 C.F.R. § 230.10; 33 C.F.R. § 320.4. Thus, a post-comment change to a permit application that reduces adverse environmental effects does not warrant the same consideration as a post-comment CMP, monitoring plan, pivotal data, or other rationale that provides the basis for a determination of no significant degradation. Wood can therefore be distinguished on the facts. In Wood, the plaintiffs contested a post-comment change that reduced adverse impacts. Thus, the opportunity for comment that the Wood plaintiffs sought would not have affected the Corps’ ultimate determination of no significant degradation. Here, on the other hand, Plaintiffs argue that notice was deficient because no information was released before the Corps’ determinations of no significant degradation were made. Therefore, Plaintiffs seek to uphold their procedural right to participate in the Corps’ public interest review. The Wood plaintiffs, on the other hand, sought additional opportunity to comment after the relevant public interest review was concluded and the determination of no significant degradation made. Accordingly, Wood is not contrary to this Court’s finding that a complete lack of substantive information on mitigation rendered the Loadout and Fola Notices deficient. The absence of such information shielded essential data and detail from public review and comment and prevented the public from commenting intelligently on the adverse impacts associated with each application.
As is discussed more fully in the NEPA section of this Opinion and Order, the Corps’ responses to Plaintiffs comments on the Loadout and Fola Notices support this conclusion. Plaintiffs submitted a 29-page comment letter in response to the Loadout Notice and a similarly detailed letter in response to the Fola Notice. However, when responding to Plaintiffs’ comments, the Corps repeatedly criticizes Plaintiffs’ comments for their lack of project-specific information and analysis. Thus, the Court finds that the Corps’ responses to Plaintiffs’ comments are more indicative of the deficiency of the relevant notices, rather than a lack of diligence on the part of the Plaintiffs, because it is clear that: (1) Plaintiffs attempted, to the best of then-ability, to provide meaningful comments on the expected adverse impacts of and mitigation associated with the companies’ proposed projects; and (2) Plaintiffs were forced to make general comments which lacked project-specific information because such project-specific information was not provided to them.
C. The Corps Failed to Comply With the Notice Requirements in NEPA.
NEPA contains lofty goals; including the goal of encouraging a productive
NEPA does not contain specific public comment and review procedures. Nonetheless, federal courts — including the Fourth Circuit — have consistently held that public involvement lies at the center of NEPA’s procedural requirements.
See, e.g., Block,
Here, the existence of sufficient compensatory mitigation — or the lack thereof — is the “truly significant” issue with regard to the Corps’ determination whether the Loadout and Fola § 404 permits comply with the no significant adverse environmental effects standard established in the CWA, CWA Guidelines and NEPA. Therefore, in an argument that mirrors their claim under the CWA, Plaintiffs’ NEPA challenge alleges that the complete lack of substantive information on mitigation provided in the Fola and Loadout Notices rendered the notices deficient under NEPA. As discussed, the Court agrees with Plaintiffs that mitigation is the centerpiece of a determination of no significant degradation and/or a FONSI issued with respect to a § 404 permit for a mountaintop mine. For, it is site-specific mitigation measures that allow the Corps to: (1) issue such determinations, and (2) issue a permit without further environmental review.
Id.
The Court therefore agrees with Plaintiffs that a public notice that contains no substantive information on mitigation is deficient under NEPA. In this case, the notice not only fails to concentrate on the “truly significant” issues posed by the application,
see
40 C.F.R. § 1500.1(b), but it also fails to “solicit appropriate information from the public,”
see
40 C.F.R. § 1506.6(d), meaning the agency has failed to (1) “make [a] diligent effort[ ] to involve the public,”
see
40 C.F.R. § 1506.6(a), and (2) “involve ... the public ... to the extent practicable.”
See
40 C.F.R. § 1501.4(b). Consequently, a public notice containing no substantive information on mitigation violates the CEQ Guidelines related to agency requirements for public involvement and deprives the public of its procedural right to an adequate opportuni
This determination — that the Corps failed to comply with the public involvement requirements presented by NEPA— is supported by case law. To begin with, the parties agree that the operable standard regarding the NEPA claim in this case is found in
Bering Strait Citizens for Responsible Resource Development v. U.S. Army Corps of Engineers,
where the Ninth Circuit held that “[a]n agency, when preparing an EA, must provide the public with sufficient environmental information, considered in the totality of the circumstances, to permit the members of the public to weigh in with their views and thus inform the agency decision-making process.”
Although the Ninth Circuit rejected the
Bering Strait
plaintiffs’ argument regarding the circulation of the draft EA, in addition to articulating the standard quoted above, the Circuit Court opined that, with respect to public involvement, “[t]he way in which the information is provided is less important than that a sufficient amount of environmental
information'
— as
much as practicable
— be provided so that a member of the public can weigh in on the significant decision that the agency will make in preparing the EA.”
Id.
at 953 (emphasis supplied) (quoting
Sierra Nevada Forest Prot. Campaign v. Weingardt,
Even though the Ninth Circuit found the notice sufficient in
Bering Strait,
the case’s reasoning supports Plaintiffs’ claim here, where, “considered in the totality of circumstances,” mitigation is the most crucial issue affecting the Corps’ decision to issue a FONSI for a mountaintop mine. Under
Bering Strait,
as much information on mitigation as practicable must “be provided so that a member of the public can weigh in on [this] significant decision.”
Id.
In order to “weigh in,” the public must have the relevant environmental information early — i.e.
before
the close of the public comment period.
See
40 C.F.R. § 1500.1(b). The term “practicable” therefore poses the same content-timing predicament for public notice that was discussed in the CWA portion of this decision. Because a public notice must issue early, it often must issue when some information critical to the decision-making is lacking. Nonetheless, according to the CEQ Guidelines, the public notice must not issue un
As discussed earlier, the truly significant issue with respect to the Corps’ approval of the Loadout and Fola permits was the adequacy of the proposed mitigation measures to compensate for the projects’ adverse environmental impacts. To be adequate, the Loadout and Fola Notices must therefore provide sufficient information— as much as practicable — to allow the public to weigh in on this question.
As evidence that the Corps failed to involve the public to the extent practicable, Plaintiffs cite the Corps’ circulation of the relevant mitigation plans and decision documents to state and federal agencies for review and comment. Tr. for Mot Hr’g on August 20, 2009 (Doc. 161), 19-20. Plaintiffs contend that if it was practical for the Corps to circulate these documents to be reviewed and commented upon by state and federal agencies, then it was practicable for the Corps to, at a minimum, release some substantive information on mitigation for public review and comment. Considered in light of the fact that the Corps’ decision on the Loadout application was made approximately nine months after the submission of the company’s EID and the initial CMP, and the fact that the agency’s decision on the Fola application was made approximately a year and a half after the submission of the project’s CMP, the Court agrees.
Next, as evidence that the Corps did not provide Plaintiffs with an adequate opportunity to weigh in on the FONSIs issued for the Loadout and Fola permits, Plaintiffs cite the Corps’ responses to the comments Plaintiffs submitted in reply to the relevant public notices. First, with respect to the Loadout application, in response to the Plaintiffs’ comment that “1) the proposed mine will cause or contribute to significant degradation ... 2) the mitigation plan is inadequate to offset those negative environmental impacts; [and] 3) the fill does not comply with state water quality standards ... ”, the Corps refers Plaintiffs to the CMP “for further details” and criticizes Plaintiffs for “[a]t no time ... identifying] the existing water quality at the site proposed in the application.” See Corps’ Response to Comments on Loadout Application (Doc. 138-1), 2 (emphasis in original). In response to Plaintiffs’ comment regarding the ability of the expected Loadout CMP to adequately compensate for lost stream function, the Corps replies, “The revised [CMP] follows guidelines defined and in accordance to RGL 02-2. The comments do not apply to the type of mitigation proposed and are clearly written with no knowledge of the proposed project. Please refer to the CMP for more detail.” Id. at 17. And, in response to Plaintiffs’ comment that “[the Corps] cannot logically conclude that the mine will have no significant impact on the environment,” the critical determination required by the CWA and NEPA, the Corps answers, “These comments are largely irrelevant to the Corps analysis, and cannot serve as the basis for requiring an [EIS] on [sic.] denying the permit.” Id. at 38.
The Corps found Plaintiffs’ comments “irrelevant” because “the Environmental Organizations can present neither new information nor new analysis of the information applicable to the proposed permit activity[.]”
Id.
However, Plaintiffs argue
The Court agrees with Plaintiffs’ argument. Id. at 10 (“So what they were doing was criticizing us for lack of specificity, but the whole reason we couldn’t be more specific is because the Corps had withheld the information that we needed.”). Environmental organizations could not adequately “identify the existing water quality at the site proposed in the application,” comment on whether the project would cause or contribute to significant degradation, or comment on whether the mitigation plan was adequate to offset negative environmental impacts because the Loadout Notice failed to provide these organizations with site or project-specific information on mitigation. Without such information, Plaintiffs were forced to submit their comments “with no knowledge of the proposed project.” Consequently, the Corps’ dismissal of Plaintiffs’ comments for lacking or otherwise failing to take into account information the agency should have provided is unreasonable, arbitrary and capricious. The Corps’ responses to the Plaintiffs’ Loadout comments are therefore evidence of the deficiency of the Loadout Notice, not of Plaintiffs’ lack of diligence or understanding. Similarly, the Corps’ finding that “[n]o compelling evidence has been provided to this office which would indicate th[e] project would result in significant impacts to the quality of the human or aquatic environment,” see Loadout CDD (Doc. 86-4) at 88, is more a reflection of the sparsity of information contained in the Loadout Notice than of an actual lack of significant adverse impacts.
The Corps’ responses to Plaintiffs’ comments on the Fola permit application also demonstrate the deficiency of the Fola Notice.
See
Fola DD (36-7) at 129 (“The comments and issues contained in the [Appalachian Center’s] letter appear to be the same or very similar to comments that have been submitted to almost every [Corps’] application that has been submitted to the Corps for the past several years. The comments are very general in nature and contain little specific content regarding the applicant’s proposed project referenced in Public Notice 200400967.... Speculative, unsupported or unsubstantiated impacts are not considered probable and, since most of the [Appalachian Center’s] comments contain little, if any, information regarding specific impacts associated with the proposed activities, such comments do not fall in the required probably category for consideration by the Corps.”). The Fola Notice did not provide Plaintiffs sufficient information to weigh in on the probable adverse impacts of the Fola application and, because it failed to disseminate adequate site and/or project-specific information to allow Plaintiffs to understand and/or comment upon the project’s environmental effects and/or
Taken together, the distribution of the Loadout and Fola Notices to federal and state agencies and the Corps’ dismissal of Plaintiffs’ comments as “too general” to warrant substantial responses demonstrate the Corps’ failure to meet the standard for the sufficiency of public notice and comment established in Bering Strait. With no substantive information on mitigation, the Loadout and Fola Notices provided neither Plaintiffs nor the public in general as much information as practicable to allow for a meaningful opportunity to weigh in on the truly significant issues presented by the Loadout and Fola applications. As such, the Loadout and Fola Notices were deficient under NEPA and the CEQ Guidelines.
This conclusion is supported by the Eastern District of California’s decision in
Sierra Nevada Forest Protection Campaign v. Weingardt,
a case the Ninth Circuit relied upon in
Bering Strait.
The Weingardt holding supports Plaintiffs’ claim, for the facts in Weingardt are similar to the facts here. In both cases, the information contained in the public notices was minimal and the information critical to the relevant agency’s EA analysis — hundreds of pages of such information — was released post-notice and post-comment. Further, because the information was released post-notice and post-comment, in both cases, the public was denied an opportunity to meaningfully comment on the proposed project. Id. (finding that “the [USFS] failed to give the public an adequate pre-decisional opportunity for informed comment”).
In opposition to Plaintiffs’ NEPA claim, the Corps and the Intervenor-Defendants cite a series of federal circuit court cases to support the proposition that “[f]ederal courts around the country are uniform in rejecting claims that certain documents such as EAs, EIDs and CMPs are required to be drafted and circulated for public comment automatically.” Loadout’s Mem. in Opp. to PI. ’s Mot. for Summ. J. (Doc. 127), 9. These cases, however, do not convince the Court that Plaintiffs’ NEPA claim is without merit.
A finding that a specific document (i.e., the CMP) must be circulated for public review and comment is not essential to this Court’s finding that the Loadout and Fola Notices were deficient under NEPA. Plaintiffs’ NEPA claim is not that the Corps was required to circulate the Load-out and/or Fola CMPs for public review and comment, but rather that the mini
IY. Conclusion
With respect to the Loadout and Fola Notices, the Corps failed to comply with its regulatory duties under the CWA, NEPA and the APA because it failed to provided notices that either (1) provided a clear understanding of the nature and magnitude of the Loadout and Fola proposals, or (2) allowed the public to be involved to the extent practicable in the permit process. As a result, the Court FINDS the Loadout and Fola Notices deficient under law and ORDERS that Plaintiffs be provided the remedy outlined below.
Finally, in conclusion, the Court finds it prudent to note that this litigation could have easily been avoided and the flaw in the original Loadout and Fola Notices easily remedied if the Corps had issued supplemental notices in the instant ease. With regard to the Loadout and Fola applications there were periods of approximately nine months and nearly a year and a half, respectively, between the time the company submitted a CMP and permit approval. Although supplemental notice is discretionary,
see, e.g.,
33 C.F.R. § 325.2(a)(2);
B & B P’ship v. United
V. Remedy
The Court GRANTS Plaintiffs’ motions for summary judgment on the ground that the Loadout and Fola Notices were deficient and DENIES the motions for summary judgment filed by the IntervenorDefendants on these grounds. Additionally, the Court HOLDS IN ABEYANCE Fola’s motion for summary judgment insofar as it pertains to Plaintiffs claims related to selenium discharges and GRANTS Intervenor-Defendants’ motions for summary judgment insofar as they are controlled by the Fourth Circuit’s decision in
Ohio Valley Environmental Coalition v. Aracoma Coal Company,
Further, because the Court FINDS the public notices for the Nellis and Ike Fork surface mines deficient, the Court REMANDS Permit No. 200100895 (Loadout) and Permit No. 200400967 (Fola) to the Corps for the limited purpose of correcting this procedural flaw. Consistent with the reasoning provided in this Opinion and Order, the Court ORDERS the Corps to: (1) re-issue an amended notice for each permit, (2) receive and respond to comments on the revised notices, and (3) reconsider each permit with any new comments in mind. However, because the Court is sensitive to the substantial mining activity Loadout and Fola have conducted under the existing Nellis and Ike Fork surface mine permits, and because the Court realizes that the procedural flaw identified by Plaintiffs did not stem from any wrong-doing on the part of the mining companies, the Court STAYS the effect of this Opinion and Order for 60 days. The stay is GRANTED so that the parties may have an opportunity to appeal this decision and/or to seek other desired relief. Over the course of the stay, Loadout and Fola may continue to conduct limited mining activities in accord with any existing agreements between the parties and any previous Opinions and/or Orders by this Court.
The Court DIRECTS the Clerk to send a copy of this written Opinion and Order to counsel of record and any unrepresented parties.
MEMORANDUM OPINION AND ORDER
Pending before the Court is IntervenorDefendants Loadout, LLC and Coal River Mining, LLC’s (hereinafter jointly referred to as “Loadout”) Motion for Relief from November 24, 2009, Order (Doc. 171). For the following reasons, the motion is DENIED.
Background
This action was filed by complaint of the plaintiffs on August 7, 2008. Since that time, the case has transformed at several junctures, with the addition and termination of parties and claims, and the entry of various orders by this Court granting or denying the parties’ requested relief. In particular, on November 24, 2009, this
The effect of the November 24, 2009, Order was initially stayed for 60 days, or until January 25, 2010. It has since been the subject of additional stays. First, on December 28, 2009, the Court granted an unopposed motion for a limited stay filed by Fola, which allows that company to continue to use the valley fills on which it had previously been allowed to conduct mining activity prior to the entry of the Court’s November 24, 2009, Order. This limited stay allows Fola to conduct such filling and other mining activity pending further order by this Court. Subsequent to the Court’s December 28, 2009, Order granting Fola’s motion, on January 5, 2010, Loadout filed the instant request. The Court then stayed the effect of its November Order on Loadout’s operations, pending resolution of this motion.
The Corps has informed the Court that it will not take a formal position on the motion. The plaintiffs, on the other hand, have filed a response in opposition.
Standard of Review
Loadout moves the Court, pursuant to Rule 60(b) of the Federal Rules of Civil Procedure, to grant relief from its November 24, 2009, Order and allow the company to “re-commence work and fill in the remaining jurisdictional waters in Dave Fork 1 and Dave Fork 2 Valley Fills[,]” where it contends “substantial filling of waters of the U.S. have already occurred.” Load-out’s Mot. for Relief (Doc. 171), 1. Although not specifically identified as such, the Court construes Loadout’s Rule 60 motion as a request for relief pursuant to Rule 60(b)(6), which allows the Court to “relieve a party or its legal representative from a final judgment, order, or proceeding for ... (6) any [ ] reason that justifies relief.” F.R. Civ. Pro. 60(b)(6).
The Court has broad discretion when considering a Rule 60(b)(6) motion.
See, e.g., Werner v. Carbo,
Discussion
Loadout’s motion for relief is premised upon a few major arguments: (1) because the remand of its permit was for the limited purpose of correcting the procedural flaw in its public notice and summary judgment was granted to the intervenor-defendants on all substantive issues, granting the requested relief would not interfere with the November Order’s purpose or conclusions, because it would not affect the re-noticing of Loadout’s permit; (2) be
Many of Loadout’s arguments can be dealt with simultaneously. First, the Court finds Loadout’s arguments: (1) that a stay would not affect the plaintiffs’ procedural rights, as vindicated by the November 24, 2009, Order, (2) that the relevant environmental harm has already occurred, and (3) that a stay would not prejudice the plaintiffs unconvincing. 1
As discussed in the November 24, 2009, Order, “[a litigant] who alleges a deprivation of a procedural protection to which he is entitled never has to prove that if he received the procedure the substantive result would have been altered. All that is necessary is to show that the procedural step was connected to the substantive result.”
Sugar Cane Growers Coop, of Florida v. Veneman,
The procedural right at the center of the plaintiffs’ motion for summary judgment was their right to meaningfully comment on Loadout and Fola’s § 404 permits. The Court found such right was violated and, in its Order, sought to remedy this error by specifically directing the Corps to re-issue an amended notice for each permit. Further, the Court ordered the Corps to (1) receive and respond to comments on the revised notices, and (2) reconsider each permit with any new comments in mind.
See
Doc. 165, 54. To insure the plaintiffs’ right to comment is meaningfully protected, this re-noticing and comment must occur
before
further environmental harm is authorized under the permit.
See, e.g. National Wildlife Federation v. Marsh,
To date, Loadout’s Nellis Surface Mine permit has not been re-noticed. Further, Loadout has provided no evidence showing that it ha§ requested the Corps re-notice its permit or that the company has otherwise attempted to correct the procedural flaw identified in the November 24, 2009, Order. Instead, Loadout requests that the Court allow it to continue to operate under its procedurally-flawed permit.
The Court declines to do so. Allowing Loadout to continue operations at the Nellis Surface Mine without requiring re-noticing would prejudice the plaintiffs because it would deprive them of their right to meaningfully comment. 2 Additionally, although Loadout is correct that substantial environmental harm did occur under the Nellis Surface Mine permit prior to the Court’s November 24, 2009, Order, 3 this harm is not complete and the harm that would result from granting Loadout’s motion is not insignificant. See Pl. ’s Mem. in Opp. (Doc. 176), 2-4.
If the Court granted Loadout’s request, it would allow for the completion of the Dave Fork 1 and Dave Fork 2 Valley Fills, which would result in the filling of approximately 5,400 linear feet of stream.
Load-out’s Combined Decision Document
(Doc. 86-3), 3. When combined with the existing fill at Wilderness Fork Valley Fill, this would result in the filling of approximately 9,211 linear feet of stream, or approximately 82.5% of the total permitted stream to be filled.
Id.
Although, as noted, the parties disagree as to (1) the exact amount of stream in the Dave Fork area that has been filled to date, and (2) about whether (and how) the permanent sediment pond should be counted when determining environmental harm,
4
regardless of how the pond is counted and regardless of the ex
Thus, the Court FINDS that allowing Loadout to continue to fill the Dave Fork valleys and to cause such environmental damage without: (1) the plaintiffs’ consent, or (2) a strong evidentiary showing of the economic dependence of the local community on the Nellis Surface Mine is not appropriate. Loadout has provided neither and the Court therefore FINDS its motion should be DENIED.
The Court FINDS this ruling is consistent with previous Opinions and Orders by this Court and with Judge Goodwin’s decision in
Ohio Valley Environmental Coalition v. Bulen,
For example, in the April 20, 2007, Memorandum Opinion and Order in the
OVEC v. U.S. Army Corps of Engineers
case (3:05-cv-0784), which is cited by both parties in their briefing, and which granted a limited stay of a permanent injunction allowing several mining companies to continue to work in those valley fills already partially constructed, the Court specifically noted the plaintiffs’ lack of opposition as a factor in its decision.
Id.
at 2-3 (“[The] harm to the Intervenors is purely a temporary, economic harm, which ordinarily would not warrant a stay pending appeal. Here, however, Plaintiffs do not oppose a stay ... As a result, this factor favors granting [such] a stay[.]”) (internal citations omitted). The salience of the plaintiffs’ consent is particularly evident in this Memorandum Opinion and Order because, there, the Court decided whether to (1) grant a general stay of its permanent injunction, or (2) grant a limited stay consistent with an agreement between the par
This Court’s decision to deny Loadout’s motion is also consistent with the decisions made by this Court, during the pendency of this action, with regard to Fola and its Ike Fork permits. With respect to Fola, the Court’s most recent Order granted the company’s unopposed motion for relief from the November 24, 2009, Order. See Doc. 170. This motion is distinguishable from the instant motion (1) because it was unopposed, and (2) because it simply continued a then-existing stay which allowed Fola to operate in certain valley fills and which had been ordered prior to the Coui't’s November 24, 2009, decision. Id. Thus, the Court’s decision to grant Fola’s motion does not provide strong support for Loadout’s requested relief.
Additionally, the Court’s decision to deny Loadout’s motion is consistent with its October 31, 2008, Memorandum Opinion and Order, in which the Court granted the plaintiffs’ motion for a preliminary injunction against Fola and then stayed this injunction with respect to certain valley fills. See Doc. 77. This Memorandum Opinion and Order is distinguishable because: (1) the stay granted therein represented the Court’s adoption of a suggested stay proposed by the plaintiffs, see Doc. 77, 12, and (2) this suggestion followed a three-day hearing, held October 22-24, 2008, during which Fola presented ample evidence to establish the unique economic dependence of Clay County on the Fola Coal Company. As recognized by the plaintiffs, this unique relationship and dependence was a significant factor warranting the requested relief. See generally id.
Recognizing the significant role the plaintiffs’ opposition, or lack thereof, has played in this Court’s decisions, the stay which most closely resembles the type of relief requested by Loadout is the modification and further stay of the Court’s October 31, 2008, permanent injunction, which the Court granted on August 21, 2009. See Doc. 160. This decision provides the strongest support for Loadout’s motion because the Court granted Fola the stay despite opposition from the plaintiffs.
Still, the August 21, 2009, decision is distinguishable herein. First, this limited stay was granted prior to the Court’s November 24, 2009, Order, which provided a decision on the merits and conclusively identified Loadout and Fola’s § 404 permits as procedurally-flawed. Further, in resolving to grant a limited stay to Fola, the Court relied upon the substantial evidence the company presented, over the pendency of the litigation, to demonstrate the peculiar reliance of the Clay County economy on its Ike Fork permits. Such evidence was presented over the three-day hearing held October 22-24, 2008; at a second hearing on August 20, 2009; and in the multiple affidavits Fola attached to its motions, affidavits which attested (1) that, at each step, the company continued to adhere to its SMCRA mining plan, (2) to the amount of time the particular relief requested would allow the Ike Fork Surface Mines to continue to operate, (3) to the number of employee jobs the requested relief would preserve, and (4) to the fact that employees would find employment opportunities scarce in Clay County, in the case of denial and subsequent layoffs. Using this evidence and testimony, Fola convinced the Court that a limited stay was warranted, despite the plaintiffs’ opposition. 5 See, e.g., Doe. 160, 3-4.
In conclusion, the critical factors the Court considers when resolving this motion are not merely whether the pertinent valley fills have been commenced or whether the mining company has expended financial resources with the expectation of recouping these resources through mining. See, e.g., Doc. 295 (3:05-cv-0784) (“[The] harm to the Intervenors is purely a temporary, economic harm, which ordinarily would not warrant a stay pending appeal.”); Amoco Production Co., 480 U.S.at 545 (“Environmental injury, by its nature, can seldom be adequately remedied by monetary damages and is often permanent or at least of long duration, i.e., irreparable. If such injury is sufficiently likely, therefore, the balance of harms will usually favor the issuance of an injunction to protect the environment.”). Instead, this Court has and continues to consider additional factors, including: the significance of the environmental harm that would be authorized under the requested stay; any procedural or other rights affected by the requested stay; the plaintiffs’ opposition, or lack thereof; and whether the company requesting the stay has provided a sufficient evidentiary basis — in light of the specific facts pertinent to the permit at issue — to conclude that the public interest warrants relief. Consideration of such factors attempts to achieve a balance between the importance of the contribution of coal to this State’s economy and the value of preserving and protecting the State’s tremendous natural resources. Further, consideration of such factors leads the Court to DENY Loadout’s motion, for, in light of the plaintiffs’ opposition, and in the absence of any unique economic relationship between the Nellis Surface Mine and Boone County, neither Loadout’s expenditures to date nor the public interest warrant granting the motion.
The motion is therefore DENIED and the Court’s November 24, 2009, Memorandum Opinion and Order remains in full effect insofar as Loadout’s operations are concerned. The Court DIRECTS the Clerk to send a copy of this Memorandum Opinion and Order to counsel of record and any unrepresented parties.
Notes
. In their motion papers, Plaintiffs state they are moving for summary judgment on “Count One of their Third Amended Complaint ... that the Corps violated its obligations under [the CWA] and [NEPA] to provide adequate notice and comment and to involve the public in its environmental impact analysis when it issued an individual permit under § 404 of the CWA for Loadout, LLC's Nellis Surface Mine.” See Doc. 112. This claim, however, appears as Count 5 in Plaintiffs’ Third Amended Complaint. The Court therefore addresses summary judgment with respect to Count 5.
. This includes the Corps' findings regarding: the impact of the permitted fills on the structure and function of affected streams; the sufficiency of the proposed mitigation measures for purposes of CWA and NEPA; and the Corps' NEPA and CWA assessments of cumulative impacts. Id. at 197.
. According to this review, the decision to issue a permit "should reflect the national concern for both protection and utilization of important resources.” 33 C.F.R. § 320.4(a)(1).
. The Corps CWA regulations were amended in 2009. Thus, this opinion cites to the 2007 version of the Corps' CWA regulations — the operative regulations at the time of the Nellis and Ike Fork mines’ permit evaluations and issuance. The 2009 version of the CWA regulations contains a requirement that "[f]or activities involving discharges of dredged or fill material into waters of the United States, the application must include a statement describing how impacts to waters of the United States are to be avoided and minimized. The application must also include either a statement describing how impacts to the waters of the United States are to be compensated for or a statement explaining why compensatory mitigation should not be required for the proposed impacts.” 33 C.F.R. § 325.1(d)(9) (2009). The Corps and Intervenor-Defendants cite this revision as evidence that no statement on mitigation was necessary to render a public notice sufficient under the 2007 CWA regulations. The Court finds this argument unpersuasive, however. The decision to amend the CWA regulations in 2009 to specifically state that information on mitigation is necessary to complete a § 404 application is not convincing evidence that such information was not required under the 2007 version of the regulations, for, as readily as the change in regulations can be attributed to a previous lack of the necessity to include information on mitigation, the revision can be seen as clarifying and explicitly stating a previously implied requirement. This is especially true in light of the fact that standard established in 33 C.F.R. § 325.2(a)(2), which establishes the standard for the sufficiency of public notice, did not change in 2009.
. According to 33 C.F.R. § 325.1(d)(3), this should be done “unless” one of a set of specific circumstances exists, including: "[¡Information needed by the district engineer for a decision on the application cannot reasonably be obtained within the 60-day period." 33 C.F.R. § 325.2(d)(3)(vi). Said differently, the regulations create a presumption that once an application is deemed complete a decision should be made on that application within 60 days. Further, in the case where it is unreasonable that all the information required to make the decision be obtained within 60 days, the regulations provide that "[o]nce the cause for preventing the decision from being made within the normal 60-day period has been satisfied or eliminated, the 60-day clock will start'running again from where it was suspended,” id..; meaning that even if the decision cannot be made 60 days after the initial determination of completion, the clock is reset and the Corps is still required to abide by the 60-day time limit as soon as all the necessary information is available.
. Pursuant to 33 C.F.R. § 325.2(d)(2) the comment period on a § 404 permit application may not be less than 15 days nor more than 30.
. A total of ten maps and drawings are attached to the notice. As a whole, the drawings are skeletal in nature, providing basic information regarding the structure, size, and location of the proposed valley fills.
. The Loadout EID is 63 pages long, with 245 pages of attached appendices, for total length of 308 pages. See, e.g., Id.; Attached Appendices F & H (Docs. 86-7 & 86-9).
. The combined length of the Loadout CMP and its supplements is 397 pages.
. In addition to responding to their comments in the CDD, the Corps sent Plaintiffs a forty-page document which replies to each of their comments on the Loadout Notice. Corps' Response to Loadout Comments (Doc. 138-1). Again, the majority of these responses expressly refer Plaintiffs to the Loadout CMP (or the Loadout EID) for answers to their concerns. Id.
. For example, the Fola Notice contains standard language on subjects such as: the purpose of the Notice, the relevant regulatory program, § 404 of the CWA, the § 401 water quality certification requirement, the public interest review, and the process for public comment.
. The Fola Notice does not contain any maps or drawings, however. Instead, there are two tables attached to the notice: a table depicting the acreage of the affected drainage areas by valley fill and a table portraying, in linear feet, the permanent and temporary impacts to intermittent and ephemeral streams. See Fola Notice (Doc. 36-2), Attached Tables.
. The only information the Fola Notice contains relating to mitigation is found in the section entitled “Mitigation Plan,” which states, in total, “To date, the applicant has not submitted a compensatory mitigation plan to this office.” Fola Notice (Doc. 36-2).
. According to Plaintiffs, the Fola CMP, its supplements, and the Fola EID together total 487 pages. Pi's Mem. In Opp. To Fola’s Mot. For Partial Summ. J. (Doc. 140), 3.
. According to the Corps’ argument on August 20, 2009, "[t]he clear purpose of [the 15-day] statutory requirement is to put the notice out early in the process so that people can have input, rather than very late in the process when all of the data and information has been gathered and the process is nearly complete.” Tr. for Mot. Hr'g on August 20, 2009 (Doc. 161), 24.
. See also 33 U.S.C. § 1344(q) (requiring that, “to the maximum extent practicable,” a permit decision be made within 90 days of the issuance of public notice); 33 C.F.R. § 325.1(d)(3) (requiring that the Corps decide on a § 404 permit application “not later than 60 days after receipt of a complete application”).
. As discussed earlier, 33 C.F.R § 325.1(d)(9) provides that "[a]n application will be deemed complete when sufficient information is received to issue a public notice (see 33 C.F.R. 325.1(d) and 324.3(a).)” 33 C.F.R § 325.1(d)(9). 33 C.F.R. § 325.1(d) describes the "Content of [a § 404] application” and, for the most part, such content is not at issue here. In fact, the only section of 33 C.F.R § 325.1(d), besides 33 C.F.R § 325.1(d)(9), which refers directly to public notice is 33 C.F.R § 325.1(d)(1), where the regulation provides that an "application must include a complete description of the proposed activity including necessary drawings, sketches, or plans sufficient for public notice (detailed engineering plans and specifications are not required) ... See § 325.3 for information required to be in public notices.” 33 C.F.R § 325.1(d)(1). Thus, in both instances where a portion of 33 C.F.R. § 325.1(d) mentions public notice the regulation specifically refers to 33 C.F.R. § 325.3 as providing the standard for the sufficiency of a notice. 33 C.F.R. § 325.3 therefore provides the stan
. See Corps’ November 2, 2004, Letter to Fola, § 1(C)(2) supra (stating a compensatory mitigation plan is required to process the Ike Fork permit application and to "conclude the project is consistent with Section 404(b)(1) Guidelines”); Fola DD (Doc. 36-5), 45 ("In order to compensate for construction-related impacts, the applicant has proposed on-site mitigation.”); Id. at 56 ("Impacts to aquatic ecosystems would be mitigated via the applicant’s CMP.”); Loadout CDD (Doc. 86-3), 18 ("As required by the Section 404(b)(1) Guidelines, a permit to discharge fill material into waters of the United States would not be granted if it is determined the proposal would cause or contribute to significant degradation of waters of the United States.... If impacts cannot be avoided, impacts must be minimized to the maximum extent practicable. Following minimization of impacts, all unavoidable impacts must be compensated for through mitigation activities!!.]”); Id. at 37 ("[I]f the stream creation and restoration activities are implemented in accordance with the proposed compensatory mitigation plan, it is expected the created streams would maintain most of their functionality of the impacted streams upon maturity. There would be a temporal loss of function during the mining activities at the site, but these losses would not be permanent.”); Id. at 50 ("It is not expected the proposal would result in long-term significant impacts to aquatic, terrestrial and avian wildlife values as ... [t]he applicant has proposed a compensatory mitigation plan that would replace the lost headwaters streams with newly created headwater streams at the site ... For these reasons, the Corps anticipates no significant impacts to macrovertebrate values!].]”).
. Because it is not necessary to the resolution of the instant motion, the Court does not decide what type, or how much, information on compensatory mitigation would be sufficient to meet the standards articulated above. Such a determination is a fact-intensive inquiry and, for the purposes of this motion, it is sufficient to conclude that a public notice that contains no substantive information on mitigation denies the public a procedural right to meaningful comment and review. Further, implicit in the Court’s finding that the Load-out and Fola Notices were deficient is the finding that the Loadout and Fola applications were not complete. Completeness requires the submission of sufficient information to issue public notice, which triggers the standard for sufficiency established in 33 C.F.R. § 325.3(a). With respect to proposed mitigation, the Loadout Notice states, in total, "The applicant has not submitted a Compensatory Mitigation Plan (CMP) to compensate for permanent and temporary impacts to waters of the U.S. that are regulated by USACE.” Loadout Notice (Doc. 86-1). With respect to proposed mitigation, the Fola Notice states, in total, "To date, the applicant has not submitted a compensatory mitigation plan to this office.” Fola Notice (Doc. 36-2). Because a complete lack of substantive information on mitigation renders the notices deficient, according to the regulations, such a lack of information also renders the applications incomplete.
. This review led to conflicting recommendations on the part of the Engineers, with the Division Engineer and the Chief Engineer recommending approval and the District Engineer recommending denial.
.
See, e.g.,
Fola Permit (36-8), Spec. Cond. No. 8 ("The permittee shall implement and abide by the Compensatory Mitigation Plan (CMP) ... Completion of all elements of this CMP is a requirement of the Department of Army permit.”);
id.
at Spec. Cond. No. 9 ("To compensate for unavoidable adverse impacts to waters of the United States, the permittee will ensure the following mitigation measures
. See Section 11(C)(1), supra (Loadout CMP provides that the adverse impacts of the company’s permit will be mitigated by requiring 13,564 feet of ephemeral and intermittent streams be created on-site and that Loadout enhance 8,900 feet of Fork Creek, a stream two miles from the project site); Section 11(C)(2), supra (Fola CMP provides that the adverse impacts of the company’s permit will be mitigated by requiring 36,443.5 feet of ephemeral and intermittent stream creation off-site, 4,885 linear feet of ephemeral and intermittent stream creation on-site and the establishment of 47.4 acres of riparian habitat).
. The facts of this case are as follows. Load-out’s permit was issued on April 21, 2008, nearly two years after the public notice was issued and approximately nine months after the initial CMP was filed. See Loadout Notice (Doc. 86-1); Pi’s Mem. In Supp. Of Their Mot. For Partial Summ. J. (Doc. 113), 2-3. Fola’s permit was issued on March 5, 2008, nearly three years after the public notice was issued and approximately a year and a half after Fola’s initial CMP was filed. See Fola Notice (Doc. 36-2); Fola’s Mem. In Supp. Of Its Mot. For Summ. J. (Doc. 136), 2-3.
. The Corps and Intervenor-Defendants also highlight the fact that Plaintiffs did not request a public hearing on either the Fola or Loadout Notice as evidence that the notices were sufficient. The Court, however, finds this argument unpersuasive. A decision not to request a public hearing on a notice does not render the information contained in that notice sufficient under NEPA. Instead, a decision not to request a public hearing can as readily be attributed to a deficiency in the public notice as it can be considered to demonstrate the adequacy of the notice. For, without sufficient information to identify the truly significant issues presented by a permit application, interested members of the public may not have adequate information upon which to base a hearing request.
. As noted, the fact that the plaintiffs (1) find the environmental harm that would result from granting the requested relief significant, and (2) object to Loadout's motion plays a significant role in the Court’s rejection of these arguments.
.In its motion, Loadout stresses the fact that it provided notice of its intention to mine in March 2008, as evidence that granting its requested relief would not prejudice the plaintiffs. However, the notice Loadout provided was the result of a December 17, 2008, Order by this Court, see Doc. 104, and, on March 23, 2008, Loadout agreed not to discharge any additional dredge and fill material in jurisdictional waters of the Dave Fork Valley Fills or the Mech Fork Valley Fill, outside of a small 40-foot culvert necessary for a road, without additional notice to the plaintiffs, in exchange for the plaintiffs' agreement not to seek a TRO. See Doc. 171-1 (April 1, 2009, letter memorializing this agreement). According to the parties, no filling of jurisdictional waters or subsequent notice of an intention to fill the jurisdictional waters at the Dave Fork Valley Fills has occurred since that time. As a result, the Court finds that Loadout has not provided sufficient evidence to obviate the plaintiffs’ claim of prejudice.
. Although the parties disagree as to the exact percentage of filling that has occurred to date, they agree: (1) that the permitted filling in the Wilderness Fork Valley Fill is complete, and (2) that some filling of the Dave Fork 1 and Dave Fork 2 Valley Fills occurred between March 11 and March 23, 2008. As a result, it is evident that, at a minimum, 3,811 linear feet, or approximately 34% of the total linear feet of stream permitted to be filled under Loadout’s permit, were filled prior to the November 24, 2009, Order. Loadout’s Combined Decision Document (Doc. 86-3), 3 (providing that filling at the Wilderness Fork Valley Fill will result in the filling of 3,811 linear feet of jurisdictional waters). The Court finds that such filling represents “substantial” environmental harm.
. In their Memorandum in Opposition, the plaintiffs argue that “these 907 feet of impacts are actually somewhat environmentally beneficial, and should not even be counted in the
. Fola established: that it is the only mining operation in the county; that the company employs approximately 400 underground and surface miners in Clay County, all of whom depend upon the validity of the Ike Fork permits; that these miners’ average wage is $62,500, making them a substantial part of