159 P.2d 130 | Utah | 1945
Lead Opinion
This is an action at law to recover damages for injuries alleged to have been sustained by plaintiff as a result of *229 the acts of the defendant Wade in driving his truck loaded with cement over a bridge belonging to the plaintiff. The action is brought upon two counts. The first count is based upon the theory of trespass and the second count is based upon the theory of negligence. The cause was tried to the court sitting without a jury and from a judgment in favor of the plaintiff and against the defendant on plaintiff's second count defendant Wade appeals.
Briefly, the facts are as follows: At the time this cause of action arose and for more than fifteen years prior thereto the plaintiff, Ogden Livestock Shows, Inc., was the tenant in possession of certain land in the vicinity of the Ogden Union Stockyards. Upon this land plaintiff had constructed a coliseum for the purpose of conducting an annual livestock show. A large irrigation canal passed immediately in front of the building to the south and adjacent to a public highway over which plaintiff had constructed a wooden bridge to enable visitors to the show to gain access from the highway to the coliseum. The bridge had a span of approximately 38 feet and a width of approximately 20 feet and was supported by five wooden beams, 18 inches by 12 inches. There were no supports under these beams.
There were two bridges owned and maintained by the Union Stockyards over the same canal. At least one of these bridges was of a steel and concrete construction. One was a short distance to the west and the other a short distance to the east of the bridge belonging to plaintiff and were used by the Union Stockyards and the public gaining access to the stockyards.
During the first part of December 1941 defendant Rice was performing certain work under contract for the Union Stockyards on its property, and had purchased certain cement from the Burton-Walker Lumber Company at a price per bag delivered on the job. Defendant Wade had been engaged to deliver this cement and in so doing attempted to cross the bridge of the plaintiff. Before Wade drove upon the bridge he got out of his truck, made an inspection of the bridge and had some conversation with one, *230 Murray, an employee of plaintiff who was working at the coliseum. When Wade drove his truck over the bridge it collapsed.
The testimony showed the weight of the truck to be 6300 pounds and that the load consisted of 240 bags of cement weighing 94 pounds each, or a gross load weight of approximately fifteen tons.
At the conclusion of the plaintiff's case the court on motion of plaintiff dismissed the complaint as against defendant Rice.
The trial court entered judgment against the plaintiff and in favor of defendant Wade on plaintiff's first count in trespass, and entered judgment in favor of the plaintiff and against the defendant on plaintiff's second count in negligence for the amount of $900.
The appellant, defendant Wade, makes four assignments of error which may be grouped and summarized as follows:
(1) That the court erred in granting judgment in favor of plaintiff and against defendant Wade on plaintiff's second count. (2) That the court erred in the admission of certain testimony. (3) That the judgment for $900 is not supported by the evidence.
In its cross assignment of error respondent attacks the action of the court in dismissing its first count based upon the finding that defendant was not a trespasser when he drove his truck upon the bridge of the plaintiff.
It is a principle too well embedded in the law of this state to require extended discussion that in an action at law, the findings of the trial court are conclusive and may not be disturbed by this court if there is competent evidence to support them. Yowell et al. v. Ogden State Bank,
The trial court made and entered its finding number two on plaintiff's second count, as follows:
"2. That during the forepart of December, 1941, the defendant Earl Wade carelessly and negligently drove and operated said heavy truck loaded with cement with a total gross weight of 29,960 pounds over and across said bridge, thereby breaking the same and causing said bridge to collapse; that the said defendant Earl Wade was a trucker by profession; that he knew the weight of his load and before passing over said bridge knew, or by the exercise of reasonable care and diligence, should or could have known that said bridge, by reason of the nature and form of its construction, was not strong enough to support or sustain a loaded truck of such weight and that said bridge was neither constructed nor designed to carry loads of that kind or character thereon, but, notwithstanding such knowledge on his part, the defendant carelessly and negligently as aforesaid drove said truck over said bridge; that defendant, notwithstanding he knew of the excessive weight of said load, further carelessly and negligently failed to ascertain from plaintiff or its officers and agents whether or not said bridge was capable of sustaining said weight before attempting to cross the same."
If there is any competent evidence from which the court was justified in concluding that the defendant Wade was negligent in driving his truck upon the bridge, the finding must be sustained and for this purpose we must refer to the testimony.
The evidence showed that defendant Wade was a trucker by occupation, that he had considerable experience hauling heavy loads over highways and bridges of various construction, that he knew the weight of his load to be approximately fifteen tons, that he thought it to be an unusually heavy load, that there was a question in his mind as to whether the bridge would hold up under his load and he therefore stopped his truck, got out and observed the bridge both from the surface and from underneath. The evidence further showed that the bridge was of wooden structure throughout, supported by five 12 x 18 inch beams or stringers, over a 38 foot span and that there were no supports of any kind under these stringers. Defendant Wade also testified that from all outward appearances the *232 timber seemed to be well preserved and solid and that after his inspection he concluded that the bridge could be safely crossed with his load. The testimony also shows that Wade knew of the presence of the other two bridges in close proximity to the plaintiff's bridge and of their general construction. Wade also testified that he was aware of the fifteen ton load limit posted on the steel viaduct over the railroad yards as he approached the plaintiff's bridge and the general structure of the viaduct with respect to braces and supports.
We are not in disagreement with the holding of the court in the case of Board of Com'rs of Allen County v. Creviston,
The court had an opportunity to see and hear the witnesses and determine from all the testimony whether an ordinary man under all the circumstances attending the incident would have proceeded to cross this bridge with a truck load of cement such as defendant had. The court *233 found this to be negligence. Reasonable men might differ in their conclusions as to whether the facts in such a case would amount to negligence, but we must conclude that there is sufficient evidence to support the trial court in its findings.
The measure of damages sustained through the destruction of improvements to real estate which have no market value is the fair and reasonable value of the thing destroyed at the time of its destruction. Cleary v. Shand,
Appellant contends that it was error to permit the witness to testify to the cost of the construction of the new bridge and the difference between the cost of the new bridge (less the cost of the foot bridge) and the value of the old bridge represented the betterment or increased value of the new bridge over the old. In the case of Kennedy v. Treleaven,
"There is no universal test for determining the value of property injured or destroyed, and the mode and amount of proof must be adapted to the facts of each case. * * * If there be no market value, then other criterion of value must be found, and the best evidence which can be obtained must be produced to show the elements which enter into the real value. * * * The cost of replacing the building, making a proper deduction for its age, utility, use, and condition, is a better measure of what the property was fairly and reasonably worth at the time it was destroyed."
We cannot say that the trial court was in error in admitting this testimony as one of the factors tending to establish the value of the bridge at the time of its destruction.
Plaintiff called one, Campion, a general contractor of twenty years' experience, who testified that he was acquainted with the bridge that had been destroyed, its *234 general construction and condition. He also testified that he constructed a new bridge to replace the one that had been destroyed and that the cost of the new bridge also included the cost of constructing a foot bridge alongside the new bridge. Over defendant's objection the witness was permitted to state that the total cost of constructing the new bridge and the foot bridge was $1352 plus $89 for surfacing the bridge after it had been constructed. This was in addition to one beam of the old bridge that was used in the construction of the new one. He also testified that the estimated cost of constructing the foot bridge was $250.
The witness was then asked if he were in a position to give an opinion as to the value of the bridge immediately before it was broken after giving due consideration the usual life of bridges, cost of replacement, etc. His answer was as follows:
"Well, then, I would say the bridge โ just as a guess, is all I could do โ would be worth eight or nine hundred dollars."
He was asked again whether that amount was his opinion to which he replied that it was.
Appellant contends that the value of $800 or $900 was just a guess and is not sufficient to sustain a judgment for any amount and particularly for $900. From the testimony given we conclude that the answer made by the witness must be taken to mean that from his experience as a builder, not having specific detailed information with respect to the bridge, but considering the replacement costs, that it was his best judgment the value of the bridge was somewhere between $800 and $900.
The testimony of the witness that the value of the property destroyed was $800 or $900, would seem to imply that he did not know whether one amount was more accurate than the other. In such case the higher amount would not preponderate over the lower amount and it would seem that the court would be bound to assess the damages at the lower figure. *235
We conclude that there is no substantial evidence to support the verdict for $900 or any amount in excess of $800. The verdict must be reduced to $800.
Having reached these conclusions it is unnecessary that we consider respondent's cross assignments of 1 error. It follows, therefore, that the judgment of the District Court as modified should be affirmed, respondent to recover its costs.
Concurrence Opinion
I concur in the result reached in the opinion of Judge MORRISON. I agree with Mr. Chief Justice LARSON that the defendant was not negligent in failing to discover any defect in the bridge and that his inspection was such as to preclude a finding by the trier of the facts that it 2 was not such as to meet the requirements of the law as to discovery of defects; but since I am of the opinion that the trier of the facts was not bound to conclude that the bridge collapsed because of the giving away of the deteriorated laminated deck, but may have reasonably found that it gave way because of it being subjected to a strain in excess of its designed capacity, I am of the opinion that the judgment below should be upheld.
At the outset it is necessary to ascertain the legal relationships of the parties involved regarding the use of the damaged bridge for the rights and duties of the parties must be determined in light of such relationships. The land upon which the bridge was located was and is owned by the Union Stockyards. The plaintiff, Ogden Livestock Shows, Inc., constructed a coliseum building on some of the lands owned by the Union Stockyards. On December 1, 1925, these two companies entered into a lease agreement under which the plaintiff was given a right of way across the lands of the Union Stockyards as a means of ingress and egress to and from the coliseum building.
In order to travel from 24th Street in Ogden to the coliseum building over the described right of way, it was *236
necessary to cross a canal. The plaintiff, in order to make its rights under the lease effective, constructed a bridge over the canal. It is this bridge which the defendants damaged. This lease agreement does not mention the bridge or make any express reference to the building of one. However, the owner, of the dominant estate can make such changes on the servient tenement as are necessary for the proper exercise of the easement. Willard
v. Stone,
The right of the stockyards corporation to use the easement as distinguished from the bridge is clear for in this regard the lease expressly provided that the easement was "subject to the joint use of both" the stockyards corporation and the plaintiff. Even aside from such an express provision the right of the stockyards corporation to use the easement could not be questioned. See Stevens v. Bird-Jex Co.,
The defendants are at the most permittees of the stockyards corporation. Defendant Rice was an independent contractor doing construction work for the stockyards corporation. Defendant Wade was delivering a load of cement to defendant Rice and must be held to have been a business invitee of Rice. Thus it can be noted that the plaintiff, occupying the position of the dominant estate holder, constructed a bridge in order to make the grant of the right of way effective. The servient estate holder, the stockyards corporation, reserved a right of joint user over this way. The defendants using the right of way as permittees of the stockyards corporation, had no better right to use the bridge than did the stockyards company. Our problem is one of determining the limitations on the right of the stockyards company to use the bridge.
The case of Herman v. Roberts,
"The idea of a joint use of the land by both parties, in the sense that a use by the grantee should at any time give way to a use by the grantor, is contrary to the plain meaning and intent of the grant. It cannot be supposed that the grantor, when conveying a right of way over an impassable tract of land, intended to restrict his grantee from changing its surface so as to make it passable and available for the purpose of a road, or that, after the road had been so constructed, he had the right to enter upon the land and impair its usefulness, or impose upon the grantee the duty of keeping such impaired road in repair for the benefit of the grantor. The full extent of the rights of the grantor in the soil of the road was to enter thereon, and do such acts only as should not injure or impair the enjoyment of the easement by the grantee, and when he went beyond such use he transcended the rights pertaining to his character as the owner of the soil. The general character of these rights is familiar to all owners of land, because they are common to all whose lands abut upon public roads, and they are varied only by the character of the easements enjoyed, and the terms of the grants under which they are possessed. Unless, therefore, something can be found in the terms of the grant which modifies the easement created, that must be held to be the measure of the rights of the parties. No inference can be drawn from the present grant that it was intended that the grantor should enjoy the unrestricted use of the road, with the privilege of so wearing and using it as to subject the grantee to the labor and expense of keeping it in repair. It is apparent from the character of the property affected, and the use to be made thereof, that the plaintiff expected to construct a carriage road for access to and communication with his residence as a gentleman's country seat. It could not have been contemplated by the parties that such a road was to be used for farming purposes, to draw heavy loads over, and cut it up by the use of the various appliances needed for such purposes. *238 The land over which the road was laid out had never before been so used, and the owner of the soil had theretofore obtained access to his land from the public road by entering upon and traveling over it in other places. The land itself was of small compass, and little value, as it was hilly, rocky, sterile, and unadapted to agricultural uses; and it could not, under the circumstances, have been intended that the road was to be built and used to any considerable extent for farming purposes by either the grantor or grantee.
From this holding it appears that the servient estate owner has the right to use a way constructed by the dominant estate owner for the purpose of making the grant of the way effective. This right of use by the servient estate owner is, however, limited to those uses which do not interfere with the use of the way by the dominant estate holder nor injure the roadbed; that the dominant estate owner could by injunction prevent any unreasonable use of the way which should "sensibly impair its condition." A similar statement was made by this court inStevens v. Bird-Jex Co.,
"may himself use the way, or permit others to do so, subject to the limitation that his use or the use of his permittee must not be such as to impair the enjoyment of the easement by the owner of the dominant estate, or subject him to extra expense in keeping it in repair, and it is not necessary that he expressly reserve such right."
Applying these holdings to the instant case, it would appear that the stockyard corporation (servient estate holder) had the right to use the bridge or permit others to do so, subject to the limitation that the use should not materially obstruct the use by the plaintiff (dominant estate *239 holder) or subject the bridge to unreasonable use which "should sensibly impair its condition."
No case has been cited by counsel involving a suit for damages to a bridge caused by overloading. Research indicates that few such cases can be found. There are, however, a few such cases which are helpful.
In Thompson v. Matthews, 2 Edw. Ch., N.Y., 212, the defendants were hauling extra heavy loads of rock over the toll bridge of the plaintiff. Plaintiff sought to enjoin the use of the bridge for the hauling of such heavy loads. The Vice-Chancellor refused to enjoin. It was concluded that the bridge was a public one even though the plaintiff could collect tolls. The court then stated:
"But this is a case in which the parties have legal rights. The bridge is a public one. If persons take improper loads and the bridge has been properly constructed, then the owners of it have a remedy by a special action on the case or in trespass for damage done; while, on the other hand, if passengers and their property should sustain an injury by a breaking from ordinary loads, the owners must respond in damages. The law affords a reciprocal remedy in all such cases; and I shall leave the parties to their legal right."
Township of Livingston v. Parkhurst,
These last two cited cases stand for the proposition that even a public bridge must be used reasonably. One taking *240 unreasonably heavy loads upon the bridge is held liable for any damages occasioned from the overloading. The defendants in the instant case as permittees of the servient estate owner would be held at least to as high a duty as the user of a public bridge.
There is another line of cases holding that to take extraordinarily heavy loads over a public highway or bridge so as to damage them is a public nuisance. See Commonwealth v.Allen,
"Information against a common carrier, setting forth that no wagon ought to carry more than 2000 weight; and that the defendant used a wagon with four wheels, and cum inusitato numero equorum, in which he carried 3000 or 4000 weight at one time, by which he spoiled the highway leading from Oxford to London * * *. This was adjudged good * * * because it was the excessive weight which he carried that made the nuisance."
See also Sumner County v. Interurban Transp. Co.,
It appears fundamentally sound to restrict the use by the servient tenant or his permittees of a way prepared and maintained by the dominant tenant. Unrestricted use of the way by the servient tenant, without regard to the increased burden of upkeep and repair, could in effect destroy the grant of the way. In the absence of some provision in the grant which would indicate that the servient tenant was to have unrestricted use of the way with the right to so use as to increase the expense of upkeep and *241 repair no such right should be inferred. The use of the way by the servient tenant should be limited to those uses which will not unreasonably interfere with the use of the way by the dominant tenant. If the servient tenant or his permittees use the way so as to damage it (such as by overloading the bridge) he should respond in damages unless it appears that the damage was entirely without fault on his part.
The facts indicate that the parties contemplated that the plaintiff in this case would have to construct a bridge in order to make the way usable. There is, however, nothing to indicate that the bridge was to be designed to hold any and all loads which the servient tenant might bring upon his lands. The servient tenant had the right under the above cited cases to use the way and the bridge โ but the use was limited by the design and constructed capacity of the bridge. The use was to be the use to which the bridge was normally and ordinarily adapted. If the defendants, as permittees of the servient tenant, went beyond the scope of this use to which the bridge was adapted, they should be held liable for all resulting damage. The absolute limitation of the right of the defendants to use the bridge was to use it in accordance with the uses to which it was reasonably adapted. If they went beyond this, they are in effect trespassers. Thus, if the bridge had a designed capacity of ten tons, as Campion's testimony is reasonably susceptible of being construed, then the defendants were liable for taking 15 tons upon it. This should not be made to depend upon whether the bridge, in the eyes of an ordinary truckman, looked as though it would hold the 15 ton load. Defendants had no right to gamble with the plaintiff's property. They had no right or license to take excessive (in excess of its designed capacity) loads over the bridge. To do so was a trespass. If Campion's testimony can be construed as evidence that the bridge was designed to hold a maximum of 10 tons, the defendant Wade should be held liable, without regard to any possible error in judgment, for it is not disputed that he took a 15 ton load upon the bridge. *242
A witness, Campion, who rebuilt the bridge after its collapse, and who was experienced in building such structures testified on cross-examination that the bridge in his opinion would carry "six, eight, or ten ton loads, or something like that without any trouble." This testimony was brought out on cross-examination. Of course, no assignment is made as to its admissibility, since defendant elicited it. If the trial court was satisfied that in light of this testimony and of the facts and circumstances relative to the collapse of the structure, the defendant drove onto the bridge a load in excess of its designed capacity, its finding in that regard should not be by us disturbed. Furthermore, as stated at the outset, the evidence is not such as to compel a finding by the trial court that the giving away of the laminated deck was the cause of the collapse, and but for its condition the bridge would not have broken.
WOLFE, Justice, concurs in the views expressed by Mr. Justice McDONOUGH.
Dissenting Opinion
If a bridge breaks while a person lawfully entitled to use it is crossing with a load, is such user liable in damages? If so, is such liability predicated upon negligence of the user? What constitutes negligence in such a case? These are the questions involved in this appeal from the District Court of Weber County. These are the essential facts. Ogden Union Stockyards, a corporation, owned certain lands in Weber County upon which it operated livestock feeding and sales yards. By written lease it let the plaintiff Ogden Livestock Shows, Inc., a small tract of land upon which plaintiff constructed a building called the coliseum, as a place to conduct livestock shows, athletic events and exhibitions of a general public character. This lease covered the ground occupied by the building, and a right-of-way 14 feet in width immediately adjoining said building on the east, north and west sides, for the purpose of ingress and egress to and from said building; also including a right-of-way *243 approximately 203 feet long for ingress and egress over the lands east of the building from the building to West Twenty-fourth Street, all said rights-of-way being "subject to the joint use of both the company and the association." The Hooper Canal crossed the tract of land east of the coliseum, over which land the aforesaid right-of-way was granted. To enable it to use the granted right-of-way, plaintiff constructed over this canal a bridge 20 feet wide with a span of approximately 38 feet. It was a wooden structure, supported by five wooden beams, 18 inches high and 12 inches wide; across these was a laminated deck of 2 x 6 inch planks set upon edge and spiked together; over this were plank runways across the bridge, and the top of the whole bridge was covered with asphalt. In 1941, the Stockyards was making some improvements on its property. Defendant Wade was to deliver the cement for this job on the property. He arrived at the bridge in question with a truck load of cement. The truck weighed 6300 pounds and was loaded with 240 bags of cement weighing 94 pounds each, making a gross load weight of approximately fifteen tons. Before crossing the bridge, Wade stopped and talked to Murray, an employee at the Coliseum, about the bridge, got under it, examined it, concluded it would hold his load, and started across. Just as the front wheels of the truck got to the opposite bank, the bridge gave way under the rear wheels and sagged down to the ground. Plaintiff brought this action against Wade to recover the costs of building a new bridge. The court found for plaintiff and defendant appeals, presenting for resolution the questions posed at the beginning of this opinion.
It seems well settled by the authorities that if by the wrongful act of a third person, a bridge maintained by a public corporation is damaged, the corporation may maintain an action against such person for the expenses of repair. 4 R.C.L. tit. Bridges, p. 216; City of Marinette v. Goodrich Transit Co.,
"The common-law rule is to be here strictly applied, `whoever to the injury of another, neglects a duty which he ought to perform by law, becomes liable to compensate the injury or damage.' The test is this: in order to avoid doing a damage to the property of another, a person is bound in law to such care in the use of his own property, as a prudent man would employ, under similar circumstances, if he were himself the owner of the property exposed to damage." (Quoted in note in Ann. Cas. 1917B, 939.)
And the burden is upon one desiring to use a bridge to exercise ordinary care for his own safety, and to exercise ordinary care to avoid injuring the bridge.
The Ohio Court in Board of Com'rs of Hardin County v.Coffman,
"Were the circumstances such that a person of ordinary prudence, in the exercise of ordinary care in the situation of the deceased, would reasonably apprehend and anticipate that it would be dangerous to go upon the bridge in that way?"
The Pennsylvania court said:
"The question is, whether the apparent condition of the bridge on that date * * * was such as ought to have led a man of ordinary prudence to foresee that it could not be used safely by the exercise of reasonable care." Schneider v. Mill CreekBorough,
And the Michigan Court in Comstock v. Georgetown Tp.,
"When the question is, did a person use ordinary care in a particular case, the test is the amount of care ordinarily used, by men in general, in similar circumstances."
The Wisconsin court in Walker v. Village of Ontario,
What then constitutes ordinary care on the part of one lawfully using a bridge in determining the capacity of the bridge to carry his load? It is simply such care as an ordinarily careful and prudent person would use, and such care does not require that the mind of the user be free from doubt as to the capacity of the bridge. In McDermott v. Ida County,
"Instruction 9 offered asked the court to charge that, if it was a question in the mind of the decedent whether the bridge would carry the load he was attempting to take across it, it should find for the defendant. Obviously this is not the law." (Italics added.)
The Indiana court in City of Wabash v. Carver, Ind. Sup.,
"One who contemplates going upon a bridge with a vehicle of unusual construction, or with a load of extraordinary weight, must himself ascertain the probable sufficiency of the bridge, and take notice of the condition and apparent strength of the structure, of the purpose for which it was built, and of the kind of vehicles ordinarily used thereon; and if, without knowledge or prudent inquiry or investigation concerning its capacity, condition, or use, he subjects it to an extraordinary strain, he must take the risk of injury."
In Moore v. Hazelton Tp.,
The Minnesota court elaborated more fully upon the act of the user in examining the bridge by stating that when such examination was made, the user was charged with full knowledge of what the examination would disclose at the time when he drove upon it, that is, he was held to the knowledge of the results a reasonable examination would have shown. Anderson v. City ofSt. Cloud,
"If the defects mentioned were so obvious that, in the exercise of ordinary care, the plaintiff could have discovered them, then, of course, he was guilty of negligence in attempting to cross. * * * Ordinary care does not require him to make the test spoken of by the witness. He was only bound to make * * * such observations as common prudence would seem to dictate, in view of his knowledge and all the surrounding circumstances."Walker v. Village of Ontario,
The test referred to was a claim that he should have taken a bit and bored into the timbers to see if there were defects not visible from the outside. The Courts of New York have indicated that if an inspection is made and the conclusion reached that the bridge will carry the load, there is no negligence. And in Heib
v. Town of Big Flats,
Let us examine the instant case in the light of these pronouncements. Negligence, if any, is to be found in this case, must be inferred. No one doubts that in law negligence may be inferred, but there must be facts from which the inference may be deduced. This leads us to a consideration of what facts there are from which such inference may be deduced. We find none except the fact that the bridge caved in under the load, and this is not a case where res ipsa loquitur applies on the matter of negligence.Branch Storage Co. v. Bucks County,
It is argued that this was a private bridge, and Wade was a trespasser thereon. Of course the owner of a private bridge is under no obligation to keep the bridge in good and safe repair for use by the public at large, if he has given no invitation express or implied to use it. Carson Lime Co. v. Rutherford,
The argument is advanced that there were two other bridges Wade could have used. Had an examination of this bridge showed defects or raised doubt in Wade's mind as to the capacity of this bridge, the fact that there were other *251
available routes might enter into the question as to whether he was negligent in crossing this one. But since an examination was made, no defects appeared, and the conclusion of all was that the bridge would safely carry the load, the matter of alternate routes is immaterial. Board of Com'rs of La Porte County v.Ellsworth,
This action is one brought by the owner of the dominant estate for damages to the right of way, against one using the roadway by the approval and consent of the servient estate. This was an easement, or bridge and roadway, used by both the dominant and servient estate, according to the terms of the instrument of its creation. Where the easement is thus used, an equitable distribution of the burden of maintenance and repair must be made. Lamb v. Lamb,
Dissenting Opinion
I concur with Mr. Chief Justice LARSON. The basis of the plaintiff's action, in negligence, in substance is that the defendant Wade knew or by exercise of reasonable care should have known that the bridge, by its construction, was not strong enough to support or sustain a truck with such a load; that the bridge was neither constructed or designed to carry heavy loads; that Wade failed to ascertain from plaintiff or its agents whether said bridge would support such a load.
The plaintiff has failed to support these allegations with the required proof. It is apparent that Wade did not know that the bridge would not support his load. He took the precaution to carefully examine the bridge from underneath. An employee of the plaintiff company and another accompanying Wade studied the bridge and all apparently *252 were of the opinion that the bridge was built so as to carry such a load.
There were no apparent defects. The bridge was of exceptionally heavy construction. Its streamers were 12 inches by 18 inches by 38 feet. The top was constructed of 2 x 6 inch plank. If there is any evidence in the record that this bridge was not constructed to carry a heavy truck loaded with ten tons, it is very meager and as presented deserves little consideration.
Under all the circumstances, I think Wade did everything required of him. He cannot be held for failing to discover the hidden defects in the bridge. These defects, I believe the evidence shows, were the cause of the bridge breaking.
WADE, J., having disqualified himself, did not participate herein.