Opinion
In а commercial real estate transaction, Paraic O’Donoghue, Tony Manning, Enda G. Quigley, Sean Murphy, Daniel Walsh, and Christopher Flood (collectively defendants) each signed a separate personal continuing *250 guaranty in favor of a lender. The guaranty agreements (agreements) contained a provision authorizing dispute resolution through judicial reference. (Code Civ. Proc., § 638.) 1 In its action to enforce the agreements, Performing Arts, LLC (plaintiff), moved for appointment of a referee pursuant to the judicial reference provision (provision or reference provision) in the agreements; the trial court granted the motion and appointed a referee.
Defendants seek writ relief from the order granting plaintiff’s motion to compel judicial reference. They argue (1) the reference provision does not waive their right to a jury trial because they did not have “actual notice of, and did not engage in meaningful reflection before agreeing to, the purported waiver”; (2) the reference provision is unconscionable, and therefore unenforceable; (3) plaintiff waived its right to reference; and (4) the court abused its discretion by granting the reference motion because reference will result in a duplication of effort and will create a likelihood “of conflicting rulings on a common issue of law or fact.”
(Tarrant Bell Property, LLC
v.
Superior Court
(2011)
Drawing on cases analyzing contractual arbitration provisions authorized under section 1280 et seq., we conclude plaintiff did not waive its right to judicial reference. We reject defendants’ remaining arguments and accordingly deny the petition for writ of mandate/prohibition.
FACTUAL AND PROCEDURAL BACKGROUND
This litigation concerns the development of a multiunit condominium project at 973 Market Street in San Francisco (the property). Plaintiff is a limited liability company formed by Joseph Cassidy. Cassidy is plaintiff’s sole member; he is also the sole principal of Centrix Builders, a construction company. Defendants are members or principals of 973 Market Associates, LLC (Market Associates). All defendants except Christopher Flood live in Ireland.
In August 2007, Market Associates obtained a $20 million construction loan from United Commercial Bank (UCB) to develop the property. The loan was documented with a promissory note and secured by a deed of trust recorded against the property. UCB required each defendant to execute an 11-page agreement containing a personal continuing guaranty.
Each agreement contained the following clause: “5.11 Judicial Reference. It is the desire and intention of the parties to agree upon a mechanism and procedure under which any controversy, breach or dispute arising out of this *251 Guaranty will be resolved in a prompt and expeditious manner. Accordingly, any controversy, breach or dispute arising out of this Guaranty and all loan documents executed by Borrower, or relating to the interpretation of any term or provision of such documents, shall be heard by a single referee by consensual gеneral reference pursuant to the provision of the California Code of Civil Procedure, Sections 638 et. seq. The parties shall agree upon a single referee who shall then try all issues, whether of fact or law, and report a statement of decision which either party may file with the clerk or judge and have judgment entered thereon. If the parties are unable to agree upon a referee within ten (10) days of a written request to do so by any party, then any party may thereafter seek to have a referee appointed pursuant to the Code of Civil Procedure Sections 638 and 640. The parties agree that the referee shall have the power to decide all issues of fact and law and report a statement of decision hereon, and to issue all legal and equitable relief appropriate under the circumstances before him or her. The parties shall promptly and diligently cooperate with one another and the referee, and shall perform such acts as may be necessary to obtain prompt and expeditious resolution of the dispute or controversy in accordance with the terms hereof. The cost of such a judicial reference proceeding shall be borne equally by the parties to the dispute.”
Defendants initialed each page of their respective agreement and signed directly beneath section 5.11.
By April 2009, Market Associates defaulted on the loan. In June 2009, UCB assigned the promissory note to plaintiff, which later acquired the property in a trustee’s sale.
The Litigation
In 2009, plaintiff sued defendants for breach of the guaranty, seeking approximately $14 million, plus interest. 2 Plaintiff served Flood and Manning in 2009 and 2010; they appeared in 2010. In April and June 2010, plaintiff filed case management statements requesting a jury trial and estimating a five-day jury trial. 3 In 2011, Manning, Market Associates and others sued the real estate agent that represented Market Associates in the purchase and sale of the property (973 Market Associates, LLC v. Vanguard Properties, Inc. *252 (Super. Ct. S.F. City and County, 2013, No. CGC11508323). In July 2012, and over plaintiff’s objection, the court consolidated that case with the present action. The remaining defendants—Quigley, Murphy, O’Donoghue, and Walsh—filed answers at various times in 2012; Walsh appeared last and filed an answer in October 2012. In their answers, defendants asserted various affirmative defenses, including unclean hands, estoppel and the illegality and unenforceability of the agreements.
In 2012, defendants and Market Associates cross-complained against Cassidy, Centrix Builders, and others. The cross-complaints alleged claims for, among other things, fraud, breach of fiduciary duty, and interference with prospective economic advantage. As relevant here, defendants claimed Cassidy wrongfully gained confidential and proprietary information from them about the loan and the property and used it to purchase the note from UCB for a below-market rate.
Discovery
From September 2010 to August 2012, plaintiff served defendants with form and special interrogatories, requests for admission, and requests for production of dоcuments. Plaintiff’s requests for production to Manning sought 80 categories of documents, including documents related to the loan and the property. In response, defendants produced approximately 25,000 pages of documents. In 2012, O’Donoghue served plaintiff with special interrogatories, requests for admission, and requests for production of documents. Plaintiff’s responses to the requests for production were deficient; the court granted O’Donoghue’s motion to compel and ordered plaintiff to provide documents by January 2013. In late December 2012, plaintiff responded to O’Donoghue’s special interrogatories and requests for admission.
The Motion for Appointment of a Referee
In early December 2012, plaintiff moved for appointment of a referee pursuant to section 638. Plaintiff argued (1) the agreements were legally enforceable; (2) removing “this matter from the busy court calendar and alleviating the attendant fiscal costs to the Court” would promote the public interest; and (3) the cross-complaints and consolidated action had “no factual or legal relevance to [its] complaint.” Cassidy—plaintiff’s sole member— submitted a declaration in support of the motion attaching the agreements signed by defendants.
In a declaration submitted in support of the motion, plaintiff’s counsel claimed serving O’Donoghue, Quigley, Murphy, and Walsh was difficult because these defendants “were located in Ireland and . . . had to be served *253 by means of the Hague Convention” and because they evaded service. Counsel characterized plaintiff’s attempts to serve these defendants as “diligent” and noted the “difficulties ... in effectuating service in Ireland.” Counsel’s declaration attached a May 2010 affidavit of service from an Irish solicitor averring he tried to serve Quigley three times on unspecified dates “but failed to do so” because Quigley’s residence was surrounded by a gate and no one answered the door when he rang the doorbell.
Defendants raised four arguments in opposition to the reference motion. First, they argued they did not knowingly and voluntarily waive their constitutional right to a jury trial because the reference provision did not “implicate[ ] a waiver of one’s constitutional right to a jury trial.” Second, they urged the court to decline to enforce the reference provision under
Tarrant Bell, supra,
Third, defendants contended plaintiff waived its right to seek a judicial referee by delaying service of process on defendants “by nearly three years” and by waiting “over three years before seeking the аppointment of a judicial referee.” They also claimed the case would not be ready for trial any sooner with a judicial referee because plaintiff had “stalled in responding to discovery and steadfastly refused to produce documents for six months,” which necessitated an order compelling plaintiff to produce documents.
Finally, defendants argued the agreements were unenforceable adhesion contracts containing unconscionable reference provisions. They claimed the agreements were procedurally unconscionable because (1) they were presented in a “take-it-or-leave-it manner, accompanied by the threat that no loan would be issued . . . unless the guarantor signed the document as presented” and (2) they did not expect the agreements to operate to waive their jury trial rights. According to defendants, the reference provision was substantively unconscionable because it deprived them of their constitutiоnal right to a jury trial and because it contained “one-sided provisions” demanded by UCB that, “unbeknownst to [defendants], engaged in unsound banking practices that could jeopardize the security underlying the guaranties, misconduct sufficient to warrant criminal and quasi-criminal charges against UCB employees.”
*254 Each defendant offered a declaration averring (1) the agreements were presented in a “take-it-or-leave-it manner” without an opportunity for negotiation; (2) defendants did not receive any consideration “in exchange for UCB’s desire that the [agreements] contain the . . . Reference provision”; (3) defendants were not provided with any loan-related documents when they signed the agreements; (4) before they signed the agreements, no one explained what a “ ‘judicial referee’ entailed” or told them the reference provision would waive their rights to a jury trial; and (5) defendants did not agree to waive their right to a jury trial in any dispute arising from the agreement. Flood further averred he was not rеpresented by an attorney when he signed the agreement and that a UCB representative pressured him to sign it “or else no Construction Loan would be issued.” He further stated it would be “financially impossible for [him] to pay for a judicial referee.”
Defense counsel submitted a declaration describing the circumstances surrounding Cassidy’s purchase of the note for $3.5 million and attaching an appraisal valuing the property at $8.5 million. On information and belief, defense counsel asserted that when defendants defaulted on the loan, UCB refused to negotiate with them or with other prospective purchasers—some of whom were offering $5 million for the note—because UCB was secretly negotiating with Cassidy. Counsel’s declaration attached various documents pertaining to the FDIC’s seizure of UCB in November 2009 for, among other things, allowing “illegal ‘friendly short sales’ conducted by UCB in 2009.” The declaration suggested one of these short sales involved Cassidy. Finally, counsel averred plaintiff had “stalled in responding to discovery and steadfastly refused to produce documents. Plaintiff delayed producing documents in response to [a document request] served ... in July 2012, ultimately necessitating an Order Compelling Plaintiff to Produce Documents filed on December 18, 2012.”
In reply, plaintiff argued the judicial reference provisions were enforceable under California law and “clearly and unambiguously” informed defendants “that all controversies would be resolved by a single referee.” Plaintiff further claimed it did not waive its right to séek judicial reference because it diligently attempted to serve the Ireland defendants under the Hague convention (Convention on the Service Abroad of Judicial and Extrajudicial Documents in Civil or Commercial Matters, Nov. 15, 1965, 20 U.S.T. 361, T.I.A.S. No. 6638) and moved for judicial reference shortly after the final defendant was served. Finally, plaintiff contended the agreements and reference provisions were not unconscionable.
Following a hearing, the court granted plaintiff’s motion for an order appointing a referee. Shortly thеreafter, plaintiff’s counsel declined to meet and confer about plaintiff’s responses to O’Donoghue’s special interrogatories *255 and requests for admission, claiming defendants’ challenge was “if not moot, in abeyance pending appointment of a referee. Any dispute over discovery .. . must await appointment of a referee and a determination by the referee of the scope of permissible discovery.” Plaintiff’s counsel also advised defense counsel it would seek to “limit the scope of discovery to the narrow issues at hand, namely the defendants’ obligations under the [agreements] and [plaintiff’s] damages under the defaulted construction loan” after a referee was appointed.
The court denied defendants’ reconsideration motion and appointed a referee. This petition followed. We stayed the order granting the reference motion and issued an order to show cause why the relief requested in the petition should not be granted. 4
DISCUSSION
“Judicial reference involves sending a pending trial court action to a referee for hearing, determination and a report back to the court.”
(Trend Homes, Inc. v. Superior Court
(2005)
Section 638 “authorizes] courts to transfer a dispute to a referee” pursuant to a written agreement between the parties.
(Grafton Partners v. Superior Court
(2005)
I.
The Reference Provision Waives Defendants’ Right to a Jury Trial
Defendants contend the reference provision does not waive their right to a jury trial because they did not have “actual notice of, and did not engage in meaningful reflection before agreeing to, the purported waiver.” The crux of defendants’ claim is paragraph 5.11 cannot—and does not—waive their right to a jury trial because it does not contain the words “jury”, “jury trial”, or “waiver” and, as a result, they did not know they were waiving their rights to a jury trial when they executed the agreements.
Defendants urge us to establish a rule requiring predispute reference agreements to contain explicit language waiving the right to a jury trial. We decline to do so. Section 638 does not require the reference agreement to contain a jury waiver. As the court in
Woodside Homes of California, Inc. v. Superior Court
(2006)
Two courts have enforced reference provisions that did not mention the words “jury”, “waiver”, or “trial”. (See
Greenbriar Homes Communities, Inc. v. Superior Court
(2004)
The California Supreme Court has concluded an otherwise enforceable agreement to arbitrate nеed not contain an express waiver of the right to jury
*257
trial.
5
(Madden v. Kaiser Foundation Hospitals
(1976)
Our high court recently reaffirmed this principle and “decline[d] to reаd additional unwritten procedural requirements, such as actual notice and meaningful reflection, into the arbitration statute.”
(Pinnacle, supra,
An agreement to arbitrate must, however, “clearly and unambiguously show that the party has agreed to resolve disputes in a forum
other than
the judicial one, which is the only forum in which disputes are resolved by juries.”
(Badie, supra,
Treo, supra,
II.
The Reference Provision Is Not Unconscionable
Next, defendants argue the reference provision is unenforceable because it is procedurally and substantively unconscionable. “Unconscionability consists of both procedural and substantive elements. The procedural element addresses the circumstances of contract negotiation and formation, focusing on oppression or surprise due to unequal bargaining power. [Citations.] Substantive unconscionability pertains to the fairness of an agreement’s actual terms and to assessments of whether they are overly harsh or one-sided. [Citations.] A contract term is not substantively unconscionable when it merely gives one side a greater benefit; rather, the term must be ‘so one-sided as to “shock the conscience.” ’ [Citation.]”
(Pinnacle, supra,
“The party resisting arbitration bears the burden of proving unconscionability. [Citations.] Both procedural unconscionability and substantive unconscionability must be shown, but ‘they need not be present in the same degree’ and are evaluated on ‘ “a sliding scale.” ’ [Citation.] ‘[T]he more substantively oppressive the. contract term, the less evidence of procedural unconscionability is required to come to the conclusion that the term is unenforceable, and vice versa.’ [Citation.]”
(Pinnacle, supra,
The reference provision reflects a low degree—if any—of procedural unconscionability. As stated above, “procedural unconscionability requires oppression or surprise. ‘ “Oppression occurs where a contract involves lack of
*259
negotiation and meaningful choice, surprise where the allegedly unconscionable provision is hidden within a prolix printed form.” ’ [Citation.]”
(Pinnacle, supra,
“Even if we do assume an imbalance in bargaining power, and that [UCB], as the stronger party, presumably prepared the [agreements] with an eye to its own advantage, and even if we also assume that [UCB] would not have countenanced the striking of the . . . reference provisions, [defendants] have nevertheless only shown a low level of procedural unconscionability because, as we . . . [discuss below], the elements of surprise or . . . misrepresentation . . . [are] not present.”
(Woodside I, supra,
Defendants’ claim of surprise is unavailing in light of
Greenbriar,
where thе Third District Court of Appeal analyzed an identical reference provision and concluded there was “no element of surprise.”
(Greenbriar, supra,
Nor was UCB—as defendant's suggest—required to explain the reference provision to defendants. The reference provision clearly states “that in the
*260
event of a civil action involving a dispute arising out of the guaranty, the action will be heard by a judicial reference.” It cites the pertinent Code of Civil Procedure section governing judicial reference, notes that “only one referee will be appointed,” and explains what “occurs if the parties cannot agree on the referee.” Finally, the reference provision states the referee will have the power to decide all issues in the action, to report a statement of decision, and to issue all legal and equitable relief as appropriate.
(Trend Homes, supra,
Given the low degree of procedural unconscionability, defendants are required to show a high degree of substantive unconscionability to render the reference provision unenforceable.
(Serpa, supra,
With the exception of defendant Flood, none of the defendants made any attempt to establish “the probable additional expenses of a judicial reference, if any, would be impossible or unreasonably difficult for them to pay,” nor did they offer “any evidence that the decision to agree to judicial reference was not economically sound from their point of view.” (Woodside I, supra, 107 Cal.App.4th at pp. 733-734, fn. omitted.) While it may be true, defendants’ claim that they will “suffer undue expense and inconvenience associated with travel from ¿eland as the reference proceeding and the trial progress at different times” is unsupported by a citation to the record.
Like other courts before us, we reject defendants’ claim that the reference provision was substantively unconscionable because defendants did not receive “bargained for consideration in return” for the inclusion of paragraph
*261
5.11 in the agreements. Defendants
“did
get something in addition for their jury waiver—[plaintiff’s] matching waiver.”
(’Woodside I, supra,
The parties’ “waiver of their right to a jury trial does not render [the reference provision] substantively unconscionable.”
(Trend Homes, supra,
III.
Under the Circumstances of This Case, Defendants Have Not Established Plaintiff Waived Its Right to Judicial Reference
Defendants’ third claim is plaintiff “waived any right to a reference.” They have not cited, and our research has not disclosed, any case applying waiver in the context of judicial reference. In the absence of such authority, the parties urge us to apply cases regarding waiver of a contractual right to arbitration.
The Legislature has enacted a comprehensive statutory scheme
“authorizing
predispute arbitration agreements” in section 1280 et seq.
(Grafton, supra,
“ ‘Generally, the determination of waiver is a question of fact, and the trial court’s finding, if supported by sufficient evidence, is binding on the appellate court. [Citations.]’ ”
(Brown
v.
Superior Court
(2013)
“ ‘ “There is no single test for waiver of the right to compel arbitration
(Augusta
v.
Keehn & Associates
(2011)
Though some courts apply a more limited three-factor test, “ ‘the party who seeks to establish waiver must show that some prejudice has resulted from the other party’s delay in seeking arbitration.’ ”
(Berman, supra,
Defendants contend plaintiff delayed seeking judicial reference and exhibited litigation conduct inconsistent with an intent to proceed before a judicial referee.
(Augusta, supra,
Two other factors, however, favor plaintiff or do not apply. The “ ‘litigation machinery’ ” had not been “ ‘substantially invoked,’ ” nor were the parties “ ‘well into preparation of a lawsuit,’ ” before plaintiff notified defendants of its intent to seek reference.
(St. Agnes, supra,
According to defendants, plaintiff’s delay in seeking reference compels a finding of waiver. We disagree. We cannot conclude the delay was unreasonable under the circumstances present here, particularly given the difficulty plaintiff had in serving certain defendants in Ireland. The cases upon which defendants rely to support their argument that plaintiff unreasonably delayed seeking to compel reference are inapposite. In the cases cited by defendants, there were additional reasons for finding prejudice in addition to delay. (See, e.g.,
Sobremonte v. Superior Court
(1998)
Notwithstanding plaintiff’s use of discovery procedures and its delay in seeking judicial reference, we conclude plaintiff has not waived its right to reference because defendants have not established prejudice. Courts “ ‘will not find prejudice where the party opposing arbitration shows only that it incurred court costs and legal expenses.’ [Citation.] [Courts] assess prejudice in light of California’s strong public policy favoring arbitration. [Citation.] ‘Prejudice typically is found only where the petitioning party’s conduct has substantially undermined this important public policy or substantially impaired the other side’s ability to take advantage of the benefits and efficiencies of arbitration.’ [Citation.] Prejudice may be found where the
*265
petitioning party used the judicial process to gain information it could not have gained in arbitration, waited until the eve of trial to seek arbitration, or delayed so long that evidence was lost. [Citation.]”
(Brown, supra,
Here, plaintiff did not wait until the eve of trial to seek reference and there is no indication in the record plaintiff delayed so long that evidence was lost. Defendants claim they were prejudiced because plaintiff obtained extensive discovery, refused to provide meaningful responses to their discovery, and then expressed an intent to limit the scope of discovery before the referee. The test for prejudice is whether plaintiff used court discovery processes to gain information about defendants’ case which plaintiff could not have gained in judicial reference.
(Berman, supra,
On the record before us, we cannot conclude the evidence compels a finding of prejudice and, as a result, we must affirm the trial court’s ruling regarding waiver.
{Lewis, supra,
m.
Granting the Reference Motion Was Not an Abuse of Discretion Under Tarrant Bell
Defendants’ final argument is the court abused its discretion by granting the reference motion because ordering reference would cause duplicative parallel proceedings, create a risk of inconsistent rulings, and would not promote judicial economy. Defendants rely on
Tarrant Bell,
where the California Supreme Court held “a trial court has discretion to refuse to enforce a predispute agreement providing that, in the event of dispute, a referee may hear and decide certain contested issues”
(Tarrant Bell, supra,
In their reply, defendants argue the court operated under the misapprehension it lacked discretion to deny the reference motion. Defendants point to the court’s comments at the hearing, claiming they demonstrate the court “erroneously believed it had no discretion to deny a reference and, therefore, disregarded the factors highlighted in
Tarrant Bell.”
9
Under well-established rules of appellate review, we need not consider arguments raised for the first time in a reply brief.
(Estate of Bonzi
(2013)
Assuming this argument is properly before us, we reject it on the merits. At the hearing on the motion, defense counsel argued: “this is another point that actually was not addressed in the tentative ruling that we’ve put in our opposition papers, [¶] The consequences of . . . granting a motion for judicial referee is going to cut this case in half. So the personal guarantee claims are going to be heard by a judicial referee, and the cross-complaints for indemnity and affirmative relief are going to be heard in the regular court system. This is addressed ... in Tarrant Bell saying [it’s] improper; you should not have two separate parallel proceedings.” Counsel then listed a specific example illustrating how “[absolutely dispositive factual issues are going to come up in” both the reference action and the court action. The court interrupted counsel and directed plaintiff’s counsel to respond to defendants’ *267 argument that the language of the reference provision was insufficient to waive defendants’ right to a jury trial.
Later, defense counsel returned to her argument regarding Tarrant Bell, again noting the tentative ruling “doesn’t address this” and the following colloquy occurred:
“[DEFENSE COUNSEL]: The consеquences of a dual track action. Now we’re going to have—
“THE COURT: We have that all the time.
“[DEFENSE COUNSEL]: Can I work through this for a minute?
“THE COURT: I know exactly what you mean. Sure. It settles—that’s often very helpful. This is going to settle, what, multi-million dollars issues?
“[PLAINTIFF’S COUNSEL]: The balance of the claims are indemnity claims, Your Honor.
“[DEFENSE COUNSEL]: That’s not true.
“THE COURT: I don’t find that a drawback.
“[DEFENSE COUNSEL]: So we have this . . . finding of facts as to whether the transfer from UCB to Joe Cassidy was an invalid transfer under the judicial referee. If it comes back and says, yes, that was valid, do they get to use that as collateral estoppel in our other case where we’ve not been deprived of the right to a jury trial as to that issue where we clearly have a right to a jury trial? Let me—
“THE COURT: Let’s cross that bridge.
“[DEFENSE COUNSEL]: Let me give you an example.
“THE COURT: Why am I going to speculate about these things?
“[DEFENSE COUNSEL]: It’s because that’s why the . . . the California Supreme Court in Tarrant Bell refused to have dual tracks. They took a similar situation and said, no, we’re not going to take some claims and send them off here—
“THE COURT: I don’t see it as a detriment here. If anything, I see the other side of it that it might be a good idea.
*268 “[DEFENSE COUNSEL]: I guess that’s contrary to what the Tarrant Bell court thought when faced with the same identical circumstances. [¶]... Your Honor, if you don’t want the hypothetical—
“THE COURT: I really feel this is a statutory issue. I really do. I think you’ve got a good idea, but that agreement is so solid. It is. As Daniel Webster would say, copper bottomed. Rock ribbed and copper bottomed. That’s the way I see it.”
On the one hand, there may be a plausible argument the court was mistaken in its belief that whether to grant plaintiff’s motion was solely a “statutory issue.” Under
Tarrant Bell,
it is clear a trial court has discretion to refuse to enforce a predispute agreement for the reasons discussed above.
(Tarrant Bell, supra,
51 Cal.4th at pp. 542, 545.) Following defendants’ argument to its logical conclusion, the court’s purported mistaken belief about the scope of its discretion and its “ ‘failure to exercise discretion [was] itself an abuse of discretion.’ ”
(Doan
v.
State Farm General Ins. Co.
(2011)
On the other hand, one could interpret the court’s comments as a rejection of defendants’ arguments regarding Tarrant Bell. Defense counsel repeatedly argued having dual tracks was a basis to deny the motion under Tarrant Bell. In response, the court stated, “I don’t see it as a detriment here. If anything, I see the other side of it that might be a good idea.” When defense counsel began to discuss the “consequences of a dual track action,” the court responded, “[w]e have that all the time” and said, “I know exactly what you mean. Sure. It settles—that’s often very helpful.” The court then stated the presence of indemnity claims in the court litigation was not “a drawback.” These comments suggest the court considered—and rejected—defense counsel’s Tarrant Bell arguments. On this record, we cannot conclude the court failed to exercise.its discretion.
There may have been sound reasons to deny the reference motion. Requiring defendants to defend plaintiff’s complaint before the referee but litigate their cross-complaints in court could force the parties “ ‘to conduct the same discovery, litigate[,] and ultimately try the same issues in separate but parallel forums’ ”
(Tarrant Bell, supra,
DISPOSITION
The petition for writ of mandate/prohibition is denied. The previously issued stay shall dissolve upon issuance of the remittitur. (Cаl. Rules of Court, rules 8.490(c), 8.272.) Plaintiff shall recover its costs. (Cal. Rules of Court, rule 8.493(a)(1)(A).)
Simons, J., and Bruiniers, J., concurred.
A petition for a rehearing was denied September 27, 2013, and the opinion was modified to read as printed above. Petitioners’ petition for review by the Supreme Court was denied November 26, 2013, S213853.
Notes
Unless otherwise noted, all further statutory references are to the Code of Civil Procedure.
Plaintiff also sued Michael Muirary. He is not a party to this writ proceeding.
Nearly two years later, in a January 2012 case management statement, plaintiff indicated it would “[S]eek an appointment of a referee under . . . Section 640, should defendants not agree to one under . . . Section 638. In the [agreements] signed by the defendants, they expressly agree to trial by a referee, and thus are not entitled to a jury trial.” Plaintiff claims it included this same language in other 2012 case management statements, but these case management statements are not part of the record.
We grant defendants’ unopposed motions to augment the record and/or take judicial notice of various documents in the superior court file. (Evid. Code, § 452, subd. (d); Cal. Rules of Court, rules 8.155(a)(1)(A), 8.486(b)(1)(C).) We decline to take judicial notice of the transcript of an April 3, 2013 hearing because it is not “relevant to a material issue”
(People ex rel. Lockyer
v.
Shamrock Foods Co.
(2000)
As we explain post, cases interpreting arbitration agreements are instructive here.
This is not a situation like the one in
Pardee Construction Co.
v.
Superior Court
(2002)
Nothing prevented plaintiff from advising the court in 2010 or 2011—when two defendants had been served—that it intended to move for reference once all defendants had been served and appеared. Instead of informing the court about the reference provision in the agreements, plaintiff demanded a jury trial in 2010 and waited until 2012—after it had propounded *264 extensive discovery and after defendants cross-complained—to advise the court of its intention to seek the appointment of a referee.
In
Tarrant Bell,
120 current and former lessees and residents of a mobilehome park sued defendant park owners for, among other things, subjecting park residents to substandard living conditions.
(Tarrant Bell, supra,
As the trial court explained, “ ‘[o]rdering two groups of [plaintiffs] to try their cases in separate but parallel proceedings would not reduce the burdens on this court or the parties, result in any cost savings, streamline the proceedings, or achieve efficiencies of any kind. The parties would be required to conduct the same discovery, litigate[,] and ultimately try the same issues in separate but parallel forums. A general reference would thus result in a duplication of effort, increased costs, and potentially, delays in resolution. Moreover, it would not reduce any burden on this Court, which would almost certainly have to hear, and decide, all of the same issues.’ ”
(Tarrant Bell, supra,
A statement of decision or oral statement of the court’s analysis would have been helpful here, where the two-sentence tentative ruling addressed only unconscionability and not the remaining arguments raised in opposition to the motion. Critically, as we discuss post, such a statement of decision or oral explanation of the court’s analysis would have clarified that the court understood the scope of its discretion.