51 Iowa 129 | Iowa | 1879
If the pump had been of the capacity it was warranted to be, the parties expected, and the evidence tended to show, the well could have been completed in five days, but it in fact took eighteen days to do so, owing, as was claimed, to the defective pump.
The defendants claim that plaintiffs warranted that with the use of the pump the well could be completed in five days. But we fail to discover there was any evidence so tending. The contract was made in Chicago, and the well was situate in this State. The plaintiffs had no knowledge of the character of the ground or of the obstacles likely to be encountered, nor had they any right to say what force should be employed in digging. It is not reasonable, therefore, to infer that they -obligated themselves to finish the well in any given time. Nothing short of positive evidence that they had so contracted would
The defendants contracted to pay a certain sum per day for the use of the pump, and for the services of a man to operate it, and in addition thereto were to pay the freight to Iowa City and back to Chicago, and were to be responsible for all damages sustained to the pump. The uncontradicted evidence is that the pump was cracked during its transit from Chicago, whereby its capacity was greatly diminished, and defendants were so informed on its arrival, and before operations were commenced. The person sent from Chicago by the plaintiffs to operate the pump made efforts, or at least said he would do so, to repair the injury, so that the well could be finished. Otherwise than this the plaintiffs had no knowledge the pump had been injured.
No objections were made by the defendants to the course taken, but they acquiesced therein; nor did they make any efforts to procure another pump or protect themselves from injury. They had paid nothing on the contract at the time the injury to the pump -was discovered.
The court instructed the jury that if they found for the defendants on the counter-claim the measure of the “recovery will be the difference in value to the defendants per day between what the pump would have been worth if it had been as represented or warranted, if you find there was a warranty, and what the pump was really worth per day in the condition in -which it was; but you will not allow defendants any sum for rental value of the alcohol works during the time they were using the pump. ”
The appellants insist this instruction is erroneous because they were not allowed to recover the rental value of the distillery. In this view we do not concur, because it was the duty of the defendants, in so far as they could, to have protected themselves from los3 or damage. Davis v. Fish, 1 G. Greene, 406; Mather v. Butler County, 28 Iowa, 253. So far
These facts are exceptional. The cases are numerous where defects in machinery have been discovered after it has been in operation for a time. In such cases damages such as that claimed in this case may be recoverable. But our attention has not been called to any adjudicated ease in which such damages have been allowed where the machinery was known to be defective before operations were commenced therewith, and on principle we think such damages cannot be recovered.
While it is true such damages as arise naturallyfrom a breach of a contract, or such as may have been contemplated by the parties, are recoverable (Mihills Mfg. Co. v. Day, 50 Iowa, 250), yet we think such rule does not apply in the present ease. It may be conceded that, under the contract as originally made in Chicago, if there had been no change in the circumstances, and there had been a breach of the warranty, the rental value of the distillery would have constituted the measure of the defendants’ damage; but under the circumstances, and the acts and conduct of the parties, we do not think either of them could have contemplated that the plaintiffs would be liable to such damages if, owing to the injury to the pump, delay was caused.
The instruction.was fully as favorable to the defendants as they were entitled to. From what has been said it will be readily seen there was no error prejudicial to the defendants in the fourth instruction, limiting the recovery of damages to five days. The instruction is. based on the theory that plaintiffs warranted the well could be completed in that time.
Affirmed.