131 Minn. 19 | Minn. | 1915
This is an action in equity to determine and apportion the liability of the defendant insurance companies upon policies of tornado insurance issued by them to the plaintiff. The basis of equity jurisdiction in such cases is stated in Fegelson v. Niagara Fire Ins. Co. 94 Minn. 486, 103 N. W. 495. There were findings for the plaintiff determining that some of the defendants, were liable and that some were not and fixing the amount of liability of the companies found liable. Certain defendants appeal from the order denying their motion for a new trial. Other defendants are respondents.
There were 25 defendants and 40 policies. Two forms were used. The description of the property in form 1 was as follows:
“On all steel superstructures consisting of towers, bridges, trolleys and transfer cars, including all machinery, fixtures, equipment and attachments thereto and constituting a part thereof, all situate and contained on their premises at the foot of Hill Avenue at Superior, Wisconsin, and known as Northwestern Fuel Company’s Dock Number 1. Permission to make necessary alterations and repairs, and for other concurrent insurance.”
The description in form 2 was the same except as to alterations, etc., which was as follows:
“Permission to make necessary alterations and repairs and for additional construction. This policy to cover same, and for other insurance.”
The form 1 policies, numbering 15, were issued at various dates from August 11, 1911, to September 22, 1913, most of them, however, in the latter part of 1912. The form 2 policies were executed at various dates from June 10, 1913, to April 6, 1914, but largely in October, 1913.
The plaintiff’s dock covered some 40 acres and was located on the water front at Superior, Wisconsin. It was a single dock, but for purposes of convenience was referred to as of three sections. Sections 1 and 2 had been constructed a number of years. On section 1 there were four
No question is made but that the form 2 policies covered bridge 5. Nearly all of them were subsequent in date to the completion of the construction and all of them covered additional construction. Four policies of form 1, one dated May 26, 1913, two dated July 11, 1913, and one dated September 22,1913, aggregating $12,500, were issued after the false work was up and while the bridge was in course of construction. The trial court held that these four policies aggregating $12,500 should contribute in paying the loss and that the other policies of form 1 aggregating $62,500 should not contribute.
The defendants issuing form 2 policies claim that all of the form 1 policies should contribute; and that if they do not there is a violation of the coinsurance clause of the policies. The companies issuing the four form 1 policies, held liable to contribute, claim that they should not contribute. If the form 1 policies all contribute there is no question of coinsurance involved; otherwise there is.
“The building was in process of construction when the insurance was effected, and the contract of insurance should be deemed applicable, not only to the incomplete structure, but to the building when completed.”
It appeared there that the agent of the insurance company actually knew that the construction was in progress. It does not so appear here. It does appear, however, that certain soliciting agents placed practically all of the insurance, both that issued before and that issued after these four policies, and, inferentially at least, that they issued the builders’ insurance taken at the time of the commencement of the construction. That construction was in progress when the insurance was written was a matter of notoriety. Insurance companies survey property which they insure. They should not be heard to say, when a loss came a year after-wards, that the insurance had no reference to the superstructure in process of construction.
The court was right in holding that the other form 1 policies, three of which were issued in March and April, 1913, most of them in the latter part of 1912, and one as early as 1911, did not cover bridge 5. The superstructure was then in contemplation and for a portion of the time under contract, but there was nothing in the way of a structure in process of erection. The court adopted a reasonable construction when it held that these earlier policies did not cover the later erection.
“It being optional with the assured, and the assured having elected to accept a coinsurance clause in this policy in consideration of a reduced rate of premium, the assured hereby agrees to maintain insurance, during ■ the life of this policy, upon the property hereby insured, to the extent of fifty per cent (50%) of the actual cash value thereof, and that if at the time of the loss the whole amount of insurance on said property shall be less than such fifty per cent (50%) this company shall, in case of loss or damage less than such fifty per cent (50%), be liable for only such portion thereof as the amount insured by this policy shall bear to the said fifty per cent (50%) of such cash value of such property.
“When this clause is attached to and made part of a policy covering two or more items, this clause shall be construed as applying separately to each item of the policy.”
The sound value of the superstructures, sections 1, 2 and 3, was approximately $405,000. Section 3 or bridge 5 was of the value of $228,000. The value of sections 1 and 2 was approximately $177,000. The total insurance was $215,000, form 1 policies carrying $75,000 and form 2 carrying $140,000. By the holding of .the court that certain policies of form 1 should not contribute, insurance to the amount of $62,500 did not cover section 3, but did cover sections 1 and 2. Insurance to the amount of $152,500, being $140,000 plus $12,500, covered all three sections. Insurance greater in amount than 50 per cent of actual value covered the superstructure as a whole as well as its parts. No quibbling with figures, however, conceals the fact that the companies contributing to the payment of the $125,000 damage lose appreciably because the $62,500 is not applicable thereto. If the $215,000 of insurance contributed, each policy would pay substantially 12/21 of its face. With $152,500 contributing, each policy pays substantially 12/15 of its face. If the coinsurance had been of an amount to make the total contributing insurance 50 per cent of the actual value, each policy would
In view of the rule of construction favorable to the insured, the uncertainty of the precise application of the language of the coinsurance clause, and the disfavor with which the law regards provisions for coinsurance, the trial court properly held that the condition as to coinsurance was satisfied.
The insurance contracts under consideration are Wisconsin contracts and the law of Wisconsin is the governing law. They are not to be construed as Minnesota policies would be. Myers v. Chicago, St. P. M. & 0. Ry. Co. 69 Minn. 476, 72 N. W. 694, 65 Am. St. 579. It may be conceded that the coinsurance clause would be invalid in Minnesota. G. S. 1913, §3322. The governing law of the policies, that is, the Wisconsin law, is not pleaded nor proved, and we determine the question presented without reference to the local law of Wisconsin or the statute of Minnesota. We make this plain so that confusion will not arise in a subsequent construction of policies governed by the Minnesota statute.
'“It is understood and agreed that the amount insured by this policy shall attach in each of the above named premises in that proportion of the amount hereby insured that the value of property covered by this policy contained in each of said places shall bear to the value of such property contained in all of above named premises.”
This clause has no application to the present situation. It can apply only when different portions of the insured property have different locations. If the policies had covered the superstructures on the company’s docks across the harbor at Duluth along with those on its Superior docks there might then be an argument for its application. There is none now.
Order affirmed.