Northwest Environmental Defense Center v. U.S. Army Corps of EngineersNorthwest Environmental Defense Center v. U.S. Army Corps of Engineers
Case Information
*2
HERNÁNDEZ, District Judge:
Currently before the Court are Plaintiffs Northwest Environmental Defense Center, WildEarth Guardians, and Native Fish Society, and Defendants the United States Army Corps of Engineers (“the Corps”) and National Marine Fisheries Service (“NMFS”)’s cross motions for summary judgment. For the following reasons, the Court GRANTS Plaintiffs’ Motion for Summary Judgment [ECF 96] and DENIES Defendants’ Motion for Summary Judgment [ECF 101].
BACKGROUND
Plaintiffs initiated this action on March 13, 2018, bringing claims against Defendants for violations of the Endangered Species Act (“ESA”) and the Administrative Procedure Act (“APA”), principally on the basis that Defendants failed to reinitiate consultation under the ESA after the Corps did not timely implement various mitigation measures set out in a 2008 NMFS biological opinion (“BiOp”). The 2008 BiOp assessed the effect that the Corps’ operation and maintenance of the Willamette River Basin Flood Control Project (“WVP”) has on Upper Willamette River Chinook salmon (“UWR Chinook”) and steelhead (“UWR steelhead”).
The WVP is a large network of 13 dams and related facilities on various tributaries in the Willamette River basin. The WVP was constructed beginning in the 1940s to provide flood control, municipal and agricultural water supply, recreation, and hydroelectric power to the Willamette Valley. The dams relevant to this case are in the Middle Fork Willamette River, McKenzie River, South Santiam River, and North Santiam River subbasins. Dexter, Lookout Point, Hills Creek, and Fall Creek dams are in the Middle Fork Willamette River subbasin; Cougar and Blue River dams are in the McKenzie River subbasin; Green Peter and Foster dams are in the South Santiam River subbasin; and Detroit and Big Cliff dams are in the North Santiam River subbasin.
Both UWR Chinook and steelhead are anadromous salmonids, meaning they are born in freshwater—typically in upstream tributaries—before migrating through river systems out to saltwater where they mature into adults before ultimately returning to their freshwater habitat to spawn and to complete their life cycle. The UWR Chinook and steelhead were listed as “threatened” under the ESA in 1999.
As a result of the listing of UWR Chinook and steelhead, the Corps, the Bonneville Power Administration, and the United States Bureau of Reclamation began consultation with NMFS in 2000 to determine whether the continued operation of the WVP was likely to jeopardize the continued existence of the listed salmonids and/or adversely modify the salmonids’ critical habitat. [1] Due to numerous delays, NMFS did not complete the consultation process and issue its BiOp until 2008. NMFS concluded in the 2008 BiOp that the continued operation of the WVP as proposed by the Corps was likely to jeopardize the continued existence of the UWR Chinook and steelhead and would likely destroy and/or adversely modify the species’ critical habitat. The 2008 BiOp found the dams harmed the listed salmonids by, among other things, blocking downstream passage of juvenile salmonids, interfering with upstream migration of salmonids returning to their spawning grounds, and harming water quality and quantity downstream from the dams.
The reason the dams adversely affect salmonid migration is straightforward: Significant portions of the UWR Chinook and steelhead spawning habitat are located above the WVP dams and salmonids cannot swim past dams, at least without operational and structural measures to facilitate such passage. Approximately 70% of historic UWR Chinook and 33% of UWR steelhead spawning, incubation, and rearing habitat in the North Santiam River and South Santiam River subbasins is blocked by dams. Third Decl. of Kirk Schroeder (“Schroeder Decl.”) ¶¶ 24, 26, ECF 97. Approximately 16% of historic UWR Chinook habitat in the McKenzie River *5 subbasin is blocked by dams. BiOp 4.3-10. [2] Over 90% of the historic habitat for UWR Chinook has been blocked by dams in the Middle Fork Willamette River subbasin. Schroeder Decl. ¶ 29; BiOp 4.2-36.
The dams also adversely affect water quality, quantity, and temperature below the dams, and change the nature of the waterways above the dams in a variety of ways that can affect the ability of juvenile salmon to develop and survive downstream migration and the ability of adult salmonids to migrate upstream and spawn. For example, spill from the dams can cause high levels of dissolved gas in the downstream water, which can adversely affect both juvenile downstream-migrating salmonids and upstream-migrating adult salmonids. See , e.g. , BiOp 4.1- 11. Moreover, because water downstream from the dams is drawn from above-dam reservoirs, downstream water temperatures can be unnaturally warm during critical periods of the year. See , e.g. , BiOp 4.1-9. The reservoirs can also affect juvenile salmonids (the progeny of adult fish trapped, hauled, and replanted above the dams) because the unnaturally slow water movement in the reservoirs can expose the juvenile fish to greater levels of predation, parasites, disease, and poor water quality than they would be exposed to under natural conditions. See, e.g., Schroeder Decl. ¶ 20.
As part of the 2008 BiOp, NMFS issued a Reasonable and Prudent Alternative (“RPA”), in which it set out measures that the Corps and other stakeholders needed to carry out in order to allow for the continued operation of the WVP without causing jeopardy to the listed species or adverse modification of their critical habitat. As discussed in more detail below, the actions set out in the RPA included structural modifications and operational changes at the dams and other *6 WVP facilities designed to mitigate many of the above adverse effects on the UWR salmonids. The BiOp also set out various deadlines by which the Corps needed to carry out the RPA measures. Together with the 2008 BiOp, NMFS also issued an Incidental Take Statement (“ITS”) that authorized the incidental take of listed species pursuant to the terms and conditions set out in the ITS. The BiOp and ITS were intended to last through 2023.
Although the nature and extent of the delays are matters of dispute between the parties, it is undisputed that significant RPA measures were never carried out, some were delayed, some have not yet occurred, and some will not occur in time to meet future deadlines. Meanwhile, UWR Chinook and steelhead populations continue to decline, although both species remain listed as “threatened” after a 2016 NMFS status review.
Shortly after Plaintiffs filed this action, the Corps and NMFS reinitiated formal ESA consultation in April 2018. Defendants currently estimate they will complete the BiOp from the reinitiated consultation by the end of 2022.
On June 25, 2018, the City of Salem filed a Motion to Intervene [ECF 7] as a Defendant on the basis that this case is likely to have an impact on the City’s water supply. The Court granted that Motion on July 30, 2018. Order, ECF 15. Similarly, on September 6, 2018, Marion County filed a Motion to Intervene [ECF 18] on the basis that this case is likely to have an impact on the County’s economic interests. The Court granted that Motion on September 25, 2018. Order, ECF 26. The interests of the City of Salem and Marion County focus on the effect this litigation may have on operational and structural changes at Detroit Dam.
On November 30, 2018, Plaintiffs filed a Motion for Preliminary Injunction [ECF 36], in which they sought an order directing the Corps to implement various operational measures intended to address downstream fish passage and water quality issues. The Court denied *7 Plaintiffs’ motion on June 5, 2019 because Plaintiffs failed to demonstrate they would suffer irreparable harm during the pendency of these proceedings absent preliminary relief. See Op. & Order, ECF 84.
On September 25, 2019, Plaintiffs filed their Motion for Summary Judgment [ECF 96]. Intervenor-Defendants filed a Response in opposition to Plaintiffs’ motion on October 16, 2019 [ECF 100]. On November 6, 2019, Defendants filed their Motion for Summary Judgment [ECF 101]. As stipulated by the parties [ECF 83], this case has been bifurcated into a liability phase and a remedy phase. The instant motions address only the issue of Defendants’ liability. [3]
In Claim One, Plaintiffs allege the Corps is violating the ESA’s substantive and
procedural requirements. First, Plaintiffs claim the Corps is violating Section 7(a)(2) of the ESA
(
STANDARDS
Summary judgment is appropriate if there is no genuine dispute as to any material fact
and the moving party is entitled to judgment as a matter of law.
Citizen-suit claims brought pursuant to the ESA are analyzed under the APA’s standard
of review, which requires a court to “compel agency action unlawfully withheld or unreasonably
delayed,”
The arbitrary and capricious standard is “searching and careful, but the ultimate standard
of review is a narrow one.”
Marsh v. Oregon Nat. Res. Council
,
DISCUSSION
I. ESA Section 7(a)(2)
Plaintiffs argue the Corps is violating ESA Section 7(a)(2) because its ongoing operation and maintenance of the WVP is jeopardizing the continued existence of UWR Chinook and steelhead and destroying and/or adversely modifying the species’ critical habitat.
A. Relevant Law
Under ESA Section 7(a)(2), a federal “action agency,” such as the Corps, is required to
ensure that any action it authorizes, funds, or carries out “is not likely to jeopardize the continued
existence of any endangered species or threatened species or result in the destruction or adverse
*10
modification” of the species’ designated critical habitat.
B. Analysis
Plaintiffs’ theory of liability is relatively straightforward: Because the 2008 BiOp concluded that the Corps’ operation of the WVP would jeopardize the continued existence of the UWR Chinook and steelhead, and because the RPA represented the steps that the Corps needed to take to avoid such jeopardy, the Corps’ operation of the WVP without timely implementing the most critical RPA measures is jeopardizing the listed salmonids.
Plaintiffs first note that the BiOp identified lack of downstream passage and poor water quality as two of the largest impediments to ensuring the survival and recovery of the salmonids. NMFS detailed that “lack of passage is one of the single most significant adverse effects on both the fish and their habitat,” and “[w]ater quality problems are one of the major limiting factors in [downstream] habitat[.]” BiOp 9-33, 9-52, 9-61. NMFS determined that the Corps’ proposed operation of the WVP did not sufficiently address these problems and would cause jeopardy and adverse habitat modification. BiOp 8-4 to -5.
Although the Corps “included studies to consider passage at Project dams,” it “did not include specific passage measures and time frames associated with the measures.” BiOp 9-33. NMFS found that “specific passage measures are necessary to address the effects” of the WVP and avoid jeopardy. BiOp 9-33. In addition, the Corps’ proposed actions relating to water quality did “not require any interim temperature control measures nor d[id] it provide certainty that any *11 permanent facilities would be constructed[.]” BiOp 9-60. NMFS found the Corps’ operational plan would cause “unacceptable water temperature and [total dissolved gases] TDG downstream of the Project dams where listed fish are forced to spawn.” BiOp 9-60. As such, the record demonstrates that NMFS’ jeopardy and adverse critical habitat modification findings were largely based on the Corps’ failure to propose actions that would adequately improve the lack of downstream fish passage and poor water quality caused by the Corps’ maintenance and operation of the WVP.
Because NMFS concluded that the Corps’ operation of the WVP would violate the ESA, NMFS set forth “approximately 96 RPA measures” necessary to avoid jeopardy and adverse habitat modification. Defs.’ Mot. Summ. J. (“Defs.’ Mot.”) 10, ECF 101 (citing BiOp 9-7 to -90). The BiOp provided strict deadlines for completing many of the RPA measures “[i]n order to assure timely progress toward implementing critical on-the-ground actions.” BiOp 9-6. Relevant here, to improve downstream juvenile migration, the RPA directed the Corps to:
(1) Conduct operational measures for downstream juvenile fish passage through all Project reservoirs and dams in the four key subbasins, with implementation to begin by May 2011;
(2) Complete the Willamette Configuration Operation Plan by September 2012 to evaluate additional actions for fish passage;
(3) Construct a fish passage facility at Cougar Dam by December 2014 with operations to begin by 2015;
(4) Construct a fish passage facility at Lookout Point Dam by December 2021 with operations to begin by March 2022; and
(5) Construct a fish passage facility at Detroit Dam by December 2023 with operations to begin by March 2024.
BiOp 9-42, 9-48 to -58.
To address water quality issues, the RPA directed the Corps to: *12 (1) Conduct and study interim operations to improve water temperature and TDG at Detroit and Big Cliff dams beginning in 2009;
(2) If feasible, conduct interim operations to improve water temperatures and TDG levels at Project dams in the South Santiam and Middle Fork subbasins beginning April 2010;
(3) Evaluate and, if feasible, implement complex measures for temperature and TDG control at dams in the North Santiam, South Santiam, and Middle Fork subbasins beginning May 2011;
(4) Construct a water temperature control facility by December 2018, with highest priority being Detroit Dam; and
(5) Develop and apply protocols to protect water quality during emergency and unusual events.
BiOp 9-61 to -67.
Further, NMFS’ no jeopardy and no adverse critical habitat modification findings presumed the Corps would fully and timely implement the RPA measures. Indeed, the BiOp states, “NMFS is providing the [Corps] with the following [RPA] to avoid jeopardizing the continued existence of UWR Chinook salmon and UWR steelhead, and avoid destroying or adversely modifying their critical habitat.” BiOp 9-5. The BiOp required the Corps to “complete each Project measure no later than the final date listed for each measure.” BiOp 9-57; see also BiOp 9-61 (“[B]ecause some of the UWR Chinook salmon populations are presently at such low abundance levels and at high risk of extinction, interim [water quality] measures are needed as soon as possible to avoid further declines in abundance.”); BiOp 9-90 (“NMFS’ RPA provides a package of measures that will allow for the survival with an adequate potential for recovery for these two species.”). The BiOp is unequivocal; the Corps needed to implement the entire RPA— especially the measures addressing downstream passage and water quality issues—to avoid jeopardizing the listed salmonids and adversely modifying their critical habitat.
The Corps, however, has failed to carry out several of the most important RPA measures listed above. Defendants concede “[t]here is no disagreement that the Corps has not completed the RPA measures relating to downstream passage within the time period specified in the RPA.” Defs.’ Mot. 1; see also Defs.’ Reply 6, ECF 104 (“[T]he Corps has not completed all of the RPA measures relating to downstream passage and water quality.”). The most significant example of the Corps’ departure from the RPA is its failure to timely construct what NMFS dubbed the “Big 4,” i.e. , downstream passage facilities at Cougar, Detroit/Big Cliff, and Lookout Point/Dexter dams, and a water temperature control structure at Detroit Dam. USACE 841136, 006584.
As mentioned, the RPA provided a 2014 deadline for construction of a downstream passage facility at Cougar Dam; however, the Corps is now only in the design phase and estimates the project will not be completed until 2022. BiOp 9-53; Defs.’ Notice, Ex. 2 (“Defs.’ Timeline”), at 10, ECF 81-2. Despite a 2023 deadline, the Corps estimates construction of the downstream passage facility at Detroit Dam will not be completed until 2028. BiOp 9-55; Defs.’ Timeline 11. The Corps has essentially abandoned designing a downstream passage facility at Lookout Point Dam and will therefore not meet the RPA’s 2021 deadline for that project. BiOp 9-54; USACE 335767 (noting the Corps will not even begin designing the Lookout Point passage structure until after the BiOp expires in 2023). The Corps will therefore not achieve the BiOp’s requirement that all three downstream passage facilities be completed by 2023, much less NMFS’ expectation that the Corps would have made significant progress on designing a fourth downstream passage facility by then. BiOp 9-49, 9-52. The RPA also provided a 2018 deadline for constructing a water temperature control structure at Detroit Dam, but the Corps estimates that it will not complete that project until 2024. BiOp 9-65; Defs.’ Timeline 12. As the Court previously concluded, “Plaintiffs have established the Corps has not timely implemented many *14 of the RPA measures most vital for improving fish-passage and water-quality conditions.” Op. & Order 22; see also Defs.’ Timeline 8-10; Pls.’ Notice 1-5, ECF 82-1.
The Corps asserts that the issue “does not depend on whether the full RPA has been
implemented, but on whether the Corps has a reasonable basis for concluding [its] actions
comply with Section 7(a)(2).” Defs.’ Mot. 13. The Corps argues that it need not implement every
aspect of the RPA to comply with the ESA because in
Bennett v. Spear
, the Supreme Court
stated that the “action agency is technically free to disregard the Biological Opinion and proceed
with its proposed action.”
Bennett
,
The Corps’ reliance on
Tribal Vill. of Akutan v. Hodel
, for the proposition that an
agency’s “departure from the suggestions in the biological opinion does not by itself constitute a
violation of [the] ESA” is misplaced.
Although the RPA is technically non-binding, the Corps has not identified any “alternative, reasonably adequate steps” it has taken to comply with the requirements of Section 7(a)(2). Id. at 1193. The actions identified by the Corps are merely other RPA measures, some of *15 which the Corps has only partially implemented. See Defs.’ Timeline 8, 11-12. For example, NMFS anticipated the “Big 4” could not be completed until later into the BiOp’s 15-year term, and therefore included RPA measures directing the Corps to study and carry out interim operational changes to address downstream passage and water quality issues. BiOp 9-42 to -44, 9-61 to -64. The Corps contends that shortly after the BiOp was issued, it “began to investigate and test numerous operational changes” at several WVP dams. Defs.’ Mot. 19. The Corps also notes that it replaced and extended operations of the Foster Dam fish weir, constructed a portable floating fish collector at Cougar Reservoir, implemented nighttime use of the regulating outlets at Cougar Dam, performed surface spill operations at Detroit Dam, and conducts an annual drawdown of Fall Creek Reservoir. Id. Notably, however, the Foster fish weir is no longer in use due to high fish mortality, and the experimental fish collector at Cougar Reservoir proved unsuccessful. Schroeder Decl., Ex. A, ECF 97-1; USACE 832528; NMFS 6543.
The Corps also notes that it built three new adult fish collection facilities and enhanced adult fish release sites upstream of five dams. Def. Timeline 7. [5] The Corps argues those improvements “also have the effect of improving downstream passage.” Defs.’ Reply 7. The Corps’ position is meritless; the RPA’s upstream passage measures, while important, only benefit discrete aspects of the salmonids’ lifecycle—adult migration and spawning. Regardless of how many adult fish the Corps traps below the dams, hauls by truck, and replants above the dams, their offspring cannot further propagate the species if most of the juvenile salmonids are unable to successfully navigate downstream of the dams to continue their lifecycle in the marine *16 environment. The geographic and temporal complexity of the salmonids’ various life stages supports Plaintiffs’ assertion, and NMFS’ opinion, that the RPA needed to be fully implemented to avoid jeopardy.
The Corps next contends that it had to conduct in-depth studies before it could proceed with the RPA’s long-term water quality and downstream passage measures. Yet, the delays in completing those studies are attributable to the Corps. The RPA provided a 2012 deadline for the Corps to finish its assessment of options for long term fish passage, but it did not complete the Willamette Configuration Operation Plan (“COP”) until 2015. BiOp 9-58; USACE 834521. In a November 2014 memorandum, NMFS’ biologists stated, “The RPA deadline for the COP report was Jan[uary] 2012, which was not met because the BPA and Corps created a COP process far more complicated than NMFS expected or agreed was necessary.” NMFS 3827. Similarly, the Corps was six years behind schedule in completing the initial Willamette Fish Operations Plan (“WFOP”), which was intended to identify optimal operating criteria to minimize fish injury and mortality, including operational measures for passage and water quality. BiOp 9-36; Defs.’ Timeline 6.
Additionally, even assuming the Corps consistently carried out interim operational
measures in all the relevant subbasins, which it concedes it has not, those measures were only
intended as stopgaps until the “Big 4” became operational. BiOp 9-42, 9-61. As discussed,
NMFS’ no jeopardy and no adverse habitat modification findings were “based on the benefits
attributed to successful completion” of the RPA, especially the “Big 4.” BiOp 9-5; NMFS 3774
(“Recovery in Willamette cannot be achieved without downstream fish passage in all 4 basins.
This is essential to avoiding jeopardy[.]”). Simply put, the Corps did not take “alternative,
reasonably adequate steps” to ensure against jeopardizing the listed salmonids by only partially
*17
implementing the RPA’s temporary measures, and its departure from the RPA was not “well
reasoned [nor] supported by the record.”
Tribal Vill. of Akutan
,
Instead, the Corps failure to construct the “Big 4” is similar to previous case involving
the Corps,
Sierra Club v. Marsh
,
Nonetheless, the Corps contends that despite its noncompliance with the RPA, it is not
violating Section 7(a)(2) because the UWR salmonids’ ESA listing status of “threatened” has not
*18
been elevated to “endangered” since the issuance of the 2008 BiOp. NMFS 6562, 6604. This
contention reveals a fundamental misunderstanding of the ESA on the Corps’ part; “[t]he
purpose of the ESA is to ensure the recovery of endangered and threatened species, not merely
the survival of their existing numbers.”
Alaska Oil & Gas Ass’n v. Jewell
,
Far short of moving towards recovery, the Corps is pushing the UWR Chinook and steelhead even closer to the brink of extinction. The record demonstrates that the listed salmonids are in a more precarious condition today than they were at the time NMFS issued the 2008 BiOp. USACE 049439 (“The ESA-protected fish are on the decline; the [NMFS] science center is thinking about upgrading their status from ‘Threatened’ to ‘Endangered.’”); USACE 213868-69, 213896; USACE 765136. As NMFS found in its 2019 BiOp on the Corps’ plan to reallocate water stored in the WVP reservoirs, “[t]he status of both species has declined since 2008,” and “[b]oth species remain at high risk as they continue to experience the adverse effects caused by operation of the WV[P] without full implementation of the RPA.” Pls.’ Ex. 59, at 95, ECF 103-1.
Despite NMFS’ concern that the salmonids’ status might need to be changed from
threatened to endangered, the Corps maintains that it is not violating Section 7(a)(2) because
“NMFS did not object to its continuing operation and maintenance of the WVP pursuant to the
new RPA implementation schedule during the reinitiation period.” Defs.’ Reply 9. NMFS
*19
Regional Administrator, Barry Thom, notes that delays “are typical for a project of this
magnitude,” and working towards completing the belated RPA measures during the reinitiated
consultation process would be the “prudent course of action.” Thom Decl. ¶¶ 4-5, ECF 68. If,
however, multi-year delays in carrying out critical RPA measures are as typical as Thom
describes, the BiOp should have anticipated those setbacks and accounted for their impacts on
the listed salmonids. Instead, the RPA explicitly required the Corps to “complete each Project
measure no later than the final date listed for each measure.” BiOp 9-57. Basically, Defendants
are “attempting to say that the [RPA] deadlines are not essential when it has already been
established [in the BiOp] that they are.”
Sw. Ctr. for Biological Diversity v. Babbitt
(“
Biological
Diversity II
”), No. CIV. 97-0474 PHX-DAE,
The Court recognizes that the “Big 4” may still represent a path for the Corps to avoid jeopardizing the salmonids and does not necessarily disagree with Thom’s opinion that continuing to implement the belated RPA measures during the reinitiated consultation process might be “prudent.” However, Thom’s belief as to the sensible way for the agencies to move forward does not, as the Corps asserts, equate to a determination by NMFS that the Corps is not causing jeopardy by continuing to operate the WVP without the critical RPA measures in place. As Defendants note, NMFS would first have to complete a new consultation process and issue a new biological opinion before it could even make such a determination. Defs.’ Reply 9. Instead, the Court finds more persuasive the 2008 BiOp’s conclusion, and the NMFS-biologists’ contemporaneous opinions, that the RPA measures needed to be timely implemented to ensure against jeopardizing the listed salmonids. See , e.g. , NMFS 3417 (NMFS’ February 2013 draft letter: “The analyses in the BiOps are based upon implementation of all components of NMFS *20 [RPA]”); NMFS 3774 (June 2014 comments on the Corps’ strategy: “Recovery in Willamette cannot be achieved without downstream fish passage in all 4 basins. This is essential to avoiding jeopardy . . . . [and] has been reached through multiple analyses,” including “NMFS’ Willamette [Biological] Opinion 2008 [and] NMFS’ Recovery Plan 2011”); USACE 841136 (March 2015 draft recommendation letter to the Corps: “[E]very one of the Big 4 are necessary to avoid jeopardizing the continued existence of ESA-listed species in the Upper Willamette River . . . . and should be constructed before the RPA expires in 2023”); NMFS 3904 (May 2015: “[I]mplementation of the RPA is critical to improve [the species’] status, especially the reintroduction, passage, and temperature control elements”); see also Auer v. Robbins , 519 U.S. 452, 462 (1997) (noting a court should not give deference to a “ post hoc rationalization advanced by an agency seeking to defend past agency action against attack”) (citation omitted).
Finally, Plaintiffs have shown the Corps’ operation of the WVP without completing the
RPA measures is causing the species’ decline. The Corps argues that lack of downstream
passage is a consequence of the physical presence of the dams, not its discretionary operations.
The Corps further contends that Congress approved and funded the construction of the WVP
dams even though it knew at the time that the dams would block upstream and downstream
passage and “would be too high to permit the passage of migrant fish by means of facilities of
demonstrated efficacy.” Defs.’ Mot. 18 (quoting H.R. Doc. No. 81-531, App. J, at 1732 (1950)).
Similarly, the Corps insists—and Plaintiffs readily agree—that UWR Chinook and steelhead are
negatively impacted by factors other than the WVP, including sea lion predation, warming ocean
conditions, climate change, and habitat degradation.
See
BiOp 3-17; Piaskowski Decl. ¶ 13, ECF
70; Second Johnson Decl. ¶ 6, ECF 99. However, “even where baseline conditions already
jeopardize a species, an agency may not take action that deepens the jeopardy by causing
*21
additional harm.”
NWF
,
In sum, the 2008 BiOp included RPA measures specifying the actions the Corps needed to take to ensure its operation and maintenance of the WVP did not jeopardize UWR Chinook and steelhead or adversely modify the salmonids’ critical habitat. Although the Corps has completed a significant number of the RPA measures, it has failed to timely implement several RPA measures critical to improving two of the primary impediments to the salmonids’ continued existence and recovery—lack of safe downstream fish passage and poor water quality. Nor has the Corps taken any alternative, reasonably adequate steps to address the issues the RPA measures were intended to improve. Further, the status of the species has continued to decline since the BiOp was issued in 2008, and Plaintiffs have shown that the Corps’ failure to implement the RPA measures is a cause of that decline. Accordingly, the Corps is violating ESA Section 7(a)(2).
II. ESA Section 9
Plaintiffs contend the Corps is violating Section 9 of the ESA because its operation and maintenance of the WVP is causing unlawful “take” of UWR Chinook salmon and UWR steelhead.
A. Relevant Law
Section 9 of the ESA prohibits the “take” of species listed under the ESA.
If, after consultation, the expert agency, such as NMFS, concludes that an agency
action—as proposed or with RPA measures—is not likely to jeopardize the continued existence
of a listed species or result in the destruction or adverse modification of critical habitat, but
determines that the action will nevertheless result in the “take” of listed species, the expert
agency must issue an Incidental Take Statement (“ITS”).
Significantly, the ITS functions as a safe harbor provision from Section 9 liability and
penalties for takings committed during activities that are otherwise lawful and in compliance
with the ITS’s terms and conditions.
B. Analysis
Before turning to the merits of Plaintiffs’ Section 9 claim, the Court must address Defendants’ argument that Plaintiffs have waived the issue. Plaintiffs initially claimed that the Corps’ failure to implement the RPA measures, in and of itself, violates Section 9 because the RPA is a term and condition of the ITS: “These terms and conditions constitute no more than minor changes because they only provide further elaboration on the more general measures in the [Proposed Action] and RPA.” BiOp 11-40. As the Corps correctly notes, however, the language cited by Plaintiffs is included in the prefatory section of the ITS and does not incorporate the entire RPA as the ITS’s terms and conditions or reasonable and prudent measures. Rather, where NMFS intended to adopt a specific RPA measure as a requirement of the ITS, it did so expressly. See BiOp at 11-57 (action agencies “must complete all monitoring and reporting requirements in the RPA”); BiOp at 11-40 (listing reasonable and prudent measures, none of which require the Corps to implement the RPA entirely). Perhaps recognizing that the ITS did not incorporate the RPA wholesale, Plaintiffs have altered course and expressly argue for the first time on summary judgment that the Corps is exceeding the take limits in the ITS. Specifically, Plaintiffs contend that the Corps is exceeding the ITS’s mortality limits relating to downstream juvenile passage.
The Corps argues Plaintiffs waived their “takings” claim because Plaintiffs failed to
allege that the Corps exceeded the take limits in their notice of intent to sue letter. The ESA
precludes the commencement of citizen suits “prior to sixty days after written notice of the
violation has been given to the Secretary, and to any alleged violator of any such provision or
*24
regulation.”
Here, Plaintiffs alleged in their November 2017 notice letter that they intended to sue the
Corps because its continued operation of the WVP without the RPA’s passage measures, among
other things, was violating ESA Section 9 by “causing unlawful ‘take’ of the[] species,” “illegal
take of individual fish,” and was “killing, harming, and harassing the fish and degrading their
habitat[.]” Defs.’ Reply, Ex. A, at 1, 16, ECF 104-1. Although Plaintiffs did not specifically
allege that the Corps is exceeding the ITS’s take limits relating to downstream passage, “a notice
need not provide the exact details of the legal arguments that the plaintiffs intend to eventually
make.”
Conservation Cong. v. Finley
,
*25
In a similar vein, the Corps contends that the claim is waived because Plaintiffs did not
allege the same “take” theory in their Complaint. The Corps argues that the Court may not reach
arguments raised for the first time in a summary judgment response. For a claim to be properly
pleaded in a complaint, “[t]he necessary factual averments are required with respect to each
material element of the underlying legal theory[.]”
Wasco Prod., Inc. v. Southwall Techs., Inc.
,
Here, the Complaint alleges “the Corps is violating ESA Section 9” by “causing or
contributing to take of [UWR] Chinook salmon and steelhead that is not authorized by NMFS,”
because “the operation of the [WVP] continues to kill, harm, and harass the fish.” Compl. 28,
ECF 1. Plaintiffs allege that the Corps’ operation of the WVP included its “failure to implement
many [RPA] measures, particularly key measures to improve fish passage[.]”
Id.
at 27-28. This
was sufficient to put the Corps on notice of Plaintiffs’ Section 9 claim.
Cf. Navajo Nation v. U.S.
Forest Serv.
,
Although the Court acknowledges that Plaintiffs have somewhat shifted gears, the Corps’
claimed lack of notice is without merit. As mentioned, Plaintiffs originally argued that the RPA
was part of the ITS’s terms and conditions, and therefore the Corps was violating the ITS—and
that the CWA implementing regulation might be thought to require more specific notice than
would be required under the [ESA], standing alone, [a court is] not bound to adopt that more
demanding requirement.”
Klamath-Siskiyou Wildlands Ctr. v. MacWhorter
,
As to the merits, to prove a violation of Section 9 of the ESA, Plaintiffs must
demonstrate by a preponderance of the evidence that the Corps’ operation of the WVP “causes
‘take’ beyond that allowed in the ITS.”
Native Fish Soc’y v. Nat’l Marine Fisheries Serv.
, No.
3:12-CV-00431-HA,
The ITS specifies the following mortality limits with regard to downstream passage for juvenile UWR Chinook: (1) up to 65% at Detroit and Big Cliff dams in the North Santiam subbasin; (2) up to 10% at Foster Dam in the South Santiam subbasin; (3) up to 32% at Cougar Dam in the McKenzie subbasin; and (4) up to 68.3% at Fall Creek Dam and 21% at Lookout Point and Dexter dams in the Middle Fork Willamette subbasin. BiOp 11-11 to -13. The ITS also permits up to 10% downstream passage mortality for juvenile UWR steelhead passing Foster Dam in the South Santiam subbasin. BiOp 11-14. NMFS expected, “ at most , the (quantifiable) amounts of incidental take of UWR Chinook and steelhead due to project passage[.]” BiOp 11-6 (emphasis added). In fact, NMFS anticipated that “incidental take in the form[] of . . . juvenile passage mortality” would decline “[a]s the RPA and Proposed Action are implemented.” BiOp 11-6.
In support of their argument that the Corps exceeded the ITS’s take limits, Plaintiffs cite to a 2016 PowerPoint presentation prepared by the Corps estimating juvenile passage mortality at the dams was between 71% and 89%. USACE 006584. The Corps offers no evidence to rebut Plaintiffs’ argument. Instead, the Corps asserts that the presentation does not specify which “dams” the data refers to. Defs.’ Reply 18 n.4. The Corps’ footnoted argument, however, ignores the context of its own presentation, which is titled “Willamette Valley Project . . . Biological Opinion(s) Implementation IPR-Discussion.” USACE 006579. The purpose of the presentation was to “[p]rovide an update on the work accomplished . . . and outline the regional analysis for *28 executing the remaining work (in the BiOps)[.]” USACE 006580. The slide containing the passage mortality estimate notes that the “‘Big 4’ measures are the most important and necessary to avoid jeopardy due to harm caused by blocked passage,” and specifically refers to the percentage of habitat blocked by “the dams” in the McKenzie, North Santiam, South Santiam, and Middle Fork Willamette subbasins. USACE 006584. The remaining slides generally discuss the Corps accomplishments in carrying out some of the RPA measures, its need to implement the “Big 4,” various options for the downstream passage facilities, and funding for the projects. USACE 006585-94. Clearly, the “dams” referenced in the presentation are the WVP dams corresponding with the “Big 4” projects—Detroit, Cougar, and Lookout Point. USACE 006588.
The Corps next argues that no source data is provided for the juvenile passage mortality estimates in the presentation. Yet the slide indicates that the source of the data is “NOAA,” which stands for the National Oceanic and Atmospheric Administration, NMFS’ parent agency. USACE 006584. Moreover, the Corps’ COP Phase II report provides identical data concerning juvenile passage mortality. Relevant here, downstream passage mortality under baseline operations was modeled at 71% for juvenile Chinook salmon passing Detroit and Big Cliff dams; 35% for juvenile Chinook salmon and 51% for juvenile steelhead passing Foster Dam; 89% for juvenile Chinook salmon passing Cougar Dam; and 80% for juvenile Chinook salmon passing Lookout Point Dam. USACE 835807 (North Santiam), 835830-32 (South Santiam), 835856 (McKenzie), 835873 (Middle Fork Willamette); see also USACE 841136-40 (NMFS’ recommendation for implementation of the “Big 4” discussing substantially similar downstream passage mortality data).
As the record demonstrates, the Corps is violating the ITS’s take limits for each of the relevant subbasins within the WVP. First, in the North Santiam subbasin, only UWR Chinook *29 are trapped and hauled above the Big Cliff/Detroit complex, meaning juvenile UWR steelhead do not pass downstream through the North Santiam dams. Piaskowski Decl. ¶ 26. At 71% mortality, the Corps is exceeding the ITS’s 65% mortality limit for juvenile Chinook salmon outmigrating past the Big Cliff/Detroit complex. USACE 835807; BiOp 11-11. Second, in the South Santiam subbasin, both species are replanted above Foster Dam, but not Green Peter Dam. Piaskowski Decl. ¶¶ 22, 84. At 35% mortality for juvenile Chinook salmon and 51% mortality for juvenile steelhead, the Corps is surpassing the ITS’s 10% limit for Foster Dam. USACE 835830-32; BiOp 11-11. Third, in the McKenzie subbasin, at 89% downstream passage mortality for juvenile UWR Chinook, the Corps is eclipsing the ITS’s 32% limit for Cougar Dam. USACE 835856; BiOp 11-12. Finally, in the Middle Fork Willamette, at 80% downstream passage mortality for UWR Chinook, the Corps is greatly exceeding the ITS’s 21% limit for Lookout Point Dam. USACE 835873; BiOp 11-12. The Corps is therefore violating the ITS’s take limits in each subbasin.
As to causation, Plaintiffs have shown that the Corps’ discretionary actions are causing
the unlawful “take” of UWR Chinook and steelhead. In a familiar argument, the Corps contends
that it cannot be held liable for “takes” caused by “the mere existence of dams that Congress
authorized decades ago knowing that they would block passage.” Defs.’ Mot. 22. NMFS,
however, has already addressed this issue in a Final Rule and commentary.
Our Children’s Earth
v. Leland Stanford Junior Univ.
, No. 13-CV-00402-EDL,
Here, the Corps does much more than merely hold title, it operates and maintains the
WVP dams.
See Our Children’s Earth
,
As mentioned, shortly after Plaintiffs brought this action, Defendants reinitiated formal ESA consultation over the Corps’ operation and maintenance of the WVP in April 2018. NMFS 7139, USACE 021143. Defendants argue Plaintiffs’ failure-to-reinitiate claim is now moot because they have reinitiated consultation. Plaintiffs counter that the claim presents a live controversy because the Court can still grant effective relief.
Article III of the United States Constitution requires that there be a live “case” or
“controversy.” A federal court must decide mootness before it can assume jurisdiction.
North
Carolina v. Rice
,
The cases cited by Defendants illustrate that a failure-to-reinitiate claim is moot where
the only requested relief is for an agency to reinitiate consultation and it already has done so.
See
,
e.g.
,
All. for the Wild Rockies v. U.S. Dep’t of Agric.
,
Plaintiffs, however, assert there are other types of effective relief the Court could grant.
Plaintiffs contend, and the Court agrees, that this case is similar to
Hoopa Valley Tribe v.
National Marine Fisheries Service
.
Here, Plaintiffs have similarly requested injunctive relief in the form of operational
changes to the WVP during the pendency of the reinitiated consultation process. Injunctive relief
is appropriate “where the violation complained of may have caused continuing harm and where
the court can still act to remedy such harm by limiting its future adverse effects[.]”
Nw. Envtl.
Def. Ctr. v. Gordon
,
As discussed, the Corps’ operation of the WVP without timely implementing critical
RPA measures is jeopardizing and unlawfully taking UWR Chinook and steelhead. Defendants
could have identified means to mitigate those harms by reinitiating formal consultation sooner.
Plaintiffs’ failure-to-reinitiate claim is not moot because an injunction could remedy the present
and future adverse effects caused by the agencies’ delay in reinitiating consultation. Furthermore,
a declaratory judgment would also put NMFS on notice that it must reinitiate consultation sooner
*33
when an action agency substantially deviates from the RPA or exceeds the ITS’s take limits.
Nw.
Envtl. Def. Ctr.
,
Nonetheless, like the federal defendants in
Hoopa Valley Tribe
, Defendants contend that
“the only appropriate remedy for a failure to reinitiate claim is an order directing the agencies to
reinitiate formal consultation, not an injunction,” because “any injunctive relief must be narrowly
tailored to the alleged violation.”
Relevant here, reinitiation of ESA consultation “is required and shall be requested” if: (1)
“the amount or extent of take specified in the incidental take statement is exceeded”; or (2) “the
identified action is subsequently modified in a manner that causes an effect to the listed species
or critical habitat that was not considered in the biological opinion or written concurrence.”
As Plaintiffs note, it became apparent that the Corps was not going to meet the RPA deadlines several years before the agencies reinitiated consultation in April 2018. The RPA directed the Corps to complete the WFOP by 2008, begin carrying out interim operational measures in 2010 and 2011, finish the COP by 2012, complete the Dexter adult fish facility and the Cougar downstream passage facility by 2014, construct the Detroit temperature control structure by 2018, and build the Lookout Point downstream passage structure by 2021. BiOp 9- 36, 9-40, 9-42, 9-53 to -55, 9-58, 9-62, 9-65. Yet by 2013, the Corps had not completed the WFOP or the COP, had not implemented interim operational measures at most of the dams, and did not plan to begin constructing the Dexter adult collection facility or Cougar juvenile passage facility until 2014. Defs.’ Timeline 6-12. NMFS began expressing its concerns about the Corps missing critical RPA deadlines in early 2013, but it did not request to reinitiate consultation. *35 NMFS 3408-09; NMFS 3417-18. In a May 2013 letter, the Assistant Regional Administrator of NMFS’ Hydropower Division stated: “The purpose of this letter is to inform [the Corps], pursuant to NMFS regulations at 50 CFR 402.16, that we believe it is now necessary to reinitiate consultation and prepare a revised Opinion.” NMFS 3795-96. Unfortunately, that letter was never transmitted to the Corps.
Further, it became clear in 2014 and 2015 that the Detroit temperature tower would be significantly delayed, and the Corps was no longer planning to construct the Lookout Point downstream passage facility or the Dexter adult collection facility. NMFS 3768; NMFS 3852-53. In June 2014, a NMFS’ biologist noted that the Corps was “missing firm deadlines in the RPA,” and that it was “highly unlikely that [the Corps will] get [the RPA measures] all finished by 2023.” NMFS 3723. But instead of formally reinitiating consultation, NMFS began strategizing ways to use the threat of requesting consultation as a way of incentivizing the Corps to “make a commitment to do fish passage asap at Cougar or Detroit.” NMFS 3713; see also NMFS 3714 (“The reason to consider [reinitiating consultation] would be if we are aware of [a] potential litigator, and we want to distance ourselves from the [Corps’] implementation of the RPA”). And in October 2014, NMFS noted that the agencies were “at a pivotal point in RPA implementation,” but the “Corps’ Portland District managers continue[d] to postpone dates for sharing their draft proposals” on how to implement the RPA. NMFS 3808. Despite clear indications in 2013, 2014, and 2015 that the Corps was not going to meet the deadlines for the “Big 4” and other critical RPA measures—triggering Defendants’ duty to reinitiate formal ESA consultation—the agencies did not do so until April 2018, and only after Plaintiffs brought suit.
Finally, as discussed, Defendants failed to reinitiate consultation despite exceeding the
ITS’s downstream passage mortality limits for several years. “It is not a de minimis violation for
*36
[D]efendants to fail to reinitiate formal consultation for[] years after the requirement to reinitiate
was triggered where that trigger [undermines] the BiOp’s no-jeopardy determination.”
Hoopa
Valley Tribe
,
CONCLUSION
For the reasons discussed, the Court GRANTS Plaintiffs’ Motion for Summary Judgment [ECF 96] and DENIES Defendants’ Motion for Summary Judgment [ECF 101]. The parties shall submit a joint briefing schedule within fourteen days of this Opinion & Order.
IT IS SO ORDERED.
DATED:______________________________. August 15, 2020
_________________________ MARCO A. HERNÁNDEZ United States District Judge
Notes
[1] Of the three action agencies involved in the ESA consultation process only the Corps operates the dams that are subject to this litigation. The Bonneville Power Administration markets the hydroelectric power generated by the WVP and the Bureau of Reclamation sells some of the storage water for irrigation. Accordingly, the latter two agencies are not directly involved in this case.
[2] The 2008 BiOp begins at NMFS 0001. See Notice of Lodging of the Admin. Record, ECF 88. Due to large number of citations to this document, and for ease of reference, the Court refers to the BiOp’s original page numbers rather than the Bates numbers.
[3] Intervenor-Defendants’ Response opposes Plaintiffs’ requested remedies relating to the Detroit Dam and reservoir. Accordingly, their arguments are premature, and will instead be considered during the remedy phase of this case. Further, Intervenor-Defendants motion for summary judgment as to their crossclaims against the Corps was due no later than September 25, 2019. See Order, ECF 85. However, they did not file a motion for summary judgment, and instead withdrew their crossclaims in an Amended Answer [ECF 93] filed on September 12, 2019.
[4] Given the exhaustive briefing by the parties, the Court finds the parties’ motions for summary judgment suitable for decision without oral argument pursuant to L.R. 7-1(d)(1). See Order, ECF 111.
[5] RPA measure 4.6 called for upgrades to a total of four adult fish collection facilities. Defs.’ Timeline 7; BiOp 9-40. Despite a 2014 construction deadline, the Corps only has “plans and specifications prepared” for the Dexter facility. Defs.’ Timeline 7. Further, the Corps was two years behind schedule in completing the upgrades to the Fall Creek adult fish collection facility. Id.
[6] The Corps argues that it just recently determined that it does not have the authority to carry out operational changes that forego hydropower production for an extended period of time. Nevertheless, it is undisputed that the Corps has the authority to construct the “Big 4” and will not meet the BiOp’s deadlines for any of those projects. Therefore, the Corps’ purported lack of authority to implement certain interim measures does not explain its failure to implement the “Big 4.” Moreover, given that Plaintiffs are likely to request the type of relief they did in their request for a preliminary injunction, the issue of the Corps’ authority to carry out interim operational measures is a question that should be resolved at the remedy phase of this case.
[7] The Corps’ reliance on two Clean Water Act (“CWA”) cases,
ONRC Action v. Columbia
Plywood, Inc.
,
[8] Plaintiffs argue the Corps bears the burden of proving that it stayed within the ITS’s take limits.
The case on which Plaintiffs rely,
United States v. Charette
, is inapposite.