Case Information
*2 Before MELLOY, McMILLIAN, and COLLOTON, Circuit Judges.
___________
COLLOTON, Circuit Judge.
Appellants Diane Munns, Mark Lambert, and Elliott Smith, members of the Iowa Utilities Board (collectively "the Board members"), appeal the district court's [1] grant of summary judgment and entry of a permanent injunction in favor of appellees Northern Natural Gas Company and Northern Border Pipeline Company in this case involving natural gas pipeline regulation. We affirm.
I.
This appeal concerns the efforts of the Statе of Iowa to regulate the
environmental effects of the construction and maintenance of interstate natural gas
pipelines, as well as its attempt to delineate private damage remedies for certain
harms caused by natural gas companies. This is our court's second consideration of
Iowa laws regulating the construction of natural gas pipelines. In
ANR Pipeline
Company v. Iowa State Commerce Commission
,
*3 Taking note of the court's statement, the Iowa legislature moved the environmental provisions preempted only by reason of their non-severability to a separate chapter of the Iowa Code, Chapter 479A. The Iowa legislature passed this statute in 1988 "to confer upon the utilities board the power and authority to implement certain controls over the transportation of natural gas to protect landowners and tenants from environmental or economic damages . . . ." Iowa Code § 479A.1. The Iowa Utilities Board has promulgated regulations to implement Iowa Code chapter 479A: Iowa Administrative Code chapter 199-12, which provides for various pipeline reporting and inspection requirements, and Iowa Administrative Code chapter 199-9, which requires the restoration of agricultural land following pipeline work. These land restoration standards address topsoil separation and replacement, removal of rock and debris, drain tile repair, revegetation, and erosion control, among others matters.
Northern Natural Gas and Northern Border Pipeline transport and sell natural gas in interstate commerce, and are subject to regulation by the Federal Energy Regulatory Commission (FERC) under the Natural Gas Act (NGA), 15 U.S.C. § 717 et seq . When natural gas companies seek to construct, extend, acquire, or operate facilities for the transportation or sale of natural gas in interstate commercе, the NGA requires that such companies must be granted a "certificate of public convenience and necessity" by the FERC. 15 U.S.C. § 717f(c)(1)(A). Such certificates are granted only when the FERC finds that a company is willing and able to comply with the requirements, rules, and regulations of the federal regulatory scheme. § 717f(e).
In 2001, Northern Natural Gas sought to upgrade one of its pipelines near
DeWitt, Iowa. The company was authorized to do so under a "blanket certificate" of
public convenience and necessity granted by the FERC on September 1, 1982.
See
Northern Natural Gas Co., Div. of InterNorth, Inc
.,
To proceed with the upgrade project, Northern Natural Gas requested that the Iowa Utilities Board waive certain land restoration rules contained in Iowa Administrative Code chapter 199-9, citing its agreemеnt to comply with the FERC Plan. See Iowa Admin. Code rs. 199-1.3, 199-9.2(2) (waiver provisions). The Board refused to grant a waiver, stating in part that "the FERC Plan does not require restoration of the affected land to a condition as good as or better than provided in the Board's rules." (Joint App. at 468).
The gas companies brought suit in the district court seeking injunctive relief and a declaratory judgment that the Iowa statutory and regulatory provisions werе preempted by various provisions of federal law, including the Natural Gas Act and implementing regulations promulgated by the FERC, and violated the Contract *5 Clause of the United States Constitution. [2] The parties filed cross-motions for summary judgment.
The district court granted the motion for summary judgment filed by the gas companies on the preemption claim, and also entered a permanent injunction prohibiting Iowa from enforcing Iowa Code chapter 479A and Iowa Administrative Code chapters 199-9 and 199-12. The district court concluded that the Iowa provisions were preempted by federal law, because the field in which Iowa seeks to regulate is occupied by federal law, and because there is actual conflict between the Iowa provisions and federal law. The court pointed to various regulations of the FERC promulgated pursuant to the NGA and the NEPA, as well as the FERC Plan, in determining that federal law preempts the Iowa provisions. Alternatively, in the event that preemption did not invalidate all of Iowa Code chapter 479A, the district court also found that an Iowa statutory provision regarding reversion of rights-of- way, Iowa Code § 479A.27, violated the Contract Clause of the United States Constitution, Art. I, § 10, cl. 1, and granted the motion for summary judgment of the gas companies on this claim. The Board members timely appealed.
This court reviews grants of summary judgment de novo . Murphey v. City of Minneapolis , 358 F.3d 1074, 1077 (8th Cir. 2004). We will affirm the grant of summary judgment if there is no genuine issue as to any material fact and the moving party is entitled to judgment as a matter of law. See Fed.R.Civ.P. 56(c).
*6 II.
A.
Under the Supremacy Clause of the Constitution, Art. VI, cl. 2, state law will
be preempted when it conflicts with or frustrates federal law.
CSX Transp., Inc. v.
Easterwood
,
We agree with the district court that Iowa Cоde chapter 479A and the
implementing administrative code provisions regulate in a field that is occupied by
federal law. Since our decision in
ANR Pipeline Company v. Iowa State Commerce
Commission
, the Supreme Court decided
Schneidewind v. ANR Pipeline Company
,
We believe it follows from that the Iowa provisions regulate in an occupied field, and are thus preempted by the Natural Gas Act. The NGA confers on the FERC authority over the issues addressed by the Iowa statutory and regulatory provisions. The NGA specifically provides that the FERC will oversee the construction and maintenance of natural gas pipelines through the issuance of certificates of public convenience and necessity. See 15 U.S.C. § 717f(c). The FERC has аuthority to regulate the construction, extension, operation, and acquisition of natural gas facilities, see id . § 717f(c)(1)(A), and does so through its extensive and detailed regulations concerning applications for certificates. See generally 18 C.F.R. Part 157, Subpart A.
Many of the FERC's regulations relate to environmental concerns. The FERC's standard conditions for granting blanket certificates of public convenience and necessity include comрliance with many environmental statutes and regulations generally, 18 C.F.R. § 157.206(b), and the FERC Plan specifically. Id . § 157.206(b)(3)(iv). To implement the NEPA, the FERC also requires companies to prepare an environmental impact statement for certain major pipeline construction projects and for certain projects to develop underground natural gas storage facilities. . § 380.6(a)(2), (3). Applicants for certificates under the NGA typically must submit an environmental report that addresses a range of environmental issues, *8 including water use and quality, vegetation, geological resources, soils, and land use. . § 380.12(a), (d), (e), (h), (i), (j). Applicants for projects that will involve soil disturbance must submit a report detailing the "proposed mitigation measures to reduce the potential for adverse impact to soils or agricultural productivity," and how such mеasures compare to the FERC Plan. Id. § 380.12(i)(5). Thus, in analyzing the proposed projects of companies under its jurisdiction, the FERC considers environmental concerns, and specifically addresses the issues of soil preservation and land restoration -- the very areas which the Board wishes to regulate.
The Court in
Schneidewind
also took note of the "imminent possibility of
collision between" the Michigan statute and the NGA, which "further demonstrate[d]
the NGA's complete occupation of the field[.]"
In this case, the Iowa Utilities Board refused to grant a waiver for Northern Natural Gas's construction project, stating in part that the requirements under the FERC Plan were not as stringent as the Iowa regulations. This decision represents the sort of "disagreеment between state and federal authorities" that further demonstrated the NGA's complete occupation of the field in . 485 U.S. *9 at 310. As in Schneidewind , the imminent possibility of collision between the Iowa provisions and the federal regulatory scheme affects the ability of FERC to "achieve the uniformity of regulation which was an objective of the Natural Gas Act," id ., and further demonstrates that the Iowa provisions regulate in an ocсupied field.
The Board members argue that the Iowa regulations are not preempted, because
they do not conflict with the FERC Plan, and language in the FERC Plan even
contemplates supplemental state environmental regulation.
Schneidewind
, however,
did not rely on an actual conflict between federal and state regulations, or even on a
specific intent by the FERC to preempt state law. The broаd powers that the FERC
had at its disposal in regulating the rates and facilities of natural gas companies were
sufficient to demonstrate an implicit intent of Congress to preempt state regulation
through occupation of the field. at 309 & n.12. We think it is undeniable that
Congress delegated authority to the FERC to regulate a wide range of environmental
issues relating to pipeline facilities, and we agree with the cоnclusion of the Second
Circuit that "[b]ecause FERC has authority to consider environmental issues, states
may not engage in concurrent site-specific environmental review."
Nat'l Fuel Gas
Supply Corp. v. Pub. Serv. Comm'n
,
B.
We have considered carefully whether a line of administrative decisions by the
FERC, beginning with
Maritimes & Northeast Pipeline, L.L.C.
("
Maritimes
"),
impacts the preemption analysis that flows from . In
Maritimes
, the
FERC interpreted language in a certificate issued to Maritimes & Northeast Pipeline
Company in 1997. In that certificate, the FERC provided that "[t]he Commission
*10
encourages cooperation between interstate pipelines and local authorities," but further
stated that "this does not mean that state and local agencies, through application of
state and local laws, may prohibit or unreasonably delay the construction of facilities
approved by this Commission."
Maritimes and Northeast Pipeline, L.L.C.
, 80 FERC
¶ 61,136,
In discussion that has created some confusion abоut the scope of preemption
of state environmental regulations, the FERC continued in
Maritimes
by saying that
"[i]f a conflict arises . . . between the requirements of a State or local agency and the
Commission's certificate conditions, the principles of preemption will apply and the
federal authorization will preempt the State or local requirements." at *9. The
*11
FERC rejected the contention that the gas company in
Maritimes
needed not go
beyond federal standards to comply with more stringent or additional requirements
imposed by the State, saying it did "not view the concept of conflict so broadly."
Id.
According to the FERC in
Maritimes
, a "rule of reason" must govern whether
"additional costs or delays are unreasonable in light of the Commission's goal to
include State and local authorities to the extent possible in the planning and
construction activities of pipeline applicants." In the end, the FERC directed the
company that the certificate of public convenience and necessity, which was
conditioned on cooperating with state and local regulators, did in fact mandate
compliance with certain state environmental requirements. .;
see also NE Hub
Partners, L.P. v. CNG Transmission Corp.
,
There is language in the Maritimes line of decisions to suggest that the FERC, if it were considering the issuance of a new certificate to Northern Natural Gas for its project in Iowa, might well require -- as a matter of FERC policy -- compliance with certain Iowa regulations that would not cause unreasonable cost or delay in a pipeline construction project. In this case, however, Northern Natural Gas is operating pursuant to a blanket certificate issued by the FERC in 1982, and there is no claim thаt the certificate includes conditions regarding state regulation comparable to those set forth in Maritimes . The Board members in this litigation have not challenged the validity of Northern Natural Gas's certificate, or the manner in which the FERC treats various natural gas companies through the issuance of different types of certificates. The State of Iowa would seem to have a strong case to make with the FERC that protection of Iowa's valuable natural resources warrants at least the same level of *12 cooperation by natural gas companies with state authorities that the FERC required of gas companies in other States through certificates discussed in the Maritimes line of decisions. But whether there is an avenue for the Board to seek relief from the FERC, in the way of Maritimes -like conditions on Northern Natural Gas's blanket certificate or otherwise, is not before us.
The preemptive effect of the NGA, as defined in , does not
depend on whether the FERC intends to preempt state authority. Congress occupied
the field of interstate natural gas rates and facilities by delegating broad powers to the
FERC to regulate that field. The FERC, in the exercise of its regulatory authority, has
elected as a matter of policy to require that certain companies cooperate with state
and local authorities even though the field of regulation is occupied by federal law.
That policy decision by the FERC, featured in newer certificates and enforced though
adjudications such as
Maritimes
, does not change the preemptive effect of the NGA
as enacted by Congress. Moreover, the FERC itself in
Maritimes
endorsed the
holding of the Second Circuit in
National Fuel
,
see Maritimes
,
* * *
At oral argument, the Board members acknowledged that if the environmental provisions of Chapter 479A were preempted, then the other statutory sections would not be severable, and the entire chapter of the Code, as well as the accompanying regulations, would be preempted. As a result, we nеed not consider the district court's alternative holding that certain provisions of Iowa law conflicted with the Contract Clause. The judgment of the district court is affirmed.
______________________________
Notes
[1] The Honorable Harold D. Vietor, United States District Judge for the Southern District of Iowa.
[2] All told, the gas companies claimed the Iowa provisions were preempted by the Natural Gas Act, the Natural Gas Policy Act, 15 U.S.C. §§ 3301-3432, the National Environmental Policy Act (NEPA), 42 U.S.C. §§ 4321-4370a, the Natural Gas Pipeline Safety Act, 49 U.S.C. §§ 60101-60128, regulations adopted by the FERC, 18 C.F.R. Parts 154, 157, 284, and 380, and regulations adopted by the United States Department of Transportation, 49 C.F.R. Parts 190-199.
[3]
See also USG Pipeline Co.
,