MEMORANDUM OPINION
Pеnding before the Court is a motion for temporary restraining order and preliminary injunction by Plaintiffs Northern Air Cargo (“NAC”), Tatonduk Outfitters Ltd. d/b/a Everts Air Cargo (“Everts”), and Lynden Air Cargo LLC (“Lynden”) (col *119 lectively, “plaintiffs”). Plaintiffs seek to enjoin Defendant United States Postal Service (the “Postal Service”) from tendering nonpriority mainline bypass mail to Defendant-Intervenor Peninsula Airways, Inc. (“PenAir”) on five mainline routes in rural Alaska pursuant to 39 U.S.C. § 5402(g)(5)(C) (“§ 5402(g)(5)(C)”). Specifically, plaintiffs challenge the Postal Service’s purportedly ultra vires determination that PenAir had satisfied the “Prior Service and Capacity Requirement” of 39 U.S.C. § 5402(g)(l)(A)(iv)(II) (“§ 5402(g)(l)(A)(iv)(IR”) as of December 3, 2010. 1 Plaintiffs argue thаt they will suffer “immediate and irreparable injury in the form of ... substantial non-recoverable economic losses” if an immediate injunction is not granted. Pis.’ Mot. at 1. Upon consideration of the motion, the responses and reply thereto, the applicable law, the arguments of counsel made during the motions hearing held on December 21, 2010, and for the following reasons, the Court hereby DENIES plaintiffs’ motion for temporary restraining order and preliminary injunction.
I. BACKGROUND 2
This is the second action that plaintiffs have filed related to the Postal Service’s purportedly unlawful tender of nonpriority mainline bypass mail to PenAir. The first action came before the Court on November 3, 2009 as a motion for preliminary injunction (hereinafter, the “2009 Action”). See Civil Action No. 09-2065, Docket No. 5. In the 2009 Action, plaintiffs challenged the Postal Service’s August 7, 2009 and September 2, 2009 determinations that PenAir was eligible for the equitable tender of nonpriority mainline bypass mail on five mainline routes: Anchorage-Dillingham, Anchorage-King Salmon, Anchorage-Aniak, Anchorage-McGrath, and AnchorageUnalakleet. With the consent of the parties, plaintiffs’ motion for preliminary injunction was consolidated with a determination on the merits pursuant to Federal Rule of Civil Procedure 65(a)(2), and the parties subsequently filed cross-motions for summary judgment. See Civil Action No. 09-2065, Minute Order dated Nov. 4, 2009.
On September 23, 2010, this Court issued an opinion granting in part and denying in part the parties’ cross-motions for summary judgment.
3
The Court held, among other things, that the Postal Service had exceeded its statutory authority
*120
in determining that PenAir was not required to satisfy the Prior Service and Capacity Requirement of § 5402(g)(1)(A)(iv)(II) in order to be tendered nonpriority mainline bypass mail pursuant to § 5402(g)(5)(C).
See Northern Air Cargo,
On October 12, 2010, PenAir submitted a new application to the Postal Service once again requesting the equitable tender of nonpriority mainline bypass mail in the five mainline markets at issue in this case: Dillingham, King Salmon, Aniak, McGrath, and Unalakleet. See Postal Service’s Opp’n at 6-7; Declaration of Steven Deaton (“Deaton Deck”) ¶ 3. By letter dated October 21, 2010, the Postal Service found that PenAir had satisfied the Prior Service and Capacity Requirement. See Ex. B to Deaton Deck; see also Deaton Deck ¶ 4 (“[T]he [Postal Service] confirmed that PenAir had satisfied the Prior Service and Capacity Requirement ... by flying a mainline passenger aircraft between any two points within the State of Alaska for at least 12 months.... ”). The letter also stated, however, that because “[t]he district court did not address whether PenAir should receive credit for the past 13 months in which it has been providing mainline service in Alaska ... the actual tender of mail to PenAir may violate the court’s injunction.” Ex. B to Deaton Deck Prior to tendering nonpriority mainline bypass mail to PenAir, therefore, the Postal Service explained that it needed clarification from the Court regarding whether its proposed equitable tender would violate the Court’s injunction. See Ex. B to Deaton Deck (“[T]he Postal Service will immediately begin tendering mail to PenAir upon the occurrence of either of the following events: (1) the court lifts the injunction; [or] (2) PenAir obtains an appropriate clarification of (or modification to) the injunction, which, in the sole judgment of the Postal Service, makes it clear that tendering mail will not violate the court’s injunction.”).
On November 17, 2010, the Postal Service filed a “Motion for Order to Clarify Judgmеnt” in the 2009 Action. See Civil Action No. 09-2065, Docket No. 38. In its motion, the Postal Service asked the Court to clarify whether it “intended to credit PenAir for the past 13 months during which it has been providing mainline passenger service in Alaska.” Civil Action No. 09-2065, Postal Service’s Mot. for Clarification at 2. On December 2, 2010, the Court denied the Postal Service’s motion. See Civil Action No. 09-2065, Minute Order dated Dec. 2, 2010 (“After careful consideration of defendant’s motion, the Court concludes that the issue on which defendant seeks clarification — ‘whether PenAir should receive credit for the past 13 months during which it has been providing mainline service to Alaskаns,’ Def.’s Mot. at 2 — is not properly before the Court. Specifically, the Court finds that the issue presented by defendant would require the Court to entertain new factual and legal issues beyond the scope of the Court’s Memorandum Opinion and Order.”). Following the Court’s issuance of this ruling, the Postal Service concluded that PenAir had satisfied the Prior Service and Capacity Requirement. See Deaton Deck ¶¶ 7-8. Soon thereafter, on December 6, 2010, the Postal Service began ten *121 dering nonpriority mainline bypass mail to PenAir on the five requested mainline routes. See Deaton Decl. ¶ 7.
On December 8, 2010, plaintiffs filed an emergency motion for an order to show cause why the Postal Service should not be found in contempt in the 2009 Action, arguing that the Postal Service had violated the Court’s injunction by resuming tender of nonpriority mainline bypass mail to PenAir. See Civil Action No. 09-2065, Docket No. 47. On that same date, plaintiffs also filed the instant action, in which it requested a temporary restraining order and preliminary injunction. The Court held a status hearing in the cases on December 9, 2010, at which time it stayed briefing on plaintiffs’ motion for contempt in the 2009 Action, and entered an expedited briefing schedule in the instant case. A hearing was held on plaintiffs’ motion оn December 21, 2010. Plaintiffs’ motion for temporary restraining order and preliminary injunction is now ripe for determination by the Court.
II. LEGAL STANDARD FOR INTERIM INJUNCTIVE RELIEF
Preliminary injunctive relief is an “extraordinary remedy never awarded as of right.”
Winter v. NRDC, Inc.,
These four factors have typically been evaluated on a “sliding scale,” whereby if the movant makes an unusually strong showing on one of the factors, then it does not necessarily have to make as strong a showing on another factor.
Davis v. Pension Benefit Guar. Corp.,
III. ANALYSIS
Plaintiffs argue that all four factors necessary to obtain interim injunctive relief “weigh strongly in favor of Plaintiffs,” Pis.’ Mot. at 11 n. 9, while the Postal Service and PenAir argue that none of the criteria for interim injunctive relief have been met. The Court will begin by addressing plaintiffs’ likelihood of success on the merits.
*122 A. Substantial Likelihood of Success
The merits of this case turn on whether the Postal Service properly determined, on December 3, 2010, that PenAir had satisfied the Prior Serviсe and Capacity Requirement and was therefore an eligible mainline carrier under § 5402(g)(5)(C).
As a threshold matter, the Court’s analysis of the validity of the Postal Service’s interpretation of § 5402(g)(5)(C) is governed by
Chevron U.S.A. Inc. v. Natural Resources Defense Council, Inc.,
In this case, both parties rely on a “plain meaning” interpretation of the Prior Service and Capacity Requirement. Specifiсally, plaintiffs argue that the “plain language of the Prior Service and Capacity Requirement confirms that PenAir is not eligible to receive tender of mainline bypass mail under Section 5402(g)(5)(C),” Pis.’ Mot. at 12, while defendants contend that the Postal Service’s decision to tender nonpriority mainline bypass mail to PenAir “honors the plain language of the Prior Service and Capacity Requirement.” PenAir’s Opp’n at 7. For the reasons discussed below, the Court concludes that plaintiffs have failed to demonstrate that they have a substantial likelihood of success on the merits.
The Prior Service and Caрacity Requirement states, in relevant part, that:
The Postal Service, in selecting carriers of nonpriority bypass mail to any point served by more than 1 carrier in the State of Alaska, shall adhere to an equitable tender policy within a qualified group of carriers, in accordance with the regulations of the Postal Service, and shall, at a minimum, require that any such carrier... (iv) have provided scheduled service with at least the number of scheduled noncontract flights each week established under subparagraph (B)(ii) between 2 points within the State of Alaska for at least 12 consеcutive months with aircraft... (II) over 7,500 pounds payload capacity before being selected as a carrier of nonpriority bypass mail at the intra-Alaska mainline service mail rate.
39 U.S.C. § 5402(g)(l)(A)(iv)(II). Plaintiffs argue that — contrary to the plain language of § 5402(g)(l)(A)(iv)(II) — the Postal Service impermissibly relied upon the ten months that PenAir was unlawfully carrying nonpriority mainline bypass mail (i.e., while the 2009 Action was pending) in concluding that PenAir satisfied the Prior Service and Capacity Requirement. 4 Spe *123 eifically, plaintiffs argue that “[f]or the Pri- or Service and Capacity Requirement to have any meaning, a carrier must provide thе required service before being tendered Mainline Bypass Mail.” Pis.’ Mot. at 14 (emphasis in plaintiffs’ motion). Plaintiffs further assert that “[n]othing in the Prior Service and Capacity Requirement permits a carrier to satisfy the requirement while carrying — and being compensated for carrying — Mainline Bypass Mail,” and that “[s]uch an interpretation contravenes the plain language of the statute and flies in the face of the unmistakable purpose of the statute; i.e., to ensure that prospective new carriers demonstrate their viability and a sustained commitment to serving the rural Alaskan communities with Large Aircraft for twelvе consecutive months before being permitted to underwrite their operations with the financially significant Mainline Bypass Mail revenues.” Pis.’ Mot. at 14 (emphasis in plaintiffs’ motion). In sum, because PenAir only operated an aircraft with over 7,500 pounds payload capacity for approximately two months before it began receiving an ultra vires tender of nonpriority mainline bypass mail from the Postal Service, plaintiffs argue that the Postal Service impermissibly determined on December 3, 2010 that PenAir had satisfied the clear and unambiguous language of the Prior Service and Capacity Requirement.
Defendants, by contrast, argue that the Postal Service’s ultra vires tender of nоnpriority mainline bypass mail to PenAir is irrelevant to whether the Postal Service properly determined that PenAir had satisfied the Prior Service and Capacity Requirement as of December 3, 2010. Instead, defendants assert that “[dieter-mining whether the Postal Service has validly ‘selected’ a carrier for nonpriority mainline bypass mail is [ ] a simple exercise in arithmetic: Count backwards 12 months from the date of selection; if the carrier has flown the requisite number of scheduled mainline flights during those 12 straight months, the carrier qualifies and the Postal Service’s selection is valid.” PenAir’s Opp’n at 7. Because PenAir had operated the requisite number of scheduled mainline flights for approximately 16 consecutive months prior to the Postal Service’s December 3, 2010 decision to tender nonpriority mainline bypass mail to PenAir, PenAir argues that the Postal Service correctly determined that the airline had satisfied the unambiguous requirements set forth in § 5402(g)(l)(A)(iv)(II). See PenAir’s Opp’n at 7-8; see also Deaton Decl. ¶4 (“[T]he [Postal Service] confirmed that PenAir had satisfied the Prior Service and Capacity Requirement ... by flying a mainline passenger aircraft between any two points within the state of Alaska for at least 12 months, after reviewing the flight schedules submitted to the Postal Service as well as data provided electronically to the Postal Service by the Official Airline Guide.... In reaching that conclusion, the [Postal Service] did not segregate bypass mail-carrying flights -and non-bypass mail-carrying flights because the statute, section 5402(g)(l)(A)(iv), merely states that the airline requesting immediate equitable tender of mainline bypass mail must have ‘provided scheduled service with at least the number of scheduled noncontract flights each week ... between 2 points within the State of Alaska for at least 12 *124 consecutive months.’ ”). 5
Upon careful consideration of the parties’ arguments* thе Court concludes that plaintiffs have failed to establish that they have a “substantial likelihood” of success on the merits.
Ark. Dairy Coop.,
B. Irreparable Harm
Next, the Court must determine whether plaintiffs will suffer irreparable harm in the absence of interim injunctive relief. This Circuit “has set a high standard for irreparable injury.”
Chaplaincy of Full Gospel Churches,
Plaintiffs argue that from November 9, 2009 through September 23, 2010— the time period during which PenAir was unlawfully tendered nonpriority mainline bypass mail in the Anchorage-Dillingham, Anchorage-King Salmon, Anchorage-Aniak, Anchorage-McGrath, and AnchorageUnalakleet markets — plaintiffs collectively lost approximately $4 million in revenue as a result of their decreased market share.
See
Pis.’ Mot. at 18-19;
see also
Declaration of David Karp (“Karp Deck”) ¶ 11 (averring that NAC lost approximately $1.3 million in revenue from November 9, 2009 through September 23, 2010); Declaration of Judy A. McKenzie (“McKenzie Deck”) ¶ 9 (averring that Lynden lost approximately $1.5 million in annual revenue from nonpriority bypass mail and freight after it was forced to exit the Dillingham market on February 13, 2010); Declaration of Susan Hoshaw (“Hoshaw Deck”) ¶ 10 (averring that Everts lost approximately $1.17 million in bypass mail revenues and $386,000 in freight revenues from November 9, 2009 through September 23, 2010). Plaintiffs assert that “[i]f the Postal Service resumes tendering Mainlinе Bypass Mail to PenAir in the five requested markets, Plaintiffs will suffer losses proportionate to those suffered from November 9, 2009 through September 24, 2010.” Pis.’ Mot. at 19. Because they “currently have no mechanism to recover these or future losses resulting from the Postal
*125
Service’s
ultra vires
acts[,]” plaintiffs argue that their injuries “constitute
per se
irreparable harm.” Pis.’ Mot. at 19-20 (citing
Express One Int’l, Inc. v. U.S. Postal Serv.,
In response, defendants argue that “[t]his Court has consistently rejected the argument Plaintiffs advance that nonrecoverable economic damages ... constitute per se irreparable harm,” Postal Service’s Opp’n at 13 (citing cases), and assert that plaintiffs cannot demonstrate irreparable harm “from a slight reduction in market share in the five markets at issue[.]” Postal Service’s Opp’n at 11. This Court agrees.
In order to obtain interim injunctive relief, it is not enough for a plaintiff to show that it will suffer some harm in the absence of an injunction; instead, the moving party must demonstrate that its harm will be “great.”
Wisc. Gas,
In this case, the Court finds that plaintiffs have failed to satisfy this Circuit’s stringent standard for irreparable harm based on their failure to offer “ ‘substantiation of severe economic impact.’ ” PenAir’s Opp’n at 17 (quoting
WMATC v. Holiday Tours, Inc.,
C. Harm to Other Interested Parties
Because the Postal Service has been tendering nonpriority mainline bypass mail to PenAir since December 6, 2010, PenAir would undoubtedly be harmed if the Court entered an interim injunction.
See
Declaration of Daniel Seybert (“Seybert Deck”) ¶ 20 (“[A]n injunction preventing the Postal Service from continuing to tender [nonpriority mainline bypass] mail to PenAir would result in PenAir losing millions of dollars in revenue. ... Plaintiffs claim lost revenues totaling about $4 million, split among the three Cargo Carriers (with no single Plaintiff claiming lоst revenues of more than $1.5 million in freight and mail). By contrast, an injunction barring the Postal Ser
*127
vice from tendering this nonpriority mainline bypass mail to PenAir would cause PenAir to lose about $4 million in revenues, more than two-and-a-half times the lost revenues any single Plaintiff claims it would lose.”). Whatever revenue losses plaintiffs will lose to PenAir in the absence of an injunction, PenAir will lose to plaintiffs in the presence of one. The Court therefore concludes that the harm alleged by plaintiffs and the harm faced by PenAir are essentially “ ‘a wash.’ ”
Sanofi-Aventis,
D. Public Interest
The last factor thе Court must consider is whether the public interest favors entry of a preliminary injunction. Plaintiffs argue that “[t]he public interest is ‘best served by having federal agencies comply with the requirements of federal law.’ ” Pls.’ Mot. at 21 (quoting
Patriot, Inc. v. U.S. Dep’t of Housing & Urban Dev.,
In light of this uncertainty, the Court is unwilling to conclude that the public interest would be served by enjoining the tender of nonpriority mainline bypass mail to the only mainline passenger carrier on the five mainline routes at issue in this case: Dillingham, King Salmon, Aniak, McGrath, and Unalakleet. 11 While plaintiffs argue that an interim injunction would not prevent PenAir from continuing to provide mainline passenger serviсe, Pis.’ Reply at 13, PenAir has indicated that it would likely cease to provide mainline passenger service on four of the five routes if an interim injunction was entered. As a result, Alaskan residents in at least four communities would likely be left without mainline passenger service. Based on the current posture of this case, therefore, the Court concludes that plaintiffs have failed to establish that the public interest favors interim injunctive relief.
IV. CONCLUSION
For the foregoing reasons, the Court DENIES plaintiffs’ motion for a temporary restraining order and preliminary injunction. This decision, however, in no way foreclosеs the possibility that plaintiffs will be able to establish that the Postal Service impermissibly determined that PenAir was eligible for the equitable tender of nonpriority mainline bypass mail on December 3, 2010. As this Court has al
*128
ready recognized, plaintiffs have raised some compelling arguments in support of their position; upon a more fully developed record, plaintiffs may well be able to succeed on the merits. Instead, the Court holds only that upon the current record, plaintiffs have failed to demonstrate, “by a clear showing,” that they are entitled to the extraordinary and drastic remedy of interim injunctive relief.
Chaplaincy of Full Gospel Churches,
Even though plaintiffs have failed to establish that they meet the stringent criteria for the grant of a temporary restraining order or preliminary injunction, the Court is nevertheless sensitive to plaintiffs’ claims of irrecoverable economic injury. In an effort to minimize any potential losses, therefore, the parties are directed to propose an expedited briefing schedule to the Court that will enable the case to be argued and resolved in April 2011. An appropriate Order accompanies this Memorandum Opinion.
SO ORDERED.
Notes
. As discussed infra, the Prior Service and Capacity Requirement requires the Postal Service “in selecting carriers of nonpriority bypass mail ... [to] adhere to an equitable tender policy ... and [to], at a minimum, require that any such carrier... (iv) have provided scheduled service ... between 2 points within the State of Alaska for at least 12 consecutive months with aircraft... (II) over 7,500 pounds payload capacity before being selected as a carrier of nonpriority bypass mail at the intra-Alaska mainline service mail rate.” 39 U.S.C. § 5402(g)(l)(A)(iv)(II).
. An extensive factual and statutory background is set forth in the Court's September 23, 2010 Memorandum Opinion, which was issued in Civil Action No. 09-2065. Fоr purposes of this Opinion, the Court will assume the parties' familiarity with this factual and statutory background, and will direct interested readers to the Court’s September 23, 2010 Memorandum Opinion for additional background. See
Northern Air Cargo v. United States Postal Serv.,
No. 09-2065,
.The Court’s September 23, 2010 ruling is currently being appealed by both plaintiffs and PenAir. See USCA Case Numbers 10-5385 and 10-5402.
. It is undisputed that PenAir did not begin operating aircraft with over 7,500 pounds *123 payload capacity until on or about August 22, 2009. It is also undisputed that the Postal Servicе began tendering nonpriority mainline bypass mail to PenAir on November 9, 2009 and continued to do so until the Court issued its Memorandum Opinion in the 2009 Action on September 23, 2010. See Pis.’ Mot. at 13.
. In further support of its plain language interpretation, PenAir asserts that the first clause of § 5402(g)(1)(A) sets forth the factors that the Postal Service must consider “when 'selecting carriers of nonpriority mainline bypass mail' — that is, when making its present decision.” PenAir's Opp’n at 9 (quoting 39 U.S.C. § 5402(g)(1)(A)) (emphasis in PenAir’s brief). PenAir explains that § 5402(g)(l)(A)(iv)’s requirement that an airline must have provided the requisite number of flights for at least 12 consecutive months "before being selected as a carrier of nonpriority [mainline] bypass mail,” 39 U.S.C. § 5402(g)(l)(A)(iv)(II), is “most naturally read to refer to the Postal Service’s present decision: a carrier must have flown for 12 months continuously before the Postal Service selects it to carry bypass mail now.” PenAir’s Opp’n at 10 (emphasis in PenAir’s brief). Focusing on the structure of § 5402(g)(1)(A), PenAir argues that "[plaintiffs’ contention that ‘selecting’ refers to one decision in Section 5402(g)(1)(A) and 'being selected’ refers to an entirely different decision — when used in a subclause of the same section — is simply not plausible.” PenAir’s Opp'n at 10 (emphasis in PenAir's brief).
. In
Wisconsin Gas,
the Circuit held that “recoverable monetary loss may constitute irreparable harm only where the loss threatens the very existence of the movant’s business.’’
. See PenAir's Opp'n at 17-18 (“The fact that the Plaintiffs will lose market share on five discrete — and very remote — Alaskan routes says absolutely nothing аbout how that will impact the Plaintiffs’ economic survival.... Nothing in the Plaintiffs' declarations remote *126 ly suggests that PenAir's entry into these five small markets will precipitate bankruptcy or mass layoffs. Indeed, the combined damages that the Plaintiffs forecast they will suffer is under $4 million' — or roughly $1.3 million on average apiece. While a million dollars is certainly real money, the Plaintiffs’ declarations never suggest how big — or small — this putative loss would be as a percentage of their annual gross revenues.”).
. Plaintiffs failed to address this issue until their counsel was specifically questioned about it during oral argument on December 21, 2010. In response to the Court’s questioning, plaintiffs' counsel provided a chart to the Court which purportedly reflects the net income of each of the plaintiffs during the time period that PenAir was receiving the ultra vires tender of nonpriority mainline bypass mail. Despite its best efforts, the Court finds plaintiffs’ chart incomprehensible and therefore unpersuasive. Moreover, this late-proffered chart, which provides no information regarding plaintiffs’ gross revenues for the same time period, is simply insufficient to satisfy plaintiffs’ heavy burden of demonstrating irreparable harm.
. The Court will note that while an airline's projected loss of approximately $1.3 million over 10 months is by no means insignificant, this Court has declined to grant prospective injunctive relief when much larger sums of irrecoverable economic losses were at stake.
See, e.g., Sanofi-Aventis U.S. LLC v. FDA,
No. 10-1255,
. While plaintiffs also assert that they will "suffer serious non-economic harm ... in the form of cancelled flights, withdrawal from the market(s), and terminated employees” in the absence of an injunction, Pis.' Reply at 12, PenAir has represented that in the presence of an injunction it will cease to provide mainline passenger service on four of the five lines at issue in this case. These non-economic harms, therefore, appear to be unavoidable regardless of the Court’s decision.
. Plaintiffs only provide cargo service to these five Alaskan communities.