MEMORANDUM OPINION AND ORDER
These two related cases involve challenges to the construction of a federal highway project around the city of Winston-Salem, North Carolina.
In case l:99cvl34, this court entered an Order of Dismissal by consent of all parties on June 29, 1999 (“Order of Dismissal”), which prohibited further work on the highway project until certain enumerated actions occurred. (Doc. 21.) 1 Defendants United States Department of Transportation (“USDOT”), Ray LaHood (Secretary, USDOT), Federal Highway Administration (“FHWA”), Victor Mendez (Administrator, FHWA), and John F. Sullivan, III, (Division Administrator, FHWA) (collectively “Federal Defendants”) and North Carolina Department of Transportation (“NCDOT”) and Eugene A. Conti, Jr., (Secretary, NCDOT) (collectively “State Defendants” and collectively with Federal Defendants “Defendants”) contend that they have satisfied the terms of the Order of Dismissal and thus move jointly to dissolve it. 2 (Doc. 122 at 2.) Plaintiffs North Carolina Alliance for Transportation Reform, Inc. (“Alliance”), a not-for-profit organization that seeks to promote the most cost-efficient transportation system in the state while preserving cultural, historical, environmental and economic quality of life, and Friends of Forsyth, a not-for-profit unincorporated association of landowners within the path of the proposed highway, whose members are also members of the Alliance (collectively with Alliance “Plaintiffs”), contest that compliance has occurred and oppose the motion. (Doc. 126.) For the reasons that follow, the court will grant Defendants’ joint motion.
In case l:08cv570, Plaintiffs again challenge further construction on the highway project. Plaintiffs now seek summary judgment principally on the grounds that the required environmental analysis fails to (1) evaluate the effect the project would have on global climate change through the production of greenhouse gases and (2) account for the impact of two future connecting road construction projects not contained in the current project. (Doe. 21.) Plaintiffs allege that these failures constitute violations of the National Environmental Policy Act of 1969 (“NEPA”), 42 U.S.C. § 4321 et
seq.,
and the North Carolina Environmental Policy Act (“NCE-PA”), N.C. Gen.Stat. § 113A-1,
et seq.
Defendants oppose Plaintiffs’ motion and seek summary judgment themselves on the grounds that the alleged omissions do not violate federal law. (Docs. 27, 30.) Federal Defendants also move to strike certain documents that Plaintiffs submitted with their motion for summary judg
I. BACKGROUND
A. Case l:99cvl34
In 1989, the North Carolina General Assembly created the North Carolina Highway Trust Fund, which designated seven urban areas, including Winston-Salem, around which highway loops would be constructed. N.C. Gen.Stat. § 136-175 (1999). Created from that legislation were federally-funded Transportation Improvement Program (“TIP”) Projects R-2247, U-2579, and U-2579A which, taken together, span 34.2 miles and are commonly known as the Winston-Salem Northern Beltway (“Northern Beltway”). Project R-2247 encompasses the western section of the Northern Beltway from U.S. 158 north to U.S. 52 in western Forsyth County, North Carolina (“Western Section”). Projects U-2579 and U-2579A comprise the eastern section of the Northern Beltway from U.S. 52 to U.S. 311 in eastern Forsyth County (“Eastern Section”).
On June 24, 1992, NCDOT issued a Draft Environmental Impact Statement (“DEIS”) 4 for the Western Section. On March 29, 1996, NCDOT published the Final Environmental Impact Statement (“FEIS”). On May 6, 1996, the Raleigh Division of FHWA submitted the Record of Decision (“ROD”) 5 for the Western Section to the FHWA Regional Administrator, who approved it the next day. Issuance of the ROD represented the final agency action on the Western Section and completed the NEPA process. By issuing the ROD, the FHWA effectively approved the project and accepted the FEIS.
On February 18, 1999, Plaintiffs filed case l:99cvl34 in this court alleging that the Western Section FEIS violated NEPA and NCEPA and sought, among other remedies, an injunction against any further action on the project. Approximately two weeks later, the Court of Appeals for the District of Columbia Circuit decided
Environmental Defense Fund v. EPA
With the reopening of the NEPA process, Plaintiffs’ action to enjoin Defendants became moot. Consequently, on June 21, 1999, the parties filed a joint motion for an order of dismissal. This court granted the joint motion on June 29, 1999, dismissing the Complaint without prejudice and finding that the final agency action had been superseded because the environmental analyses would have to be redone. The Order of Dismissal also provided the following:
3. Federal defendants shall not grant any further approvals, enter into any contracts, or provide any funds relating to the acquisition of property or construction of the Winston-Salem Beltway (hereinafter “Bypass Project”) until the new environmental analysis and documentation process has been completed, a conforming Long Range Transportation Plan and Transportation Improvement Program for the Winston-Salem metropolitan area have been approved, and federal defendants issue a new Record of Decision pursuant to applicable federal law for the Bypass Project;
4. State defendants shall not take any irrevocable actions relating to construction, right-of-way acquisitions, or negotiations for right-of-way acquisitions, in furtherance of the Bypass Project until the conditions set forth in paragraph 3 above have been met____
N.C. Alliance for Transp. Reform v. U.S. Dep’t of Transp., No. 1:99cv134 (M.D.N.C. June 29, 1999) (Order of Dismissal).
Subsequently, this court awarded Plaintiffs attorneys’ fees as prevailing parties, finding that Defendants’ failure to analyze the Eastern Section and Western Section of the Northern Beltway together in one environmental impact statement violated NEPA.
N.C. Alliance,
B. Case l:08cv570
Defendants returned to the drawing board, and in March 2004 they published a revised notice of intent to prepare an environmental impact statement for the combined Western Section and Eastern Section of the Northern Beltway and solicited public comments. A number of public meetings were held to solicit input on the range of alternatives to be considered. On October 1, 2004, Defendants published a Supplemental FEIS for the Western Section and a Supplemental DEIS for the Eastern Section. A conforming Long Range Transportation Plan (“LRTP”) for the Winston-Salem metropolitan area, which includes the Northern Beltway, was approved by the Winston-Salem Urban
On January 11, 2007, after considering the public comments it received on the DEIS for the Eastern Section, Defendants issued a Supplemental FEIS/FEIS for the entire Northern Beltway (“SFEIS/FEIS”). 7 The SFEIS/FEIS is comprised of three volumes containing over 1,700 pages and analyzed the proposed Northern Beltway’s direct, indirect, and cumulative environmental effects on affected resources, including air quality, water quality, utilities and infrastructure, cultural resources, visual impacts, noise, hazardous materials, soils, and wildlife. Just over one year later, on February 15, 2008, FHWA signed the ROD 8 authorizing the Northern Beltway. In all, the administrative record related to the Northern Beltway comprises more than 32,000 pages.
On August 13, 2008, Plaintiffs filed case l:08ev570 in this court, alleging that the Northern Beltway SFEIS/FEIS violates NEPA and NCEPA because it fails to evaluate greenhouse gas emissions and lacks consideration of proposed highway projects for a southern beltway loop (“Southern Loop”) and a connector to the Piedmont Triad International Airport (“Airport Connector”). On June 1, 2009, Plaintiffs filed a motion for summary judgment. (Doc. 19.) Federal and State Defendants each filed an opposition to Plaintiffs motion and a cross-motion for summary judgment on July 8, 2009. (Docs.27, 30.) Additionally, Federal Defendants seek to strike certain documents Plaintiffs filed with their motion for summary judgment as appendices on the grounds they improperly expand the record (Doc. 32); Plaintiffs have filed an opposition (Doc. 34). Briefing was completed September 2009, and the court heard oral argument on all motions on March 26, 2010.
All motions before the court are considered below.
II. ANALYSIS
The merits of whether or not to build the Northern Beltway are not before the court; rather, the court’s inquiry is limited to whether Defendants have complied with NEPA.
Nat’l Parks & Conservation Ass’n v. U.S. Dep’t of Transp.,
NEPA sets a national policy of protecting and promoting environmental quality.
See
42 U.S.C. §§ 4321, 4331(a). Its purposes are two-fold: “to ensure that agencies will carefully consider detailed information concerning significant environmental impacts and to guarantee that the relevant information will be made available
(i) the environmental impact of the proposed action,
(ii) any adverse environmental effects which cannot be avoided should the proposal be implemented,
(iii) alternatives to the proposed action,
(iv) the relationship between local short-term uses of man’s environment and the maintenance and enhancement of long-term productivity, and
(v) any irreversible and irretrievable commitments of resources which would be involved in the proposed action should it be implemented.
42 U.S.C. § 4332(2)(C);
see Hughes River Watershed Conservancy v. Glickman,
To implement NEPA’s provisions, Congress created the Council on Environmental Quality (“CEQ”), which in turn promulgated implementing regulations.
See
40 C.F.R. §§ 1501.1-1508.28. CEQ regulations “are binding on all federal agencies, and CEQ’s interpretation of NEPA is entitled to substantial deference.”
Sugarloaf Citizens Ass’n v. Fed. Energy Regulatory Comm’n,
NEPA contains no independent private right of action, but final agency actions are subject to judicial review under the Administrative Procedure Act (“APA”), 5 U.S.C. §§ 702, 706;
Lujan v. Nat’l Wildlife Fed’n,
Deference to agency expertise does not “shield [an agency] from a thorough, probing, in-depth review,” however.
Citizens to Preserve Overton Park, Inc. v. Volpe,
A. Case l:99cvl34: Motion to Dissolve Order of Dismissal
Defendants first seek dissolution of the Order of Dismissal in case l:99cvl34. More accurately, they seek to dissolve that portion which enjoined them from taking any further action relating to the Winston-Salem Beltway until “the new environmental analysis and documentation process has been completed, a conforming Long Range Transportation Plan and Transportation Improvement Program for the Winston-Salem metropolitan area have been approved, and federal defendants issue a new Record of Decision pursuant to applicable federal law for the Bypass Project.” (Doc. 21.) Defendants contend that these conditions have been met (Doc. 122 at 2-3) and that compliance has eliminated any “case or controversy” within the meaning of Article III, section 2, of the Constitution, consequently divesting this court of jurisdiction to enforce the injunction any further. (Id. at 3.)
Plaintiffs oppose this request for relief, asserting that Defendants have not complied with the terms of the injunction. Specifically, Plaintiffs contend that the new environmental analysis — the SFEIS/ FEIS — contains a “seriously flawed safety analysis” that renders the ROD not issued in accordance with NEPA and thus not “pursuant to applicable law.” (Doc. 126 at 2.) Defendants respond that the injunction requires only reissuance of the environmental documentation and does not contemplate substantive compliance with the environmental laws and, even if it did, the documentation passes muster under NEPA. (Doc. 132.)
Defendants have not identified any specific legal basis for them motion, other than the terms of the Order of Dismissal. The Order of Dismissal appears not to be a final order insofar as it dismissed the complaint in case l:99cvl34, but not the action, without prejudice.
See Chao v. Rivendell Woods, Inc.,
The injunctive provisions of the Order of Dismissal, however, do not fall neatly into the category of interlocutory orders. Unlike interlocutory orders that are in effect during the pendency of the action, the injunctive provisions extend beyond the dismissal of the complaint (albeit without prejudice) and proscribe further activity indefinitely into the future. Indeed, in this case those proscriptions have operated continuously for over a decade. To this end, they operate more like a consent decree. It is not surprising, therefore, that when the parties have reached agreement in the past that Defendants could engage in certain limited activity despite the proscriptions of the Order of Dismissal, they have styled their consent requests as seeking relief from judgment under Rule 60(b). (See, e.g., Docs. 31-43.)
While “[a]n injunction prohibiting a federal project until the filing of an impact statement does not precisely fit the models to which ... Rule 60(b)(5) [is] directed,”
Sierra Club v. Mason,
Under Rule 60(b), a party may be afforded relief from an injunction that “has been satisfied” or where prospective application of the order is “no longer equitable.” Fed.R.Civ.P. 60(b)(5);
Thompson v. U.S. Dep’t of Hous. & Urban Dev.,
Before consideration of the merits, a Rule 60(b) movant must generally satisfy three threshold conditions: (1) timeliness of the motion, (2) existence of a meritorious claim or defense, and (3) absence of unfair prejudice to the opposing party.
Park Corp. v. Lexington Ins. Co.,
Having found those threshold conditions satisfied, the court turns to consideration of the merits.
1. Satisfaction of the Order of Dismissal
Under Rule 60(b)(5), the court may relieve a party of the obligations of an injunction where its conditions have been satisfied. Defendants contend that satisfaction requires that they have engaged in the procedural steps of conducting the necessary environmental analysis, obtained an approved LRTP and TIP, issued a SFEIS/ FEIS, and adopted a ROD — all of which they have done. Defendants contend therefore that the court lacks jurisdiction to review the SFEIS/FEIS and ROD to determine their compliance with federal law, including NEPA. Plaintiffs contend that this is a misreading of the Order of Dismissal, whose terms requiring that the ROD be issued “pursuant to applicable federal law” mandate that this court examine Plaintiffs’ additional challenges to its safety analysis under NEPA.
The court concludes that Plaintiffs read too much into the Order of Dismissal. While the Order of Dismissal was entered by a judge other than the undersigned, consideration of the events leading to its entry convinces the court that the injunctive provisions were not intended to remain in effect until entry of another judicial decree that considered new, not yet brought, challenges to the subsequent ROD. After Plaintiffs brought their case in 1999, Defendants agreed before even filing an answer to “reopen the NEPA process” and “effectively withdrew the previously issued ROD.”
N.C. Alliance,
we will not grant further approvals on the Winston-Salem Bypass project until after we have completed any new or supplemental environmental analysis and documentation; the Bypass project has come from a currently conforming LRTP and TIP for the Winston-Salem metropolitan area; and we have made a new final decision to proceed with the project.
N.C. Alliance,
Other courts have likewise indicated that plaintiffs must institute separate proceedings to challenge the adequacy of the environmental documents filed in response to an injunction.
See Hunt v. N.C. Dep’t of Transp.,
The Order of Dismissal requires that a “new environmental analysis and documentation process be completed” and that Defendants “issue a new Record of Decision pursuant to applicable federal law.” The reference to “pursuant to applicable federal law” does not contemplate retention of jurisdiction to consider further challenges in the absence of a new complaint. Where that retention is intended, courts have so stated.
See, e.g., Nat’l Audubon Soc’y v. Butler,
Plaintiffs rely on
Public Service Co. of Colorado v. Batt,
Ordinarily, the proper remedy for Plaintiffs would have been to have filed a new complaint in case l:99cvl34 (putting Defendants on notice of their claims) or including their safety analysis claims in case l:08cv570. For some unexplained reason, Plaintiffs did neither. But because the court concludes that Plaintiffs’ safety analysis arguments lack merit, and considering the need for judicial efficiency given the length of time since the onset of litigation over the Northern Beltway, the court will address, on an alternative ground, the arguments raised by Plaintiffs on the merits.
Cf. Habitat Educ. Ctr., Inc. v. Kimbell,
NEPA requires federal agencies to carefully consider all significant environmental impacts ofia proposed action.
See Robertson v. Methow Valley Citizens
In opposing Defendants’ motion to dissolve the Order of Dismissal, Plaintiffs argue that the SFEIS/FEIS, which justified the Eastern Section in part on safety considerations, contains a “seriously flawed” crash analysis in Table 1-12, and that the analysis was revised but “not entirely corrected” in the ROD. (Doc. 127 at 7.) Plaintiffs contend that by signing off on the changed table in the ROD, Defendants based the ROD on a “flawed SFEIS/ FEIS” that violated NEPA. (Id. at 8.) Defendants concede that the analysis of Table 1-12 in the SFEIS/FEIS contained errors but argue that, in response to comments received, they were corrected in the ROD before it was approved and nevertheless did not constitute a significant change so as to require a supplemental environmental impact statement. (Doc. 132 at 5-10.)
NEPA requires an agency to take a hard look at the environmental consequences of its proposed action even after an environmental impact statement is prepared.
Marsh v. Oregon Natural Res. Council,
The court “must take a holistic view of what the agency has done to assess environmental impact” and not look “for any deficiency, no matter how minor.”
Nat’l Audubon,
Table 1-12 provides accident data for the years 1999-2002 for thirteen road segments in the study area for the Eastern Section of the Northern Beltway. (SFEIS/FEIS, vol. 1, at 1-46.) In order to determine if the roadways in the study areas sustain a higher than average accident rate, the total accident rate for each roadway segment in Table 1-12 was compared to a calculated “critical crash rate” for each roadway segment. (Id. at 1-43.) The critical crash rate was calculated using a formula that considers the statewide crash rate, vehicle exposure, and a probability constant. (Id. at 1-47.) Safety ratios were then calculated by “dividing the total accident rate for the roadways by the critical crash rates.” (Id. at 1-43.) Defendants state, and Plaintiffs do not dispute, that “[sjafety ratios over 1.00 indicate the roadway accident rate exceeds the critical rate for that type of facility.” (Id.) Thus, the critical crash rate is a statistical tool that helps analyze whether a segment’s actual crash rate is higher than its critical rate and, if so, identifies the possibility that the location may have a safety deficiency that could be examined further. (Id. at 1^47.) The critical crash rate was calculated only for the Eastern Section “since safety is part of the Eastern Section purpose and need.” (Id. at 1-43.)
Table 1-12 in the SFEIS/FEIS denoted six of thirteen road segments with a safety ratio greater than 1.00 (two segments of U.S. 52, one segment of U.S. 311, and three segments of N.C. 66). 9 (Id. at 1-46.) After considering Plaintiffs’ comments on a range of issues (ROD at 54-55), Defendants conceded two errors. First, the vehide exposure variable (denoted “M,” which is a measure of the miles driven on the segment) in the critical crash rate formula was incorrect. (ROD at 63.) The error stemmed from the use of an average, instead of weighted, “average daily traffic” (“ADT”) calculation. (Doc. 134, Affidavit of J. Kevin Lacy, P.E., C.P.M. (“Lacy Aff.”), ¶ 15.) NCDOT prefers a weighted average because it takes into account the total roadway distance and the appropriate distance between the measuring sites. (Id.) The correction and reason were noted in the ROD and resulted in a quantitative decrease in many of the safety ratios. (See ROD at 54, 65.) Second, the SFEIS/ FEIS used an incorrect ADT value for two segments in Table 1-12 (U.S. 311 between 1-40 and N.C. 66, and U.S. 158 between U.S. 421/N40 Business and N.C. 66). (Lacy Aff. ¶ 16.) This correction was noted in the ROD as well. (Id. at 63, 65.) As a result of these corrections, the number of Eastern Section segments with a safety ratio greater than 1.00 remained constant: 6 of 13 calculated in Table 1-12 in the SFEIS/FEIS and 6 of 13 as published in the ROD. (Compare SFEIS/FEIS, vol. 1 at 1 — 46 ivith ROD at 65.)
Plaintiffs argue first that Defendants’ Table 1-12 in the ROD “significantly lowered twelve of the thirteen safety ratios given in the SFEIS/FEIS” Table 1-12. (Doc. 126 at 2 n. 2.) Because these changes were made in the ROD and well after the SFEIS/FEIS was issued, Plaintiffs maintain, Defendants violated NEPA’s requirement that an environmental impact statement be prepared before a decision.
See Sierra Club v. Peterson,
While it is true that twelve of the thirteen safety ratios were lowered as a result of Defendants’ corrections, nowhere do Plaintiffs offer any evidence that the changes were in fact significant in an engineering or statistical sense. Defendants, on the other hand, have presented evidence that they are not. Mr. Lacy, a thirteen-year employee of NCDOT and manager of its Traffic Engineering and Safety Systems Branch, testified in his affidavit as follows:
The safety ratio is best thought of as a yes or no question: is the ratio higher than one? If yes, then something other than chance is likely contributing to crashes. While the ratio is rounded to two decimal places in Table 1-12, it is actually not materially important that the exact value of the safety ratio is, i.e. whether the safety ratio is 1.6 or 1.45. Instead, what matters for purposes of our analysis is whether the safety ratio is greater than one.
(Lacy Aff. ¶ 18.) While all safety ratios were reduced (in several cases by mere hundredths of points), only one segment no longer remained greater than 1.00 (the 7.87 mile segment of U.S. 311 between I-40 and N.C. 66), and one segment (the 5.46 mile segment of U.S. 158 between U.S. 421/1-40 and N.C. 66) rose from .42 to 1.3. (ROD at 65.) Defendants also submitted the declaration of Mr. Joseph Geigle, a traffic operations and safety engineer for FHWA, who opined that the errors in the SFEIS/FEIS that were corrected in the ROD were not considered to be significant by FHWA under NEPA and were disclosed and corrected in the ROD. 10 (Doc. 135.)
The record indicates, moreover, that FHWA in fact reviewed and considered these corrections to the SFEIS/FEIS before issuing the ROD, its formal agency action. The corrections were specifically discussed in the ROD, and a corrected Table 1-12 was presented. Immediately above the signature line of the ROD is a statement that FHWA independently evaluated the comments to the SFEIS/FEIS “along with revisions to the document.” (ROD at 92.) Thus, the final environmental impact statement was in fact prepared and considered (with corrections based in part on public comment) before the agency rendered its decision. The record therefore demonstrates that the agency took a hard look at the comments and made corrections to its analysis. The court cannot say that the corrections presented a “seriously different picture” of the environmental impact of the proposed project from that previously presented in the SFEIS/ FEIS. Consequently, the agency’s decision not to issue a supplemental environmental impact statement based on these corrections was not “a clear error in judgment” so as to render it arbitrary or capricious.
Marsh,
Plaintiffs’ argument as to the significance of the corrections is rebutted, moreover, by their own analysis. Plaintiffs contend that, despite Defendants’ corrections, the safety analysis remains incorrect. (Doc. 127 at 7.) In support of their claims, Plaintiffs submitted the declaration of David Robertson, P.E., a retired NCDOT employee. (Doc. 126, Ex. 3, Declaration of David W. Robertson, P.E. (“Robertson
Robertson’s analysis, if credited, results in the same number of segments having a safety ratio greater than 1.00 when compared to those in the SFEIS/FEIS. It also results in a nearly identical number of miles of roadway having a safety ratio greater than 1.00 (36.51 miles or approximately 43% of the studied roadway, compared to 38.92 or 46% of the studied roadway in the SFEIS/FEIS). 12 Yet, as Defendants point out, when Robertson’s analysis is compared to that in Table 1-12 in the ROD (which is what Plaintiffs’ briefing states Robertson meant to do), it represents the same number of, and the same particular, segments exceeding 1.00 that are noted in the ROD. 13 As a result, and even more to the point, Robertson calculates the exact number of miles of roadway with a safety ratio exceeding 1.00 that the ROD reflects: a total of 43% of the studied roadway. It is therefore hard to understand how Robertson’s proposed Table 1-12 results in a seriously different picture of the project’s environmental impact from a safety analysis standpoint.
Defendants, moreover, defend their use of a 95% confidence level for this analysis based on NCDOT’s “engineering judgment.” (Lacy Aff. ¶ 11.) Acknowledging that a 99.95% confidence level is commonly used for urban areas in general (and a 95% level for rural areas), NCDOT’s engineer Lacy states that NCDOT “typically” uses a probability value for a 95% confidence level because “using the 99.95% confidence level would imply greater precision than we can likely expect in screening for high accident locations.”
(Id.)
Lacy testified further: “While our results when using the 99.95% confidence level could be considered correct from a mathematical or statistical perspective, the amount of engineering judgment that should be applied, the use of estimated exposure values, and the intent of our application of critical crash
“Agencies are entitled to select their own methodology as long as that methodology is reasonable.”
Hughes River/Johnson,
During oral argument, Plaintiffs raised arguments not made in the briefing to attack the SFEIS/FEIS. Raising such new arguments for the first time at oral argument undermines the purpose of orderly briefing and risks subjecting an opponent to an unfair disadvantage. It is odd, moreover, that Plaintiffs devoted such time and energy to having their expert, Mr. Robertson, analyze the various road segments in his proffered version of Table 1-12 only to shift the emphasis of their attack. None of these other arguments, however, saves Plaintiffs’ claims.
Plaintiffs argue that the SFEIS/FEIS was misleading because its analysis was “meaningless.” First, they contend that the ROD admits that two of the U.S. 52 segments in the Table 1-12 analysis, which showed a safety ratio greater than 1.00, were made safer by a specific safety improvement, project U-2826B.
(See
ROD at 54; SFEIS/FEIS, vol. 1 at 2-5 to 2-6.) This cast doubt, Plaintiffs claim, on the ROD’s conclusion that these two segments were unsafe. Plaintiffs originally made this argument during the comment period. (ROD at 54.) It lacks merit, as Defendants determined, because the SFEIS/ FEIS clearly noted that project U-2826B was slated to widen and upgrade the U.S. 52 roadway and interchanges between 1-40 and the Northern Beltway interchange.
(Id.;
SFEIS/FEIS, vol. 1 at 1-23.) The ROD noted Plaintiffs’ objection and explained that the improvements “address short-term safety and operations issues only” and that the “Northern Beltway is relevant regarding safety improvements because it will provide a safer option for travelers.” (ROD at 54.) In reality, Plaintiffs’ objections do not undermine the agencies’ calculation of a safety ratio for the U.S. 52 segments (based on historical figures) but rather challenge the weight it contends the agencies should give the calculation on a going forward basis in light of planned improvements. The agencies’ judgment is entitled to deference, and this court will not second-guess it.
Moore-force, Inc. v. U.S. Dep’t of Transp.,
Finally, Plaintiffs point to the SFEIS/ FEIS statement that a purpose of the project was to enhance safety, which provided:
The Northern Beltway would provide a higher level of safety to traffic that would be diverted from U.S. 52 and NC 66y [sic] to the Beltway because of its design as a modern Interstate facility. With the Beltway, the accident rate in the eastern study area in 2025 is projected to decrease 11 to 17 percent (whether average or actual accident rates are used to calculate accident rates).
(SFEIS/FEIS, vol. 1 at 1-11 (emphasis added).) Plaintiffs argue that the second sentence is misleading because it was revised in the ROD to eliminate any prediction of any quantifiable increase of safety, and was replaced with the following:
Modern interstate-standard facilities are the safest facility NCDOT can provide to the public. These facilities have the highest design-standards to minimize the potential for crashes, and built-in protections to lessen the severity of crashes that do occur. The Eastern Section of the Beltway (a modern interstate-standard facility) would provide the motoring public a safer choice than many of the existing routes available today.
(ROD at 63-64.) The ROD explains that “[although a 2025 projected accident analysis was included in the SFEIS/FEIS, it was determined by NCDOT not to be a valid analysis, and was removed from the SFEIS/FEIS (as discussed further in Section 2.10.5).” (ROD at 63.)
Plaintiffs argue that the ROD’s elimination of the reference to an 11 to 17 percent reduction in the accident rate and the admission that the 2025 projected accident analysis was not valid demonstrates that the safety analysis presented is seriously different from that contained in the
In sum, considering all Plaintiffs’ arguments, the court concludes that Defendants did not violate NEPA with respect to their treatment of the safety analysis. The ROD reflects that the agency took a hard look at the corrected safety ratio analysis and reasonably concluded that the proposed project was not significantly affected by it.
2. Equitable Considerations
This conclusion is consistent with an analysis of the equitable considerations involved. Rule 60(b)(5) also permits relief from a prospective injunction where “applying it prospectively is no longer equitable.” The Fourth Circuit has explained that when considering this remedial provision, “a district court’s task is to determine whether it remains equitable for the judgment at issue to apply prospectively and, if not, to relieve the parties of some or all of the burdens of that judgment on ‘such terms as are just.’ ”
Alexander v. Britt,
In summary, upon review of the merits of Plaintiffs’ NEPA challenge to the SFEIS/FEIS and ROD, and balancing the policies of finality of judgments and of justice, the court concludes that Defendants’ motion to dissolve the injunction within the 1999 Order of Dismissal should be granted because Defendants have complied with its terms and continued application would no longer be equitable.
B. Case l:08cv570: NEPA Challenges
In case l:08cv570, Plaintiffs challenge the SFEIS/FEIS on two grounds. (See Doc. 21.) First, they contend that Defendants violated NEPA by not considering the effect the Northern Beltway would have on global climate change through the production of greenhouse gases. Second, they contend that Defendants failed to account for thg impact of two future, proposed connecting road construction projects, the Southern Loop and Airport Connector, not contained in the current project. Each is addressed below.
Because claims brought under the APA are adjudicated on the basis of an existing administrative record, they are properly decided on summary judgment.
Citizens for the Scenic Severn River Bridge, Inc. v. Skinner,
Before reaching the merits, a preliminary matter must be resolved: Defendants’ motion to strike appendices Plaintiffs filed to supplement the record. 14
Federal Defendants move to strike several documents Plaintiffs attached to their motion for summary judgment and reply brief, specifically appendices 1, 5, 8, 9, 13, and 16 through 22. (Doc. 41 at 1-2.) Federal Defendants contend that Plaintiffs have not demonstrated that the extra-record documents fall within any exception to the record review rule. Though conceding that the APA generally limits judicial review to the administrative record, Plaintiffs contend that extra-record evidence should be considered in this case for three reasons: (1) to demonstrate that the agency failed to consider factors relevant to its final decision, (2) the case is complex and involves technical issues, and (3) there was evidence arising after the final agency action demonstrating that the decision is erroneous. These factors are especially applicable, Plaintiffs argue, in NEPA cases, where the issue is whether the agency properly considered all relevant factors. (Doc. 35 at 13.)
Under the APA, “the focal point for judicial review should be the administrative record already in existence, not some new record made initially in the reviewing court.”
Camp v. Pitts,
In addition, the Fourth Circuit has “acknowledged] the importance of extra-record evidence in NEPA cases to inform the court about environmental factors that the agency may not have considered.”
Ohio Valley Envtl. Coalition,
Plaintiffs’ appendix 1 is a fact sheet from the EPA entitled “Greenhouse Gas Emissions from a Typical Passenger Vehicle.” Plaintiffs contend this fact sheet provides a simple formula for quantifying increased greenhouse gas emissions based upon vehicle miles traveled that should have been used in the SFEIS/FEIS. According to Plaintiffs’ argument, because the SFEIS/FEIS evaluated vehicle miles traveled for the Northern Beltway but faded to apply this formula, all relevant factors were not considered. Federal Defendants argue that, because the broader decision not to evaluate greenhouse gases was reasonable, there was no need to consult such data. Because Plaintiffs allege that Defendants failed to consider all relevant factors in arriving at its decision not to evaluate greenhouse gases, the court will consider this document, and Federal Defendants’ motion to strike will be denied.
The remaining challenged appendices all involve the proposed Airport Connector. 15 Plaintiffs argue that these documents show that the Airport Connector is reasonably foreseeable so that the SFEIS/ FEIS should have considered its cumulative impact. (Doc. 35 at 8.) Plaintiffs further allege that the challenged appendices “show a carefully orchestrated effort by NCDOT” to add the Airport Connector to the state TIP and fund it through the North Carolina Turnpike Authority (“NCTA”), thus circumventing any need to analyze its impact in the SFEIS/FEIS. (Id. at 9.)
The court finds that, although there appears to be some duplication between the challenged appendices and record evidence
(compare
app. 12 (recording the minutes and vote at a June 15, 2005, NCTA meeting to study the Airport Connector as a toll road)
with
app. 13 (acknowledging the June 15, 2005, NCTA vote)), these documents will be considered in support of Plaintiffs’ claim that the impact of the
Plaintiffs also seek, however, to have the court draw inferences from statements of those in attendance at various meetings reflected in the appendices and from the omission of these documents (which Defendants assert they did not rely upon) to conclude that, despite Defendants’ representations, Defendants were engaged in a coordinated effort to secure funding for the Arport Connector in the near future and therefore omitted the project from the SFEIS/FEIS solely out of concern that its inclusion would delay approval of the Northern Beltway. To the extent Plaintiffs seek to argue a bad faith exception to the record evidence rule, the court finds these documents inadequate for that purpose.
See Overton Park,
For the above reasons, therefore, Defendants’ motion to strike Plaintiffs’ extra-record appendices will be denied.
2. Omission of Analysis of Greenhouse Gas Contribution to Global Climate Change
Plaintiffs seek summary judgment on their claim that Defendants’ failure to evaluate greenhouse gas emissions in the SFEIS/FEIS violated NEPA’s requirement that the agencies evaluate indirect effects and cumulative impacts of the proposed action. (Doc. 21 at 11-14.) Plaintiffs argue that merely because greenhouse gas emissions may affect global climate change only slightly does not abrogate the agencies’ requirement to evaluate it as an unknown or uncertain impact under Council on Environmental Quality (“CEQ”) regulations. (Doc. 21 at 11.) Moreover, Plaintiffs argue, the SFEIS/FEIS concludes that the Northern Beltway, when viewed with other projects, will increase vehicle miles traveled in Forsyth County and will result in an increased release of greenhouse gases. Finally, Plaintiffs cite to proposed EPA reporting regulations for businesses and an analysis for vehicle greenhouse gas emissions contained in the EPA’s “Greenhouse Gas Emissions from a Typical Passenger Vehicle” in appendix 1. Employing such analyses, Plaintiffs contend, “would have allowed the decision-maker and the public to understand the correlation between new highway construction and the problem of global climate change.” (Doc. 39 at 7.)
State and Federal Defendants have filed cross-motions for summary judgment. State Defendants assert that summary judgment is appropriate because greenhouse gas evaluation is not mandated by NEPA, ah- quality review agencies were consulted in order to determine the scope of review for the project, and public comment regarding the omission of greenhouse gas analysis was adequately addressed. (Doc. 28 at 29-36.) Federal De
Under NEPA, Defendants had an obligation to take a “hard look” at “any adverse environmental effects” of the project. 42 U.S.C. § 4332(2)(C). The CEQ regulations explain that these include “indirect effects,” which are those that “are caused by the action and are later in time or farther removed in distance, but are still reasonably foreseeable.” 40 C.F.R. § 1508.8.
16
An agency can satisfy this duty by obtaining and considering opinions from its own experts and others, and by giving careful scientific scrutiny to and responding to all legitimate concerns raised.
Hughes River/Johnson,
“[IJnherent in NEPA and its implementing regulations is a ‘rule of reason,’ which ensures that agencies determine whether and to what extent to prepare an EIS based on the usefulness of any potential new information to the decisionmaking process.”
Dep’t of Transp. v. Pub. Citizen,
The SFEIS/FEIS devotes approximately twenty pages to analysis of air quality issues. (SFEIS/FEIS, vol. 1, at 3-50 to 3-53, 4-85 to 4-102.) Here, Defendants involved EPA, the North Carolina Division of Air Quality, and the Forsyth County Environmental Affairs Department in the initial scoping of the NEPA process. (SFEIS/FEIS, vol. 3, app. D, sec. 6; AR
The SFEIS/FEIS also concluded that the Northern Beltway complies with the Clean Air Act’s requirement that the project conform to the approved State Implementation Plan (an EPA-approved plan for complying with federal law and mitigating air quality impacts). See 40 C.F.R. §§ 51.854, 51.858 to 51.860. As noted in the SFEIS/FEIS, this conformity is “intended to ensure that a state does not undertake federally funded or approved transportation projects, programs, or plans that are inconsistent with the state’s obligations to meet and maintain the NAAQS.” (SFEIS/FIES vol. 1 at 4-93.) Thus, even with the potential additional vehicle miles traveled, the levels of these six pollutants will be less than the caps set in the state implementation plan. (Id. at 4-94 to 4-102.)
During the public comment period, Plaintiffs submitted comments to the SFEIS/FEIS (see ROD app. C), contending that vehicle miles traveled from the Northern Beltway would increase up to seven percent and cause a detrimental effect on global warming. FHWA responded in the ROD as follows:
From a policy standpoint, FHWA’s current approach on the issue of global warming is as follows. To date, no national standards have been established regarding greenhouse gases, nor has EPA established criteria or thresholds for greenhouse gas emissions. On April 2, 2007, the Supreme Court issued a decision in Massachusetts et al. v. Environmental Protection Agency et al. that the USEPA does have authority under the Clean Air Act to establish motor vehicle emissions standards for C02 emissions. The USEPA is currently determining the implications to national policies and programs as a result of the Supreme Court decision. However, the Court’s decision did not have any direct implications on requirements for developing transportation projects.
FHWA does not believe it is informative at this point to consider greenhouse gas emissions in an Environmental Impact Statement (EIS). The climate impacts of C02 are global in nature. Analyzing how alternatives evaluated in an EIS might vary in their relatively small contribution to a global problems [sic] will not better inform decisions. Further, due to the interactions between elements of the transportation system as a whole, emissions analyses would be less informative than ones conducted at regional, state, or national levels. Because of these concerns, FHWA concludes that we cannot usefully evaluate C02 emission in this SFEIS/FEIS inthe same way that we address other vehicle emissions.
(ROD at 57.)
NEPA requires an analysis of air quality.
See
40 C.F.R. §§ 1502.16, 1508.8(b). However, it does not expressly refer to climate change or greenhouse gas emissions. Nor are Plaintiffs able to identify any case holding that NEPA requires analysis of the potential impact of greenhouse gas emissions on overall global climate change in connection with a proposed highway project. Plaintiffs rely, rather, on
Massachusetts v. EPA,
These two cases are readily distinguishable and cannot be read to impose a duty on Defendants to consider the potential contribution a federal highway project may have to global climate change. Plaintiffs’ challenge is more like that raised in
Audubon Naturalist Society of The Central Atlantic States, Inc. v. U.S. Department of Transportation,
Plaintiffs also point to the 2005 EPA fact sheet submitted as appendix 1, which sets forth a formula for calculating greenhouse gas emissions for passenger vehicles. However, EPA was consulted during the scoping of the project and allowed to comment upon the SFEIS/FEIS.
(See, e.g.,
ROD app. C.) Under NEPA, EPA is the agency charged with determining whether a federal activity will adversely impact the “public health or welfare or environmental quality.” 40 C.F.R. 1504.1(b). At no time, however, did EPA suggest the need to study greenhouse gases. Additionally, it is not reasonable to expect Defendants to be on notice of the 2005 EPA document, especially where Plaintiffs themselves were unaware of it and did not present it during the comment review period.
Cf. Linemaster Switch Corp. v. EPA
Plaintiffs also contend that the SFEIS/FEIS projects that the Northern Beltway will increase vehicle miles traveled by 1.8 percent (218,000 miles traveled countywide daily) which, they argue, will increase greenhouse gas emissions. However, as Defendants point out, the increase in induced travel (defined as increased vehicle traffic due to increased roadway capacity) by the Northern Beltway alone is 1.05 percent; the 1.8 percent figure relied on by Plaintiffs encompasses the expected increase in induced travel from all reasonably foreseeable projects in the study area by 2025. (SFEIS/FEIS, vol. 1, at 4-243.) Defendants also note that Plaintiffs’ argument is based solely on vehicle miles traveled and fails to consider other important variables, including increased speeds on the Northern Beltway, improved vehicle fuel economy, and the use of cleaner fuels. Citing to the FHWA’s Spreadsheet Model Induced Travel Estimation (known also as “SMITE”) models, the SFEIS/FEIS shows that the increase in vehicle miles traveled will largely be absorbed by the new freeway components and shifting vehi
Based on the above, the court concludes that Defendants reasonably considered the major environmental consequences of the Northern Beltway and have provided a rational basis for their decision not to quantitatively analyze the potential effect greenhouse gas emissions may have on global climate change.
See Hughes River/Johnson,
3. Omission of Southern Loop & Airport Connector from the SFEIS/FEIS
Plaintiffs allege that two road projects, the Southern Loop and the Airport Connector, should have been considered in the SFEIS/FEIS. Plaintiffs argue that both projects are cumulative actions that should be analyzed pursuant to 40 C.F.R. § 1508.25. Alternatively, Plaintiffs contend that both projects are reasonably foreseeable and thus should be acknowledged and analyzed pursuant to 40 C.F.R. § 1508.7. Defendants argue that both projects are too indefinite to constitute a proposal and consequently there is no obligation to assess their impact on the environment as a cumulative action. Defendants also contend that neither project is reasonably foreseeable because neither is funded, developed or imminent. (Doc. 31 at 35; Doc. 28 at 43.)
CEQ regulations provide that “[cjumulative actions, which when viewed with other proposed actions have cumulatively significant impacts,” should be discussed in the same environmental impact statement. 40 C.F.R. § 1508.25(a)(2). An action is not required to be considered within a single environmental impact statement, however, unless it is sufficiently definite to constitute a “proposal.”
Kleppe v. Sierra Club,
As noted earlier, an agency must also consider the cumulative impact “which results from [the] incremental impact of the action when added to other past, present, and reasonably foreseeable future ac
In order to assess whether the effects of the Southern Loop and the Airport Connector should have been considered by Defendants, the different designations applied to highway projects and their associated ramifications must be considered. Generally, from the more visionary to the more specific, they are as follows:
• A statewide LRTP provides for development of an intermodal statewide transportation system over a minimum twenty year forecast period and may, but need not, contain a financial plan (i.e., documentation demonstrating consistency between reasonably available and projected sources of revenues and implementation costs). 23 U.S.C. § 135(f); 23 C.F.R. § 450.104.
• A Comprehensive Transportation Plan (“CTP”) — referred to as a Thoroughfare Plan during the timeframe of this case — is a vision for long range transportation systems that may include projects that are not included in a financially constrained plan or are anticipated to be needed beyond the horizon year required by federal law (23 U.S.C. § 134). See N.C. GemStat. § 136-66.2 (noting such a plan goes beyond twenty years); Doc. 27, Ex. 1, Declaration of Calvin Leggett, P.E. (“Leggett Deck”), ¶ 9 (noting name change).
• Metropolitan areas of a state, through duly designated policy boards, may develop an MPO LRTP to implement the goals of transportation planning. This type of plan contains a subset of CTP projects that may be funded twenty years or more in the future. 23 U.S.C. § 134(c). An MPO LRTP must include a financial plan but may include for illustrative purposes additional projects that would be included if reasonable additional resources beyond those identified were available. Id. § 134(i)(2)(C).
• Another type of highway planning is a TIP, which comes in two forms: statewide and metropolitan.
• A State Transportation Improvement Program (“STIP”) is a statewide prioritized list of projects that is consistent with the LRTP and metropolitan TIPs. 23 U.S.C. § 135(g); 23 C.F.R. § 450.104; N.C. Gen.Stat. § 143B-350(f)(4). A STIP is required for a project to be eligible for federal aid funding. 23 U.S.C. §§ 134-35; 23 C.F.R. § 450.104. However, a STIP does not require a financial plan but can list a project “only if full funding can reasonably be anticipated to be available for the project within the time period contemplated for completion of the project.” 23 U.S.C. § 135(g)(4)(E)-(F). A STIP covers a period of no less than four years but may cover more if authorized by state law, which North Carolina has extended to seven years. See 23 U.S.C. § 135(g)(1); 23 C.F.R. 450.216(a); N.C. Gen.Stat. § 143B-350(f)(4). Thus, to the extent a project is listed in a STIP covering more than four years, its listing inthe additional years is considered for informational purposes only. 23 C.F.R. § 450.216(a).
• A metropolitan TIP (“MTIP”) is a four-year financially constrained (meaning the project has committed, available or reasonably available revenue sources) list of projects that is federally approved, 23 U.S.C. § 134(j); Leggett Decl. ¶ 16, and that is a component of the STIP, 23 U.S.C. § 135(g)(4)(D)(ii). An MTIP must include a financial plan. 23 U.S.C. § 134(j)(2)(B). An MTIP can list a project only if full funding can reasonably be anticipated to be available within the four-year period contemplated; however, additional projects can be included for illustrative purposes if reasonable additional resources beyond those identified were available. 23 U.S.C. § 134(j)(2)(B) & (D). Additionally, a project may be listed beyond the four year period for illustrative purposes only. 23 C.F.R. § 450.324(a). A STIP and MTIP are therefore similar in purpose, with the major difference being in the geographic coverage of each program, and are governed by almost identical regulations.
With this background in mind, the court turns now to an examination of both road projects.
a. Southern Loop
The Southern Loop in concept would be a ten-mile, four-lane divided highway connecting U.S. 311 to South Stratford Road. (Winston-Salem/Forsyth County Urban Area Thoroughfare Plan, Technical Report, Feb. 28, 2002, AR 18829.) It is not identified as a contemplated urban loop project in the Highway Trust Fund Act, N.C. GemStat. § 136-180(a). 21 It was not part of the 2030 LRTP or the 2006-2012 STIP. (See SFEIS/FEIS, vol. 1 at 1-21 to 1-28, 6-85; id. vol. 2 at fig. 1-6; ROD at 51.) Consequently, the Southern Loop has no identified source of reasonably available funding. It appears only in the Winston-Salem 2005 Thoroughfare Plan/CTP as an unfunded, financially unconstrained project that may be funded twenty or more years in the future. (SFEIS/FEIS, vol. 2 at fig. 1-7; Leggett Decl. ¶ 10.)
Defendants provided the following responses to Plaintiffs’ comments that the SFEIS/FEIS should have considered the Southern Loop:
As stated in the response to Comment 100-2 in the SFEIS/FEIS, page 6-85: “The Southern Loop is not a funded project, is not in the TIP, and is not included in the 2030 Long Range Transportation Plan. Therefore, it is not a reasonably foreseeable project and is not included in this study.”
(ROD at 51.)
Plaintiffs point to the length of time that the Southern Loop has been discussed as an indication of the longevity, and implicitly the foreseeability, of the project such that it should have been included in the SFEIS/FEIS. (Doc. 21 at 19.) The length of time a project has been discussed, however, is not controlling. In fact, mere discussions even over a long period do not necessarily mean that a project has the funding or necessary studies performed such that a decision is fairly 'imminent. Plaintiffs seem to appreciate the weakness of their argument because their reply brief focuses solely on the fore
The court finds that the Southern Loop fails to constitute a proposal and cannot be deemed to be a cumulative action.
See Kleppe,
b. Airport Connector
The Airport Connector, also referred to as the I — 73/1—74 Connector, is contemplated as an east-west four-lane divided highway running from Winston-Salem (connecting to the Eastern Section of the Northern Beltway) to Greensboro in the vicinity of the Piedmont Triad International Airport. (SFEIS/FEIS, vol. 2 at fig. 1-6.) In contrast to the Southern Loop, it has been the subject of further activity. The project is included in the Winston-Salem Thoroughfare Plan/CTP, the Winston-Salem 2030 LRTP, the 2006-2012 STIP, and the Winston-Salem and Greensboro MTIPs. In addition, the N.C. Board of Transportation identified the project as a “strategic corridor” in the Strategic Highway Corridor Vision Plan, the state’s official map adopted by the N.C. Board of Transportation to identify corridors for long-term potential to serve passengers and freight movement. (Leggett Decl. ¶ 15; Doc. 39, app. 19.) Finally, the Northern Beltway is also being configured to accommodate a potential interchange with the Airport Connector, should the project ever materialize. Each of these potential indicators of foreseeability and/or proposed action will be considered.
Defendants provided the following responses to Plaintiffs’ comments that the Airport Connector should have been considered in the SFEIS/FEIS:
The portion of the I-73/I-74 Connector (also known as the Airport Connector) from the Winston-Salem Northern Beltway to the Forsyth County/Guilford County line is estimated at $76 million in the Winston-Salem Urban Area 2030 Long Range Transportation Plan (LRTP), and is designated as a Turnpike Authority project. The $76 million would have to be provided by toll revenues since no state, Federal, or local funds have been identified for the project. The Turnpike Authority is not currently studying the I-73/I-74 Connector. It is not funded in the 2007-2013 TIP. 22 It is not a reasonably foreseeable project.
(ROD at 51.)
The project’s inclusion in the Winston-Salem Thoroughfare Plan/CTP and Winston-Salem and Greensboro MPO LRTPs are not argued as strong indicators of foreseeability. These are essentially visionary documents and require no source of funding where a project is listed for illustrative purposes. N.C. Gen.Stat. § 136-66.2; 23 U.S.C. § 134(i)(2)(C). The same is true of the project’s listing as a “strategic corridor,” as that plan is not financially constrained. (Leggett Decl. ¶ 15.)
Plaintiffs point to a June 15, 2005, meeting of the North Carolina Turnpike Authority (“NCTA”), which voted to perform a preliminary study of the Airport Connector “for feasibility purposes” as a potential turnpike project. (Doc. 39, app. 7.) Plaintiffs note that the NCDOT Secretary presided over the NCTA meeting when the vote to study funding occurred.
(Id.)
In a
Plaintiffs argue that inclusion in the 2006-2012 STIP and in the Winston-Salem and Greensboro MTIPs indicates its foreseeability such that it should have been included in the SFEIS/FEIS. (Doc. 21 at 19.) As Federal Defendants note, however, the project was listed in the STIP as “Programmed for Planning and Environmental Study Only by the Turnpike Authority.” (Doc. 39, app. 12; SFEIS/FEIS, vol. 1 at 1-22, 6-110.) This listing, they argue, “in no way leads to the conclusion that further development of the project would be funded so as to make the Airport Connector reasonably foreseeable.” (Doc. 31 at 40.) Indeed, where, as here, state law permits a listing in a STIP of a project beyond four years, N.C. Gen.Stat. § 143B-350(f)(4), its listing (for this limited purpose) is by regulation for illustrative or informational purposes only. 23 U.S.C. § 135(g)(4)(F). Accordingly, FHWA is not required to select any project, such as the Airport Connector, from the illustrative list. 23 U.S.C. § 135(g) (4)(G) (i).
The Winston-Salem MTIP and the Greensboro MTIP also list the Airport Connector as “programmed for planning and environmental study only.” (Doc. 39, app. 15, 17.) Here, too, the listing as a project in an MTIP for this limited purpose, thus meaning it is unfunded for construction and will not be completed within the four-year planning period, renders it an illustrative listing only. 23 U.S.C. § 134Cj)(2)(B) & (D); 23 C.F.R. § 450.324(a). Thus, the Airport Connector is not listed in the STIP or MTIPs as a financially constrained project.
Plaintiffs point further to several comments of Pat Ivey (“Ivey”), engineer for NCDOT, to argue that Defendants intend to move forward with the project. For example, in a meeting with the Town of Kernersville (which lies between the Northern Beltway and the Piedmont Triad International Airport) Ivey discussed the potential Airport Connector and commented that it may be possible to address the project “as a supplement” to the SFEIS/FEIS if the Airport Connector were ever funded. (Doc. 39, app. 4.) Plaintiffs seize on the Kernersville meeting agenda that stated that “[a] future interchange location should be considered now as part of this Beltway EIS document.” (Doc. 39, app. 5.) However, in 2005 Ivey is reported to have stated that “any additions or deletions at this point would cause significant delays” and urged that connectivity concerns be addressed in the future with a supplemental resolution. (Doc. 39, app. 6.) The court finds that none of these statements indicates that the project is imminent or constitutes a proposal.
Plaintiffs rely upon
Western North Carolina Alliance v. N.C. Department of Transportation,
The court finds that the listing of the Airport Connector in the various transportation plans does not make it reasonably foreseeable or rise to the level of a proposal for purposes of inclusion in the SFEIS/FEIS for the Northern Beltway. The project has received no source of funding for construction in any plan in which it is listed. Though a feasibility/environmental study has been approved for the project, it is not even currently funded. Nor is the project listed in the Highway Trust Fund Act, N.C. Gen.Stat. § 136-180. Though it is listed in the Winston-Salem and Greensboro MTIPs and the STIP, its listing is by regulation for informational purposes only. Thus, the Airport Connector has many hurdles to leap before the requisite agencies will be making any decision regarding its ultimate development. As such, insufficient information exists as to its development that would permit decisionmakers to evaluate meaningfully its effects. See 40 C.F.R. § 1508.23.
Finally, Plaintiffs point to the fact that an interchange of the Northern Beltway has been configured to accommodate the Airport Connector in the event it is ever approved and constructed. 23 (Doc. 21 at 20-21.) The record reflects that when authorizing the Northern Beltway, however, FHWA declined to include an interchange because it concluded that the Airport Connector was too speculative. (SFEIS/FEIS, vol. 1 at 6-110.) That the agency left spacing for an interchange should the Airport Connector be funded and developed indicates merely smart design to avoid unnecessary rework if funding is ever authorized and the project materializes beyond the preliminary incubation stage. (Id.)
The court cannot say that the Airport Connector is sufficiently likely to occur such that Defendants should have taken it into account in reaching their decision.
See Marsh,
4. Plaintiffs’ “Preservation” of Challenge to the Order of Dismissal
Finally, Plaintiffs seek in their reply brief to “preserve” their challenge to the Order of Dismissal in case l:99cvl34 by adopting their arguments from their briefing therein (Doc. 127 (case l:99cvl34)). (Doc. 39 at 23-24.) As Defendants rightly pointed out at oral argument, Plaintiffs never raised these issues in their complaint in case l:08cv570, and thus there is no argument to “preserve” in this case. To the extent Plaintiffs seek to
III. CONCLUSION
For the foregoing reasons,
IT IS THEREFORE ORDERED as follows:
1. In case l:99evl34, Federal and State Defendants’ joint motion to dissolve the injunctive provisions of the Order of Dismissal (Doc. 122) is GRANTED, and the action is DISMISSED with prejudice.
2. In case l:08cv570, Federal Defendants’ motion to strike (Doc. 32) is DENIED. No genuine issue of material fact exists and judgment should be entered for Defendants as a matter of law. Therefore, Plaintiffs’ motion for summary judgment (Doc. 19) is DENIED, and Federal and State Defendants’ cross-motions for summary judgment (Docs. 27 & 30) are GRANTED. Case l:08ev570 shall be DISMISSED with prejudice.
A Judgment in accordance with this Order will be filed contemporaneously in each case.
Notes
. Unless otherwise noted, all citations to docket filings refer to the case discussed in the immediately preceding text.
. Ray LaHood became Secretary of USDOT on January 23, 2009, and is substituted for Rodney Slater in case l:99cvl34 and for Mary E. Peters in case l:08cv570. Victor Mendez became Administrator of FHWA on July 17, 2009, and is substituted for Kenneth R. Wykle in case l:99cvl34 and for James Ray in case 1:08cv570. John F. Sullivan, III, is currently the Division Administrator of FHWA and is substituted for Nicholas L. Graf in case l:99cvl34 and for Don Voelker in case l:08cv570. Eugene A. Conti, Jr., is the current Secretary of NCDOT and is substituted for E. Norris Tolson in case l:99cvl34 and for Lyndo Tippett in case l:08cv570. Fed. R.Civ.P. 25(d).
. State Defendants further argue that the Eleventh Amendment immunizes them from suit as to Plaintiffs' NCEPA claims. However, at oral argument on March 26, 2010, on the present motions, Plaintiffs withdrew their NCEPA claims against State Defendants, noting they have a parallel NCEPA lawsuit against State Defendants pending in state court and that their NCEPA claims were either largely duplicative of, or subsumed by, their NEPA claims. Thus, State Defendants’ Eleventh Amendment argument is moot.
. An environmental impact statement (sometimes referred to as an EIS) is “a detailed written statement as required by section 102(2)(C) of NEPA.” See 40 C.F.R. § 1508.11. NEPA requires the preparation of an environmental impact statement for any "major Federal actions significantly affecting the quality of the human environment.” 42 U.S.C. § 4332(2)(C).
.A record of decision is a "concise public record” which must (1) slate what the agency decision was; (2) identify all alternatives considered by the agency in reaching its decision; and (3) state whether all practicable means to avoid or minimize environmental harm from the alternative selected have been adopted. 40 C.F.R. § 1505.2. Under federal regulations, the record of decision may not be approved until at least thirty (30) days after publication of notice in the Federal Register of the filing of a final environmental impact statement with the Environmental Protection Agency. 40 C.F.R. § 1506.10(b)(2); 23 C.F.R. § 771.127(a). This thirty day period allows the public and other agencies to comment on the FEIS prior to agency approval of the proposed project. The issuance of a ROD represents final agency action on a project and equates to approval of the FEIS for the project.
. Although the court found that Plaintiffs met the state substantive law requirements for fees against State Defendants, it left for another day whether the Eleventh Amendment barred any award in the federal action. Id. at 700.
. The SFEIS/FEIS is found in the Administrative Record ("AR”) at 27419 through 29179. For ease of reference, the court will cite to the SFEIS/FEIS and its internal numbering wherever possible.
. The 2008 ROD is found at AR 29811 through 29978. Hereafter, too, the court will cite to the 2008 ROD and its internal numbering wherever possible.
. Though Defendants cite to seven road segments in the SFEIS/FEIS with a safety ratio greater than 1.00 (Doc. 134 ¶ 19), they erroneously include one segment of U.S. 311 (from N.C. 66 to Williston Road) that has a safety ratio of exactly 1.00. (SFEIS/FEIS, vol. 1 at 1-46.) Because this segment is only 1.01 miles long, its inclusion or exclusion would not appear to materially affect the outcome of the analysis.
. While the decision of significance under NEPA is ultimately for the court and not FHWA, it is noteworthy that Mr. Lacy represents that the mistakes in the SFEIS/FEIS Table 1-12 were ''innocent errors” (Lacy Aff. ¶ 21) and that no one has suggested that they were purposeful.
Cf. N.C. Alliance,
. It is not clear whether Robertson’s corrected safely ratio for one of the six segments (N.C. 66 between Hopkins Road and U.S. 421/1-40 Business) demonstrates a statistically significant result insofar as no confidence interval is noted for it. (See Robertson Decl. attach.)
. Robertson’s analysis would reduce to 32.54 miles or 38.4% of the studied roadway if his corrected safety ratio for the segment of N.C. 66 between Hopkins Road and U.S. 421/1-40 Business is determined not to be statistically significant.
.The safety ratios for three of the six segments remain unchanged (U.S. 58 between U.S. 421/1-40 Business and N.C. 66, N.C. 66 between U.S. 421/1-40 Business and U.S. 311, and N.C. 66 Connector to Hopkins Road), and the remaining three change marginally (a U.S. 52 segment falls from 1.49 to 1.36, another U.S. 52 segment falls from 1.58 to 1.46, and a N.C. 66 segment falls from 1.18 to 1.07). (Compare Robertson Decl. attach, with ROD at 65.)
. Plaintiffs have asserted that no material issue exists as to their standing to maintain the current lawsuit and included thirteen declarations from association members recounting the harm the Northern Beltway would
To demonstrate standing, a party must have an injury-in-fact that is fairly traceable to the defendant's conduct and likely to be redressed by a favorable decision.
Lujan v. Defenders of Wildlife,
. The remaining challenged appendices are as follows: (5) September 22, 2004, vision plan map for NCDOT’s Strategic Highway Corridors initiative; (8) January 27, 2005, minutes of the Winston-Salem MPO Transportation Advisory Committee ("TAC”); (9) June 15, 2005, minutes of the North Carolina Turnpike Authority; (13) July 21, 2005, minutes of the Winston-Salem TAC; (16) November 3, 2005, list of revisions to the 2006-2012 TIP showing the Airport Connector; (17) September 2004 NCDOT Long Range Plan; (18) September 2, 2004, press announcement of Gov. Michael Easley noting approval of 25-year state plan; (19) January 4, 2007, Winston-Salem 2007-2013 MPO TIP noting Airport Connector as unfunded; (19A) August 21, 2008, Winston-Salem MPO TIP for 2009-2015 noting the Airport Connector as "programmed for planning and environmental study only, future North Carolina Turnpike Project”; (20) March 1, 2007, Greensboro Urban Area MPO noting the Airport Connector as "programmed for planning and environmental study only”; (21) 2030 Winston-Salem Urban Area Long Range Transportation Plan noting that the "2020 network includes all of the existing major streets and highways, and the recommended and widened roads that will be completed from 2015 through 2020”; and (22) Table 3.13 of the Greensboro Urban Area 2030 Long Range Transportation Plan noting "2021-2030 noteworthy projects include ... the Airport Connector.” (Doc. 39, appendices.)
. The CEQ regulations define "indirect effects” as follows:
Indirect effects, which are caused by the action and are later in time or farther removed in distance, but are still reasonably foreseeable. Indirect effects may include growth inducing effects and other effects related to induced changes in the pattern of land use, population density or growth rate, and related effects on air and water and other natural systems, including ecosystems.
40 C.F.R. § 1508.8(b). "Effects and impacts as used in these regulations are synonymous." Id.
. The CEQ regulations define "cumulative impact” as follows:
Cumulative impact is the impact on the environment which results from the incremental impact of the action when added to other past, present, and reasonably foreseeable future actions regardless of what agency (Federal or non-Federal) or person undertakes such other actions. Cumulative impacts can result from individually minor but collectively significant actions taking place over a period of time.
40 C.F.R. § 1508.7.
. The NAAQS standards do not regulate any of the greenhouse gases.
. Defendants do not appear to directly challenge the existence of a relationship between the production of greenhouse gases and global climate change, relying rather on their other arguments. The court need not and does not decide, therefore, whether Plaintiffs have created an adequate
factual
record in support of its claim, although it appears doubtful that they have. Plaintiffs conceded at oral argument that they provided no scientific documentation of the claim during the administrative process and seek to rely solely on the factual conclusions as set forth in
Massachusetts v. EPA
and
Center for Biological Diversity
as factual proof in this case. Permitting parties to circumvent the administrative process in this fashion by arguing that facts have been established against the government through prior litigation against it would appear improper.
See United States v. Mendoza,
. Plaintiffs argue that
Audubon Naturalist
is distinguishable because there the court lacked record evidence, present here, that the project
.
In this respect, the Southern Loop differs from the Western Section and Eastern Section of the Northern Beltway and this court's prior analysis of those Sections as segments constituting cumulative actions that required consideration as a single project.
N.C. Alliance,
. The 2007-2013 TIP contains identical treatment of the Airport connector as its predecessor document relied on by Defendants in the SFEIS/FEIS.
. Some of the very newspaper articles to which Plaintiffs point also indicate that the Airport Connector is years from fruition. (See, e.g., AR 24949 (noting that the Airport Connector "must undergo years of studies examining issues such as its route, environmental concerns, the amount of people who would use the road and whether tolls could adequately pay for the project”).)