31 N.J. 254 | N.J. | 1959
The opinion of the court was delivered by
On application of the County of Bergen, the Board of Public Utility Commissioners ordered the appellant, New York, Susquehanna and Western Railroad Com
River Road is a county road which runs through Edge-water from its northerly boundary at Eort Lee Borough to the Bergen-Hudson County line. Eor the purpose of avoiding a grade crossing and of creating an overpass for River Road, the bridge involved was constructed in 1894. It was reconstructed in 1917. In both instances, the railroad assumed the expense.
The bridge consists of three main steel trusses which carry a floor system of timber beams running crosswise on them. A series of longitudinal stringers are superimposed on the floor beams, running in the direction of the trusses. On top of the stringers is a timber deck with a wooden plank roadway 30 feet wide. There is an eight-foot wooden plank sidewalk on one side of the roadway. Signs are posted indicating a gross load capacity per vehicle of 12 tons. Substantial testimony was offered to establish that the signs fairly represent the capacity. The Board made no finding to the contrary. But the railroad concedes that 12 tons constitute the maximum vehicle and load capacity. The County conceded, however, that a number of county-constructed bridges over county roads are limited to and posted for from 10 to 15 tons.
There are a number of industrial plants in Edgewater, and particularly in the River Road area. South of the bridge are three divisions of Allied Chemical Corporation (Gypsum Board, Plastics & Chemicals, and Barrett), Eord Motor Co., Central Ereight Trucking Company, Lever Brothers, and Spencer Kellogg & Sons. To the north are Hill Bros. Coffee, Inc., Edgewater Oil Terminal, Aluminum Company of America, and Central Ereight Trucking Corporation. Principal arteries of truck transportation between Edgewater and outside areas are: to New York and points east: Lincoln Tunnel (south of the bridge) and George
A survey of traffic conditions on River Road (made in cloudy, rainy weather) indicated that between 8 a. m. and 6 p. m. the bridge was traversed by 2,966 vehicles, i. e., 2,254 automobiles, 618 trucks, and 78 ordinary common carrier type buses. Of course, each of these vehicles with its load weighed no more than 12 tons.
R. S. 48:12-49 provides:
“* * * Every railroad company * * * shall construct and keep in repair good and sufficient bridges and passages over, under and across the railroad * * * where any road * * * shall cross the same, so that public travel on the road is not impeded thereby. Said bridges and passages shall be of such width and character as shall be suitable to the locality in which they are situated.” (Emphasis added)
Bergen County, undoubtedly aware that the Motor Vehicle Act authorizes trucks up to 30 tons of vehicle and load to be operated on the highways of this State, N. J. S. A. 39:3-84, and probably motivated primarily by the existence of the large industrial plants in Edgewatgr, filed the complaint herein to require Susquehanna to increase the load-bearing maximum of this River Road bridge. The relief sought was an order directing “the necessary repairs and improvements * * * so that the condition thereof will be safe and convenient for public use and travel, and for all vehicles lawfully entitled to use the same.” Ho request was made in the complaint that the capacity be increased to any specific point between 13 tons and the 30-ton maximum permissible roadway limit. Hor is the directive of the Board of Public Utility Commissioners any more precise. Its mandate is to reconstruct or replace the bridge “in •order to adequately carry modern highway vehicular traffic.”
The brief of the County makes it plain, however, that its intent in applying to force such reconstruction is to •effect an increase of the weight-bearing capacity so as to permit use of the bridge by a vehicle of the legislatively authorized maximum load for public roads. The thesis is that when a railroad builds an overpass, an absolute burden
The legislation has been in effect for over 100 years. L. 1847, p. 133. Although from its earliest days the courts have recognized the duty laid on the railroad to be a continuing one, they have declared that it must be measured by the circumstances. Even though a bridge was adequate originally to satisfy conditions existing at the time of construction, changes may be ordered as the public exigencies require. If increase in population and business produces more and heavier traffic which renders it inadequate for the current needs, the railroad’s burden is to make such changes as are reasonably necessary for the public accommodation and safety. The Central R. R. Co. ads. The State, supra; Township of Baritan v. Port Beading R. R. Co., 49 N. J. Eq. 11, 15 (Ch. 1891); West Jersey & Seashore R. R. Co. v. Waterford Tp., 64 N. J. Eq. 663, 672 (Ch. 1903); Newark v. Erie Railroad Co., supra, 72 N. J. Eq., at page 453; N. J. Highway Authority v. Central R. Co. of N. J., 21 N. J. 157, 163—167 (1956). And see to the same effect in other jurisdictions: City of Olean v. Pennsylvania R. Co., 249 N. Y. 364, 164 N. E. 251 (Ct. App. 1928); City of Mt. Vernon v. New York, N. H. & H. R. Co.,
Aside from the type of vehicles desiring to use the bridge, in this kind of case the existence of another convenient and readily accessible route has been recognized in some areas in comparable situations as a factor to be considered. Yowell v. Cleveland, C., C. & St. L. Ry. Co., 360 Ill. 272, 195 N. E. 667 (Sup. Ct. 1935); Briden v. New York, N. H. & N. R. Co., supra. In the latter case, the Supreme Court of Rhode Island said [27 R. I. 569, 65 A. 318]:
“The fact that the bridge is not of sufficient strength to bear the weight of a road roller is not, in my opinion, enough to cast upon the respondent the duty of strengthening the bridge. The bridge is, according to the statement of facts, up to the standard of safety and convenience which the statute exacts of towns and cities, and I do not think the railroad is required to provide for this unusual weight, especially in view of the fact that a bridge of sufficient strength is located but a short distance away.”
And in Yowell where the effort was to compel the railroad to construct an additional grade crossing, the court found that the record did not sustain the order made by the Commerce Commission, saying [360 Ill. 272, 195 N. E. 669]:
“In its findings the Commerce Commission wholly failed to state any facts which would show why the respondent should construct the particular grade crossing to properly serve the public convenience and necessity. The findings made by the commission express mere conclusions not based upon any facts found by it, to the effect that, owing to the lack of crossings in the west portion of Gillespie, its residents are discommoded by being compelled to resort to a circuitous route to reach points on either side of the tracks, and that the proposed highway, when opened, will more conveniently serve them and also the community high school district. The order does not purport*263 to find that the general public interest requires the particular crossing. In every application of this kind the primary and controlling interest to be considered is the public interest. The convenience and necessity required to support an order of the commission are those of the public and not of the individual or a number of individuals. * * *
The petitioners argue, however, that the order discloses that the convenience and necessity of approximately half of the territory served by the community school of the city of Gillespie so affects, either actually or potentially, every family in the community, and that the convenience and necessity of students going to and from that school are of a public nature sufficient to sustain the order. The answer to this argument is that the order does not show the number of persons who would be affected or to whom advantages would accrue from the proposed crossing. Even if it be conceded that a considerable number of individuals might find it slightly more convenient if they were saved the walk of a few extra blocks to reach the existing crossing at Macoupin street or Jersey street, the concession cannot avail the petitioners, as this does not establish a ease of public convenience and necessity.”
As has been indicated, the quoted cases are not identical with that before ns. The statutes involved speak in more general terms than ours, which inveighs against bridges that impede public travel and are unsuitable to the locality. And although our act is construed reasonably but liberally in favor of the public, N. J. Highway Authority v. Central R. Co. of N. J., supra, 21 N. J., at page 165, elements of public use, convenience of use and need for use in the locality are proper subjects for consideration.
The proof adduced at the hearing before the Board demonstrates that the industrial plants referred to are served by trucks. Some of them were said to be large units, ranging in size from 30 to 50 feet in length. Their weight loaded or unloaded does not appear. Likewise, the record is vague as to whether they use River Road. The only pertinent testimony follows:
“Q. Well, tell us, Mr. Joseph, have you seen any truohs go up and down River Road or have you seen any trucks in the plants? A. Have I seen trucks?
Q. Yes. A. Yes, I have.” (Emphasis added)
The testimony reveals that'it would cost about $5,000 to bring the strength of the trusses up to a weight-bearing load of 15 tons, $45,000 to strengthen the bridge substantially above that limit, and $60,000 to rebuild it completely so as to support 20 tons. The County Engineer opined that the cost of providing for the carriage of 30-ton vehicles would be about $60,000.
The Board has wide discretion in dealing with problems such as the present one. Ordinarily the judiciary will not interfere with the determination made if it is supported by substantial evidence. In re Greenville Bus Co., 17 N. J. 131, 138 (1954); Hudson Bus Transp. Co. v. Board of Public Utility Com’rs., 131 N. J. L. 576 (Sup. Ct. 1944). But, as we have pointed out, the obligation to strengthen or rebuild the bridge is not an absolute one as the Board and the County seem to have felt at the hearing. It must appear that the structure provided by the railroad is no longer adequate to accommodate the needs of the public as those needs appear in the locality. Proof of a condition calling for relief and the specific nature of the relief is so lacking in this instance as to leave the directive to the railroad without legal support. This deficiency may well be chargeable to the theory pursued by the County, namely, that an absolute obligation exists to provide an overpass which, regardless of public need, will support vehicles of the maximum tonnage permitted on the highways of this State. Accordingly, in the interests of just and proper disposition, the matter must be remanded to the Board for the submission by the parties of such further evidence as they may desire in conformity with this opinion.
Reversed and remanded.
For reversal and remandment—Chief Justice Weintraub, and Justices Burling, Jacobs, Erancis, Proctor, Hall and Schettino—7.
For affirmance—None.