75 F. 162 | U.S. Circuit Court for the District of Southern Ohio | 1896
(after stating the facts as above). The demurrer was intended to present three points; First. That the statute upon which complainant relies does not apply to a street-railway company. Second. If it does apply, that the statute itself is unconstitutional and void. Third. That, even if the statute is valid and applies to street-railway companies, the recording of the lien was not perfected within the 30 days after the rendering of the
1.: The statute relied on is an act entitled “An. act to fix responsibility and to protect labor and the rights of contractors and subcontractors on all public works or work done for companies, corporations, contracting companies or individuals.” It was passed March 20, 1889, and is to be found in 86 Ohio Laws, p. 120. The first section of the act provides as follows:
“Sec. 1. Be it enacted by the general assembly of the state of Ohio, that any person who shall have performed common or mechanical labor upon, or furnished supplies to any railroad, turnpike, plank road, canal or on any public structure being erected, or on any abutment, pier, culvert or foundation for same, or for any side track, embankment, excavation or any public work, protection, ballasting, delivering or placing ties, or track-laying, whether the labor is performed for, or the supplies or material is furnished to any company, corporation, contractor or sub-contractor, construction company or individual, shall have a first, immediate and absolute lien on the whole of the property on which said work is done, and to which said supplies have been contributed, and shall hold the railroad, canal, turnpike, plank road or structure to the creation or construction of which the said labor or supplies has been contributed or so much thereof as may have been in whole or in part created by said labor or supplies, to the exclusion of any railroad, canal, turnpike, plank road, public work or structure, as to operation, occupation or use, until the claim for such labor or supplies is properly adjusted and paid in full.”
The contention is that the term “railroad,” as used in this section, refers to' commercial or traffic railroads, as distinguished from “street railways.” It is said that in the statutes of Ohio the usus loquendi requires that the term “railroad,” when used without qualification, should be held to mean commercial or traffic railroads, and not those which are used for passenger purposes upon the streets of cities and villages.
' ■ Part 2, tit. 2, of the Statutes of Ohio, is devoted to corporations. Chapter 2 of that title is devoted to railroad companies. ' By section 3309a, which was passed subsequent to the revision of the statutes on the 20th of March, 1884 (81 Ohio Laws, p. 57), there was a proviso as follows:
“That nothing in this section or in the sections of the Revised Statutes relating to railroad companies prior to section thirty-four hundred thirty-seven, .other than in sections thirty-two hundred and eighty-seven, thirty-two bun.dred and. eighty-eight, and thi-rty-two hundred and eighty-nine shall be construed as affecting street railroads.”
There is under the title “Railroad Companies” a subhead “Street Railways.” It may be that in sections properly within the chapter on railroad companies, and in amendments to those sections, there is a distinction made between railroad companies and street-railroad companies, and that, where the term “railroad” is used, the presumption is that it means a traffic railroad. We do not, however, have to decide this question.
The act here in controversy is not an amendment to any act in relation to railroad companies which would come properly within the purview of chapter 2, on railroad companies, in the Revised Statutes. This act of 1889 is properly inserted as an amendment to chapter 4, div. 2, tit. “Liens,” by the learned editors of Smith
In the case of Pennsylvania Steel Co. v. J. E. Potts Salt & Lumber Co., 22 U. S. App. 537, 11 C. C. A. 11, and 63 Fed. 11, the court of appeals of this circuit held that there was no authority for the faking of the lien on a railroad under a statute which provided a mechanic’s lien for the repairing or erection of any house, building, machinery, wharf, or structure. But in that case Judge Severens, who delivered the opinion of the court, referred to the cases in which “railroad” had not been included wfithin the general words of the mechanic’s lien statute and to those in which it had been so included. He refers to the case of Giant Powder Co. v. Oregon Pac. Ry. Co., 42
“He quotes and applies the maxim of construction, ‘Noscitur a soeiis,’ and from such application it appeared plainly that the words ‘or any other structure, * * * aqueduct,’ were intended to include structures of a similar character. It was by the application of the same maxim that the supreme court of Ohio, in the case before referred to [Rutherfoord v. Railroad Oo.'J, held that the word ‘structure,’ interpreted by reference to the more restricted words in their statute, did not include railroads. Indeed, it would seem that the application of this rule of construction has been quite generally decisive of the interpretation to be given to the general words in these statutes.”
See, also, Forbes v. Electric Co., 19 Or. 61, 23 Pac. 670; Helm v. Chapman, 66 Cal. 291, 5 Pac. 352; Central Trust Co. of New York v. Sheffield & B. Coal, Iron & Railway Co., 42 Fed. 106.
It is very clear to me that the narrowest construction of the stab ute in question would not exclude street-railway companies from its operation.
Reference is made, in support of the contention that the term “railroad” means “traffic railroad,” to section 3 and 4 of the act, which provide that the engineer in charge of the work shall furnish to any contractor or mechanic interested a full statement of the quantities’ in each class of work done or supplies or material furnished by the parties interested, and that the specifications of this section 4 are such as to show that the work contemplated is that of embankments and excavation, a character of work never done in the construction of street-railway companies. We do not think that this circumstance is controlling. The same construction would lead to the result that no work done on the plank road or a turnpike or a canal other than that of excavation or filling is the subject of a lien under the statute, and this certainly would be absurd.
2. It is claimed that the act is unconstitutional, and reliance is had for this contention on the third section of the act, which is as follows:
“Sec. 3. Any construction company, contractor, mechanic, laborer or person contributing supplies or material to any work named in section one of this act, shall at the time of filing the sworn statement of account as provided in section two of this act, file a good and sufficient bond of indemnity for an amount equal to the amount claimed, which bond shall be approved by the probate judge, and shall be so conditioned as to save and protect the defendant in any ease arising under this act, and shall then be entitled to a decree of the common pleas court, enjoining and prohibiting the operation, use or occupancy of the property created in whole or in part by the party or parties asking for said injunction; and the said injunction shall not be dissolved until the court is satisfied that the claim has been adjusted and paid in full.”
If the statute is to be read as mandatory, according to the words used, it cannot be doubted that it would be depriving an owner
I do not find it necessary to decide the question mooted with respect to section 3 however, because, assuming it to be invalid, I think the rest of the law may very well stand. The main object of the law was to give a lien for work done on the structures mentioned in the act. Section 3 is a mere special mode of enforcing the payment of the lien. If section 3 had not been in the act, there would be no difficulty in carrying out the provisions of the other sections,.though no particular proceeding was mentioned by which the lien could he enforced. Unless we are to suppose that the legislature’s sole purpose in this act was to enable a lien claimant to take the owner by the throat, so to speak, and compel payment by force of an injunction, the contention that the act becomes inoperative by reason of the invalidity of the third section must fail. We cannot impute to the legislature any such intention. Its main purpose was to create a lien in cases where its existence was pre-' viously doubtful. The lien being created, the remedy is manifest It is not necessary to refer to authorities to show that part of the act may be valid and part invalid by reason of its constitutional restriction. In such cases the court must be able to say from an examination of the whole act that the legislature would have passed that which is valid even if it had been advised that the invalid section would he declared so. Field v. Clark, 143 U. S. 649-695, 12 Sup. Ct. 495; Huntington v. Worthen, 120 U. S. 97-102, 7 Sup. Ct.
Finally, we come to the question whether the proceedings to perfect the lien in this case were seasonably taken. The second section of the act is as follows:
“Sec. 2. When it shall be .deemed necessary for any constructing company, contractor, sub-contractor, mechanic, laborer or person contributing supplies or material to secure their claim against any railroad, canal, turnpike, plank road, public work or public structure, either for work done or material furnished, they'shall file a sworn itemized statement within thirty days after said work was performed or materials furnished, of the amount of work done or materials furnished, showing the balance due and claimed for labor or material furnished, with the recorder of the county or counties within which said work was done or materials furnished. And if several liens be obtained by several persons on the same job, in the manner prescribed by this act, they shall have no priority among themselves, but payments thereon shall be made pro rata.”
The bill charges that tbe complainant, at the request of the defendant, operated the machinery after it had been started for a month, and also furnished during that month extra materials and extra labor, so that the last item for labor and materials furnished bears the date of the 29th of July, while the sworn and itemized statement of account was filed with the recorder on the 13th of August. It is very clear from these averments of the bill that the work under contract and that added by stipulation thereto were not completed until the 29th of July. The engine was started on the 1st or 2d of July, and from that time the complainant claims interest in accordance with the terms of the contract, which provides for the second $10,000 cash, and the delivery of the notes, when the machinery is started. I think it may be very doubtful whether the contract does not mean the starting of the machinery by the street-railway company; but, whether this be true or not, it is certain that the work was not done and the materials were not furnished, all of them, within the meaning of the statute, until the 29th of July. This objection, therefore, cannot be sustained.
We have thus considered all the grounds of demurrer, and find them not to be well taken. . The demurrer will be overruled, and the defendant required'to answer within 10 days.