57 N.J.L. 265 | N.J. | 1894
Lead Opinion
On the trial below, the plaintiffs in error offered evidence to show the cost of building abutments and bridges necessary to make the green strip available for
From the evidence and exhibit in the cause, the jury had a right to find that this strip of land could not be made available for beneficial use by the Pennsylvania company without filling it up to the grade of existing tracks. Before the crossing by the National Docks, earth-filling was only necessary. After the crossing is taken, it will be necessary to construct abutments and bridges to retain the earth-filling, which would otherwise fall upon the tracks to be constructed by the National Docks, and obstruct their use. In the judgment of this court, the evidence offered and overruled was competent and necessary to enable the jury to estimate the damages sustained by the Pennsylvania company by the crossing of that strip by the National Docks road. It was a question of fact for the jury to settle, what the value of that strip was to the Pennsylvania company for any purpose to which it might lawfully and reasonably appropriate it. If the jury should-find that the cost of constructing abutments and bridges, or the cost of any less expensive mode which might be devised in order to utilize the said strip after the taking, was in excess of the value of the strip after such redemption, then the jury should say that any such mode of attempting to redeem and. appropriate the said strip is unreasonable, and should not be resorted to. The consequence of such a finding would be that the said strip of laud would be rendered comparatively valueless when the crossing is completed, because it would cost more to make it available to the Pennsylvania company than it is worth. In that case the Pennsylvania company would be entitled to the value of the strip when redeemed, less the-cost of redeeming it, if the crossing was not taken. But if the-cost of abutments and bridges, or some other effective but less expensive mode of utilizing the strip after the taking, did not exceed the value of the scrip after it is redeemed, then the Pennsylvania company would be entitled to the difference between the cost of such mode of redeeming it as must be resorted to after the taking and the cost of redeeming it before the-
Dissenting Opinion
(dissenting). I am constrained to dissent from my brethren constituting the majority of the court, in the conclusion that the judgment in the Hudson County Circuit Court should be reversed.
The exceptions under review were taken on the trial of an appeal in a condemnation proceeding brought by the defendant in error, a railroad company, to acquire a route across the route and lands of the plaintiffs in error, other railroad companies, the crossing being made under the grade of the existing tracks of the older company.
A great number of exceptions were taken to the manner of framing the issue for the trial of the controversy, on the-appeal from the award of the commissioners, to the amendments thereto, and during the trial of the same. The only exceptions to rulings deemed worthy of discussion and determination are those set forth in the eighth and ninth assignments of error. To properly understand these rulings, the evidence in the case and the purpose of the offer of the testimony excluded must be carefully considered. For convenience, the railway company prosecuting the condemnation, which is the defendant in error, may be designated as the-Connecting company, and the two railroad companies, own
A part of the property taken was a crossing under grade of a number of yard tracks, and also under the tracks of the Pennsylvania company, on one of its filed routes in Jersey City, called the main passenger route. It was contended on the trial by the Connecting company, that the authorized width of this route was only sixty-six feet, but it was determined by the trial court that the width was one hundred feet [Pamph. L. 1830, p. 86; Pamph. L. 1868, p. 1030; Pamph. L. 1872, p. 567), and that, at the point of crossing, the Pennsylvania company held the width of one hundred feet, beside other lands on either side. At the point ■of crossing there are three tracks on this located width; the two northerly ones are used as the tracks of the main passenger line of the Pennsylvania company, and the southerly track of the three is used in connection with the large adjoining parcel of land owned by the said company as a part of their passenger car yard. The two main passenger tracks are located, one on each side of the centre line of the located route, and all of the three tracks cross over the route of the Connecting company on an iron girder bridge resting on stone abutments thirty feet apart, constructed by the Pennsylvania company in the year 1887. The trial court allowed the owning company to prove the cost of these abutments and bridge and the costs of these permanent maintenances, and directed the jury to include their value in the award ■of damages. Another offer was made by the Pennsylvania company. The proof was that, on their route at the place of crossing, there was room for more tracks, on both sides of these tracks, than there constructed, and that two more tracks could be laid on the route north of those already constructed upon it. In order to construct these two tracks to the north and on the same level, it would only be necessary for the Pennsylvania company, under present conditions, to make an embankment across the route of the Connecting company; that the taking of the under-grade crossing by that company
These offers were distinctly presented as the measure of damages, and not to show the capabilities of the property. The argument of counsel at the trial as it appears in the record demonstrates this. It is clearly stated to be that, “ If they [the Connecting company] did not build their road we could get all the rails which the law allows us to put on that highway without building any abutments, and therefore the damage we suffer is the difference between what it would cost to put the rails there without building an abutment, and what it would cost to put them there when we have to build an abutment.” The trial court so understood it, for in ruling upon this offer of the cost of the abutment, the court said, “ it is offered here as an element of damage to be included in
The testimony as to the estimated cost of these abutments was rejected. The trial court said, substantially, that there was no duty on the part of the Pennsylvania company to construct these two additional tracks; that it could not be contended that such use of the laud was more than a future possible use; that if, from the facts in evidence, one might just •as fairly conclude with as strong a probability that these lands would not be used for the two additional tracks, but for other railroad uses, which might very materially change the character and cost of construction, that no evident necessity existed for two more tracks at that point, and that the necessity might never arise.
It is then evident that the offer was made on the trial as a •definite measure of damages, and that it was ruled upon in •that aspect, and rejected as not competent for that purpose, and it cannot be presented on error as competent for other purposes not stated to the court at the time of trial.
In the case of Delaware, Lackawanna and Western Railroad Co. v. Dailey, 8 Vroom 526, in the Court of Errors and Appeals, Mr. Justice Yan Syckel, delivering the opinion of the court, said: “ It is the well-settled rule that a party shall not be" heard in an appellate court upon a point not taken, or a matter not raised and considered in the court below. The point specifically made was properly decided, and the court cannot say that if the evidence had been offered-for any legal purpose it would have been rejected. The result is in harmony with many cases which have been adjudged in this court and in the Supreme Court,” citing many cases.
The rejection of these estimates has been assigned for error, and a majority of the court hold that the estimates should have been admitted, and that the rejection was error. I cannot agree with that view.
How far possible future uses of land taken may be considered in condemnation cases is a matter which must, to a
While it may be said that the trial court is bound to admit ■evidence showing or tending to show the availability of the property for valuable uses, it is quite another thing to admit ■evidence as to the cost of some particular erection said to be necessary to adapt the land to such uses. The cost of restoration for an existing use stands upon an entirely different principle from the cost of creating a future use. The cost of restoring an existing use of land damaged by the taking may be proved in certain cases. Where it is apparent that the cost of restoring the existing use must be less than the •damages otherwise sustained, such cost should be provable on the principle that a party should not recover avoidable.damages. If a part of a house be taken, the damages might be the full value of the building, if not restored, but with such restoration the damage might be small; in such case the cost of restoration would be the fair measure of damages. Sedgwick aptly illustrates this doctrine as follows: “ If all the windows of a house should be broken, the measure of damages
The cost of restoring an existing use may also be proved where it appears that the restoration is necessary to the exercise of a public franchise which the condemning party has no lawful right to destroy. It is on this ground that in a railroad, or street crossing of railroad tracks, the cost of adjusting the existing tracks to a change of grade made necessary by the crossing, supplies the rule of damages. In the case of Massachusetts Central Railroad Co. v. Boston, &c., Railroad, 121 Mass. 124, Mr. Justice Gray said that ‘'damages could be allowed for changes in the surface absolutely required by law, or, in fact, necessary to be made by the corporation injured in order to accommodate its own land to the new conditions.” But here no present public duty to lay more tracks is shown, and no clear evidence appears that they now are or ever will be necessary for the exercise of the franchise. The fact that the land taken is part of a railroad route does not, it seems tome, entitle the owner to more than just compensation, measured by the usual standard. The restrictions on the condemnation of a railroad route are imposed solely for the benefit of the public; the private right of the railroad company has no sanctity, and the company " occupies no higher ground than a common landowner.” Morris and Essex Railroad v. Central Railroad, 2 Vroom 205, 214; Pennsylvania S. V. Railroad v. Philadelphia, &c., Railway Co., 160 Pa. 294. Land not necessary for the franchise may be taken, even though it be acquired by condemnation, or is part of the filed route. Railroad v. Belle Center, 48 Ohio 273, 295; New York and Long Branch Railway v. Drummond, 17 Vroom 644; Mobile Railroad v. Alabama Midland Railway, 87 Ala. 520, 523. As matter of fact, it -was not shown that the laying of the two tracks was contemplated or necessary. On the contrary, from the evidence it could not be contemplated except as a future possibility. It clearly appeared in the evidence that if the two proposed tracks should be laid,
It is difficult to perceive, under the facts, how the estimate of cost could have been admitted, even if it had not been offered as a fixed item of damages. As a defined and certain
Thus, so far as the offer ruled upon in the trial court is concerned, the matter might rest here as being properly rejected, but it is difficult to understand how the offer could have been made so as to be admissible for any other purpose than that stated. The evidence rejected was, I think, not only incompetent for the purpose for which it was offered, but for any other purpose in the cause.
If such estimates can be admitted, it would follow that not only in every case where the tracks of one railroad company cross under grade the tracks of another, but in every case where a highway crosses a railroad under grade, the cost may
It appears to me that a fatal objection to such proof, whether offered as a measure of damage or as an aid to the jury in estimating damages is that the amount proved can bear no definite relation to the damage sustained; it might be much less or much more. It does not meet the objection to say that the jury should allow the increased cost of adapting to the future use only when in their judgment the improvement is worth more than its cost. Such a rule would' afford •a most capricious measure of damage. Suppose we apply it to this case and ascertain the conclusion to- which it will lead. If the proposed abutments and bridges would cost $20,000, ■then the jury should value the land in its imaginary improved ■state, and determine whether the land thus improved would be worth that sum or more to the older company, and if so, ■award the $20,000. If the plan proposed should be one of ■a higher bridge, with a span of fifty feet, involving an expense of $30,000, then if the jury should deem the investment likely to prove profitable, they should award $30,000; if the plan should be to construct a permanent stone arch costing $40,000, then if the jury think favorably of the investment, they would award $40,000.
Many plans of future use might be presented, every one oi which might be a reasonable and profitable use of the land, but it would not follow that the increased cost of the con
I think the case in baud illustrates this position. Under the evidence, as I understand it, the abutments now standing are shown to have been erected some years ago by the owning company for the express purpose of connecting the freight tracks of the Pennsylvania company with the tracks of the-National Docks Railway Company, or some other company, by tracks crossing the passenger yard and tracks of the former under grade. This enterprise was not completed, and the Connecting company was organized and took these abutments-as a part of their route. On the completion of their railroad the land in question will be available to make this connection formerly projected at the grade of the new railroad. Rev., p>. 932, § 111. Such use would not be impaired by the taking, but would be by the extension of the abutments. The court could not, in view of this use, for which the land in the past had been actually prepared, and which is not impaired by the-taking, assume that some other use involving a large expense,, would, at some day, be profitable, and would be the least expensive mode of redemption, and on these assumptions admit, estimates of the probable cost thereof.
The mode of estimating damages proposed by the owning-company disregards the consideration that the owning company might provide itself with many new tracks on another part of its route or lands without incurring the expense of abutments at all. The Connecting company, under its amended" plan prescribed by the order of the Circuit Court, must at its own expense provide a tunnel and abutments on its route crossing under the car yard and route of the owning company for a length of five hundred and twenty-four feet, over which the Pennsylvania company may cross freely with their tracks. The space over this proposed tunnel, if occupied to its fullest capacity, could be crossed with about forty tracks. There are-now in use across it about twenty-five tracks.
It seems to me that the court could not submit to a jury' evidence establishing a rule of damage competent only by entirely ignoring all these considerations; it is not just compensation to award damages to sections of property which a consideration of the whole tract shows will not be in fact sustained. Chambers v. South Chester Borough, 140 Pa. 510, 523.
It is stated in the memorandum of the decision of the court in this case, that the least expensive mode of effecting the redemption of the property is the one which must be taken into account. By this, I take it is meant the improvement of the land for some valuable use, and the expense will depend on the use selected and the mode of improvement adopted for that use. The court cannot assume what that use or mode of use shall be. The court must rule on the offers of evidence when they are presented, and the court has no inspiration to determine whether the use proposed and the plan presented as proper to create that use will be the least expensive, but the court must, in order to admit the evidence of cost, assume when the owner offers to prove the cost of making any improvement on the land that this is the least expensive, and also that the property will be required for that use. I do not think that
Assuming its admission, the jury would not be able to determine whether the improvement in the future would be worth the cost. The jury cannot say what the abutments would cost at some future period of time. Neither the court nor the jury could determine this, and it cannot be of value in the proper determination of the amount of damage to know what some particular structure if built upon a certain site would cost now, and it is beyond question that the court and jury are to determine judicially what are now the present value of the land and the present damages sustained by the taking. New Jersey Railroad v. Suydam, 2 Harr. 25, 45, 47; see Santa Anna v. Haslin, 99 Cal. 538, 544.
In condemnation cases the parties whose property is taken, in order to swell damages, often enlarge upon those particular uses to which their land might in the future be devoted, and with which the taking will most seriously interfere, and ignore other uses equally valuable which are not impaired by the taking, and while these efforts on the part of the owner are entirely proper, it is the duty of the court to confine the testimony to the facts which show the availability of the property for future uses, and to exclude the evidence as to conjectural or speculative uses.
It is improper to permit estimates to be presented showing what some proposed construction on the land would cost under present conditions and what a like construction would cost under changed conditions, resulting from the taking, for the reason that compensation is to be given for what is known to be the present injury, and not for damages which may or may not be sustained in the future. Chambers v. South Chester, 140 Pa. 510, 522.
This doctrine appears to have been stated or approved in the case of Massachusetts Central Railroad v. Boston, &c., Railroad, 121 Mass. 124, where Chief Justice Gray said that the company had the like right with individual owners to damages, “ taking into consideration any fences or structures
I think the evidence was properly rejected by the trial court, and that the judgment below should be affirmed.