24 Minn. 501 | Minn. | 1878
On the trial below, after the plaintiff had closed his case, the court dismissed the action as to both defendants, on the ground that plaintiff had failed to make out a cause of action.
There was evidence sufficient to go to the jury, from which they might have arrived at these conclusions of fact. The mill company owns, in the city of Minneapolis, a strip of land lying along the westerly bank of the Mississippi river, partly above and partly below the falls. Some years ago it constructed, for convenience in using this property for milling purposes, a canal about eighty feet wide at the upper end, and diminishing in width toward the lower end, extending through the strip nearly parallel with the river for the distance of probably one thousand feet. Into this canal the water was taken at the upper end from the pond above the falls, and from the canal was furnished for water-power to the mills along its sides. The land.along each side of the canal was let by the company to various tenants for mill sites, and to each tenant a right of way over the canal to the premises so let, granted. The canal for its entire length and breadth was covered with a continuous platform, constructed of timbers and plank, and this platform was, for at least ten years, and with the full knowledge and acquiescence of the defendants, used in common by all who had business with the mills along the canal, in the same manner as a public thoroughfare is used, and that use of it was necessary to the convenient transaction of the business ,of the mills.
As to that part of the platform where the injury to plaintiff’s property occurred, the facts are, that in 1863 the mill company let to the defendant Morrison for a term of years a mill site abutting on the canal, with the right to draw from the canal a specified quantity of water, and the right to pass over the canal adjacent to the mill site. In 1865 Morrison let a part of this mill site, with the right of way in common with himself over the canal, to Noble and Walker. Noble
The rule of law governing the ease is that the owner or •occupant of real property is bound to use ordinary care and diligence to keep the premises in a safe condition for the ■access of persons who come thereon by his invitation, express or implied, for the transaction of business, or for any other purpose beneficial to him. Morrison was neither the owner nor the occupant of the canal, or the platform over it. He had merely the right of way over it in common with all others to whom the company might, so long as it did not prevent the exercise of his right, grant similar rights. The lease of the mill site gave him no other right. The ease of the company is different. The land through which the canal was cut was, including the canal, and so far as the case shows the platform covering it, real estate, and the exclusive property of the company, which it held subject onlyto the rights of way over it, which it had granted to others, and, subject to such rights, it was in possession of this real property. Plaintiff had a right to go upon the platform in transacting business with or
The order appealed from is affirmed as to defendant Morrison, and reversed, and a new trial ordered, as to the defendant the Minneapolis Mill Company.