delivered the opinion of the court:
In October 1998, plaintiff, Timothy C. Myers, filed a single-count complaint against defendant, Illinois Central Railroad Company. Plaintiffs suit arises from an April 1998 incident in which plaintiff, while employed by defendant, injured himself when he attempted to exit a moving train. In July 2000, defendant filed a motion for summary judgment. In August 2000, plaintiff filed a motion for leave to file an amended complaint. In October 2000, the trial court granted defendant’s motion and denied plaintiffs. On appeal, plaintiff argues that (1) the trial court erred in granting summary judgment based on its finding that (a) the Federal Railroad Safety Act of 1970 (FRSA) (49 U.S.C. §§ 20101 through 20153 (1994)) preempted the negligent speed allegations under the Federal Employers’ Liability Act (FELA) (45 U.S.C. §§ 51 through 60 (1994)), and (b) no genuine issue of material fact existed as to plaintiffs other claims; and (2) the trial court abused its discretion in denying plaintiffs motion for leave to file an amended complaint. We affirm in part, reverse in part, and remand.
I. BACKGROUND
In the early morning of April 2, 1998, plaintiff, then a 19-year employee of defendant, was a brakeman in a train crew that defendant had scheduled to go from Glen Yard to Joliet and then to Stepan Chemical Company. Other members of the crew included the following: David Allenson, the engineer, Kevin Rinck, a student engineer, and Joe Marassa, the conductor. On route to Stepan, the crew had to travel a section of track between Plaines and Stepan owned by Burlington Northern" & Santa Fe Railroad (Burlington Northern). Before the April 2 run, Allenson had run that section of the track only as a student engineer, never “alone.” Marassa was familiar with these tracks but he was in the second engine doing paperwork.
Burlington Northern granted the crew permission to run against the flow of traffic, also known as “operating in the dark” because the crew could not see the signals. Marassa told the crew to “run the speed limit.” The track had a class four rank, which has a speed limit of 60 miles per hour (49 C.F.R § 213.9 (1998)). The train came upon a curve with a restricted speed limit of 49 miles per hour.
As they approached the curve, Allenson, Rinck, and plaintiff saw what appeared to be the rear lights of a train on the same track. Allenson threw the train into emergency. Plaintiff tried to exit the train through the engine’s front door. When plaintiff attempted to open the front door by pushing into it with his left shoulder, the door did not open. As a result, plaintiff sustained an injury to his shoulder. Plaintiff again attempted to open the front door and was successful. However, the door got away from plaintiff and hit him in the knee, causing injury.
As plaintiff went to jump off the train, he noticed that the other train was on a different track. Plaintiff remained on the train until the train stopped. When the train stopped, plaintiff and Allenson noticed that Rinck was missing. Marassa and plaintiff found Rinck lying next to the train. Rinck had exited the train by using the back engine door.
In October 1998, plaintiff filed a complaint against defendant in Madison County. In April 1999, the Madison County circuit court transferred the case to Macon County. In July 2000, defendant filed a motion for summary judgment. In August 2000, plaintiff filed a motion for leave to file an amended complaint, seeking to add a second count pursuant to the Boiler Inspection Act (49 U.S.C. §§ 20701 through 20703 (1994)). That same month, defendant filed a motion to dismiss or strike from plaintiffs complaint all claims of damages for psychological turmoil or emotional distress caused by the accident. The trial court granted defendant’s motion to strike. In October 2000, the trial court granted defendant’s motion for summary judgment and denied plaintiffs motion to file an amended complaint. This appeal followed.
II. ANALYSIS
A. Summary Judgment
•1 Summary judgment is appropriate where, when viewed in the light most favorable to the nonmoving party, the pleadings, depositions, admissions, and affidavits reveal no genuine issue of material fact and the movant is entitled to judgment as a matter of law. 735 ILCS 5/2—1005(c) (West 1998); Ragan v. Columbia Mutual Insurance Co.,
1. Excessive-Speed Claim
In subsection (c) of section 8 of count I of his complaint, plaintiff alleged that defendant “ [negligently and carelessly allowed one of its trains to run [49] miles per hour at night against the current of traffic on a foreign railroad with no signals.” Plaintiff asserts that the trial court erred in finding that FRSA preempted plaintiffs aforementioned claim brought under FELA. We agree and note that we must read federal statutes to give effect to each if we can do so while preserving their sense and purpose. Pittsburgh & Lake Erie R.R. Co. v. Railway Labor Executives’ Ass’n,
•2 Enacted in 1970, FRSA contemplated a comprehensive and uniform set of safety regulations in all areas of railroad operations. Chicago Transit Authority v. Flohr,
•3 Enacted in 1908, FELA provides a federal remedy for railroad workers who suffer personal injuries because of the negligence of their employers or their fellow employees. Wilson v. Norfolk & Western Ry. Co.,
While the United States Supreme Court has not addressed the precise issue presented by this case, it has considered the question of whether FRSA preempts a state law action concerning excessive speed where the train was operating at a speed lower than the speed limit set pursuant to FRSA. See CSX Transportation, Inc. v. Easterwood,
In arguing plaintiffs claim is preempted, defendant relies on several federal district and circuit court of appeals cases, including the Seventh Circuit’s Waymire case. In Waymire,
•4 However, Easterwood acknowledged that FRSA would not preempt a suit for breach of such tort duties as the duty to slow or stop to avoid a specific, individual hazard. The Supreme Court specifically noted that it did not address the question of whether FRSA would preempt more specific allegations relating to speed because of the general nature of the speed claim. Easterwood,
Furthermore, we respectfully disagree with Waymire's application of Easterwood to a claim brought under FELA. Easterwood did not address the effect, if any, of FRSA on a FELA claim. Moreover, FELA is the exclusive remedy for injured railroad employees. Wabash R.R. Co. v. Hayes,
We are not alone in finding that FRSA does not supersede a claim brought under FELA. In Earwood v. Norfolk Southern Ry. Co.,
We recognize that Waymire is a Seventh Circuit case. However, we are not required to follow Seventh Circuit precedent interpreting federal statutes where, as here, the Supreme Court has not ruled on the question presented, a split of authority among the lower federal courts exists, and we believe that the Seventh Circuit case was wrongly decided. See Weiland v. Telectronics Pacing Systems, Inc.,
2. Other Claims
•5 Plaintiff next contends that the trial court erred in granting summary judgment on plaintiffs other claims. While the standard of proof is lower in a FELA case, FELA is not an insurance statute. Williams,
•6 In its motion for summary judgment, defendant pointed to plaintiffs deposition testimony in which he states his only criticism of the railroad was the speed at which the train was traveling. In his response to defendant’s motion, plaintiff did not dispute his deposition testimony or assert that he is not an expert witness. Further, plaintiff did not present any other testimony supporting his allegations of defendant’s negligence, other than the speed claim. Thus, no questions of fact existed as to defendant’s negligence on those claims. Accordingly, we must affirm the trial court’s grant of summary judgment as to the additional negligence claims, other than speed.
B. Leave To Amend Plaintiffs Complaint
•7 Last, plaintiff argues that the trial court erred in denying his petition for leave to file an amended complaint. Plaintiff sought to add a second count to his complaint under the Boiler Inspection Act (49 U.S.C. §§ 20701 through 20703 (1994)). A trial court has broad discretion in deciding a motion to amend pleadings, and a reviewing court will not reverse the trial court’s decision absent a manifest abuse of that discretion. Chandler v. Doherty,
•8 Before we can examine the merits of plaintiffs argument, we must address plaintiffs motion to supplement the record on appeal with a copy of the proposed amended complaint, which we have taken with the case. Defendant opposes the supplementation of the complaint, arguing that plaintiff did not timely file the motion and the motion is not file-stamped. However, defendant fails to contend that the proposed amended complaint was not before the trial court. While the copy attached to the motion to supplement was not file-stamped, an identical copy of the proposed amended complaint attached to plaintiff’s brief was file-stamped. We will grant plaintiffs motion to supplement.
•9 In determining whether to allow an amendment to a complaint, a trial court is to consider whether (1) the proposed amendment would cure the defective pleading, (2) previous opportunities to amend the pleading could be identified, (3) other parties would sustain prejudice or surprise by virtue of the amendment, and (4) the proposed amendment is timely. Chandler,
In support of his argument, plaintiff cites Giacalone v. Chicago Park District,
•10 Here, however, the amended complaint does not cure the defects in the original pleading. The first count of the amended complaint raises the same FELA claims as in the original complaint. The second count alleges a violation of the Boiler Inspection Act, asserting (1) the train was not in a proper and safe condition because of a defective door handle, (2) defendant failed to inspect the train, and (3) the engine of the train was not equipped with a reasonably safe door for crewmen to exit. No evidence in the record supports such claims. Because the proposed amended complaint did not cure the original complaint’s defects, we need not address the other three factors, and we find that the trial court did not abuse its discretion in denying plaintiffs motion to file the amended complaint.
III. CONCLUSION
Accordingly, we affirm summary judgment on subsections (a), (b), (d), and (e) of section 8 of count I, reverse summary judgment on subsection (c) of section 8 of count I, and remand for further proceedings consistent with this order.
Affirmed in part and reversed in part; cause remanded.
STEIGMANN, P.J., and COOK, J., concur.
