Murtha v. Integral Construction Corp.Murtha v. Integral Construction Corp.
Ordеr, Supreme Court, New York County (Elliott Wilk, J.), entered July 3, 1997, which, insofar as appealed from, granted the motion of defendant Integral Construction Corp. (Integral) for summary judgment dismissing plaintiff’s causes of action under Labor Law §§ 200 and 241 (6), unanimously reversed, on thе law, without costs, and the causes of action reinstated.
On December 15, 1987, plaintiff, an electrician in the emplоy
Plaintiff and a co-worker were crossing a basement when plaintiff heard drilling from overhead and was immediately showered by debris falling from thе ceiling, thereby causing him injury. It is uncontested that defendant’s employees were drilling and chopping concrete on the floor directly above the basement, that the basement area was not blocked off and that there were no warnings posted indicating that there was danger of falling debris.
Although plaintiffs complaint consisted of one causе of action sounding in negligence, plaintiff alleged therein that “the claim arose out of a violation of Articlе 10 of the Labor Law”. Moreover, in his bill of particulars, plaintiff claimed that defendant had violated Labor Law §§ 200, 240, and 241 and that defendant’s negligence consisted of: “removing a portion of the concrete floor above in a dangerous and hazardous manner, without properly providing for the safety of other workers in and about the area, in fаiling to provide proper * * * safety devices so as to catch and collect the falling debris, as well as failing to practice proper procedures in removing the concrete ceiling so as to protect others property in the course of their employment.”
Upon Integral’s motion for summary judgment dismissing the complaint, plaintiff, whilе not contesting the motion to dismiss his cause of action under Labor Law § 240 (1), argued that, in addition to his negligence cause of action, his remaining causes of action under the Labor Law should be sustained. In reference to his claim under sеction 241 (6), he asserted several violations of specific sections of the rules and regulations of the Commissionеr of the Department of Labor. The IAS Court, while upholding plaintiffs negligence cause of action, held that plaintiff hаd never properly asserted a cause of action pursuant to Labor Law § 200 and dismissed his Labor Law § 241 (6) claim. Sincе we find that the Labor Law causes of action should be sustained, we reverse.
First, although Labor Law § 200 was specificаlly referred to for the first time in plaintiffs bill of particulars rather than in the complaint, we do not find that this warrants dismissal under these circumstances. Plaintiff not only asserted a cause of action for negligence in his complaint, but specifically alleged that defendant was negligent and careless in creating a dangerous condition at the work site. Inasmuсh as Labor Law
As to plaintiffs cause of action under Labor Law § 241 (6), which requires the assertion that the defendant has violated a specific command of the rules and regulations promulgated by the Commissioner of the Departmеnt of Labor, although plaintiff did not initially allege specific regulatory violations in his complaint or bill of particulаrs, he did state in his complaint that defendant had violated article 10 of the Labor Law. Moreover, in his bill of particulars, he referred to section 241 as one of the statutes violated by defendant and specifically set forth that defendant’s negligence consisted of removing the concrete floor in a dangerous manner and “without properly providing for the safety of other workers”, and in failing to “provide proper safety devices” for falling debris.
Furthermore, in opposition to summary judgment plaintiff set forth that Integral had violated 12 NYCRR 23-3.3 (g),
Under these сircumstances, we decline to dismiss merely because plaintiff did not identify the specific code violations
Notes
. “Protection in other areas. Every floor or equivalent area within the building or other structure that is subject to the hazard of falling debris or materials from above shall be boarded up to prevent the passagе of any person through such area, or shall be fenced off by a substantial safety railing constructed and installed in compliance with this Part (Rule) and placed not less than 20 feet from the perimeter of such floor opening or such аrea shall be provided with overhead protection in the form of tight planking at least two inches thick full size, exterior grade plywood at least three-quarters inch thick or material of equivalent strength.”
. “Every place where persons are required to work or pass that is normally exposed to falling material or objects shall be provided with suitable overhead protection. Such overhead protection shall consist of tightly laid sound planks at least twо inches thick full size, tightly laid three-quarter inch exterior grade plywood or other material of equivalent strength. Such overhead protection shall be provided with a supporting structure capable of supporting a loading of 100 pounds per square foot.”