165 Mass. 109 | Mass. | 1896
The committee, acting as a committee, adopted specifications, in which the right to reject any or all proposals was reserved. Two of the three members of the committee afterwards, acting individually, said that the job should be let to the lowest bidder, and on the strength of this the plaintiff
The plaintiff contends that it might have been found that the provision of the specifications was waived at a meeting of' the committee. But there is nothing in the bill of exceptions which warrants this assumption. The direction of the court to' return a verdict for the defendant was right.
Exceptions overruled.