Munger v. City of St. Paul

57 Minn. 9 | Minn. | 1894

Collins, J.

The defendant city had caused the grades of Green-brier avenue and Wells street to be fixed in accordance with its charter provisions, long before the work was done of which the plaintiff complains. His lots were located upon a steep hill, and faced south upon Wells street, which ran east and west along the side of the hill, and below the lots. On the center line of this street the grade had been established, so that, generally speaking, it was just about at the natural surface of the ground, and, necessarily, the south half of the street Avould have to be filled when graded, while the north half, on which plaintiff’s lots abutted, would have to be excavated. The city had the undoubted right to enter upon the avenue and street for the purpose of bringing to grade, improving, and making them passable.

In the control and improvement of its thoroughfares for public use the city has the same rights and poivers as a private owner has over his own land, and is subject to tlie same liabilities. It would be liable for damages caused to plaintiff’s property by grading the avenue and street, just as a private owner of the soil over which *12they were laid would have been liable when improving it for liisown use; and the right to inflict damage «beyond that which a private owner might have inflicted without liability did not exist-The city was authorized to grade, but without exercising the right of eminent domain it was not authorized to encroach upon plaintiff’s, property when so doing. It could not excavate to the full width of the street, placing or leaving the slope thereof upon his lots, to-their injury and impairment. As we understand the evidence, this is just what was done; and with respect to the plaintiff’s right to recover for an interference with the soi-1 of his lots the jurors were fully advised in the charge.

As to the grading done, the facts were that to its full width the-avenue was placed on the established grade, while the north half of the street, — that half on which plaintiff’s lots fronted, — as before-stated, was brought to the same condition. It was excavated where it ran along the sidehill, and worked down to the established grade, and of this alone the plaintiff could not complain. The city was not obliged to grade the street to its full width, and, without incurring any liability to the plaintiff, could have left the south half in a state of nature, impassable for teams, and of no value as-a highway.

We will now consider the plaintiff’s right to recover compensation, for damages other than those resulting from an encroachment for slopes upon the soil of his lots. The important question is whether,, on the evidence, he was entitled to recover for alleged damages-arising out of the fact that, when grading, the city authorities,, without altering the theretofore established gradient lines, — as-authorized to do by the charter on making compensation to injured property holders, — caused a separate and distinct roadway to be-constructed on the south' half of the street, and a retaining wall to-be built along its center line. Opposite plaintiff’s lots this roadway was about fifteen feet below that on the north half of the street, constructed on grade, as heretofore mentioned. It is obvious from the evidence that the work was done so as to amount to a permanent- alteration of the established grade on the south half of the street, and for the purposes of this case it must be so treated. Because of the peculiar circumstances, the city authorities had power, when primarily fixing the grade lines of this street, to pro*13vide for two distinct and separate roadways, although the inevitable result would be to deprive abutting owners of some of the advantages and benefits of a full-width thoroughfare, Yanish v. City of St. Paul, 50 Minn. 518, (52 N. W. 925;) and it is apparent in this case that access to the plaintiff’s lots from the street itself was not rendered more difficult, nor did greater consequential damages result thereto, by reason of change in the gradation on the south or opposite side of the street. Nor was plaintiff deprived of any light or air. With all these facts presented in connection with the power of the city authorities to practically narrow the street when first establishing the grade, as settled in the Yanish Case, it would be somewhat difficult to state the correct rule for the ascertainment of plaintiff’s damages, even if we concede that he was entitled to recover because of the establishment of two distinct levels in the street.

Nor does the case, as now before us, require the correct rule to be stated, for it is evident that- plaintiff failed to show what his damages were, even within the rule as to the proper measure therefor his counsel now asks to have applied. Assuming, as counsel now contends, that where an established grade has been altered so that there are two levels in a street instead of one, an abutting owner is entitled to recover as damages the amount his property has been depreciated in value by reason of the alteration, it is plain that plaintiff’s proofs were not produced with reference to this measure of damages. On his part the cause was tried and submitted upon the theory that he was entitled to recover the full •amount that his lots had been lessened in value by reason of all grading; not only that which was unauthorized, because it resulted in a permanent roadway on the south half of the street fifteen feet below an already established grade, but also the consequential damages resulting from the authorized and lawful grading on the north half, — that work which was done in strict conformity with gradient lines theretofore properly fixed. The plaintiff’s damages were proved in a lump sum. All of his witnesses, when making their estimates, took into consideration what it would cost to make the lots available for building purposes, either by constructing retaining walls in front and on the sides, or by removing the soil ;so as to lower the surfaces. These were consequential damages, *14the result of placing the north half of the street on a lawfully established grade, and in no manner affected by the duality of roadways. As before stated, these were damagtes for which the city was not liable.

Counsel for plaintiff has called our attention to certain parts of the cross-examination of the plaintiff and one of his witnesses as to the depreciation in value caused exclusively by the lower roadway. Even if the measure of damages is as claimed by counsel, we do not hesitate to say that these witnesses, when answering the questions as to values before the work was done and diminution in value as the result of that work, kept continually in mind the consequential damages to the lots; in other words, that plaintiff was entitled to have the street graded to its full width of sixty feet, without the slightest injury to his property.

As there was no evidence upon which the jury could have intelligently acted when attempting to assess the damages arising out of the practical alteration of the grade on the south half of the street, assuming that the plaintiff was entitled to recover therefor, the rulings of the trial court challenged by the assignments of error last referred to were correct.

Order affirmed.

(Opinion published 58 N. W. 601.)

Application for reargument denied April 17, 1894.