Mount Vernon Contracting Corp. v. StateMount Vernon Contracting Corp. v. State
Appeal from a judgment, entered November 27, 1973, upon a decision of the Court of Claims, which dismissed claimant’s second, third, fourth, fifth and sixth causes of action and awarded the sum of $7,323.82 interest on the severed first cause of action. This claim arises out of a contract entered into by claimant for the reconstruction of a .98-mile section of the Cross County Parkway located in the City of Mount Vernon, Westchester County. The detailed plans called for widening both lanes of traffic, depressing the level of the parkway, providing a center mall, and supplying necessary shoulders, entrances and exits. Traffic was to be maintained at all times during the construction which was to be performed in three established sequential stages in accordance with a progress schedule submitted by claimant. This schedule, dated December 8, 1964, indicated that work was to commence on January 4, 1965, with Stage I to be completed by September 1, 1965; Stage II by December 1, 1965; and Stage III by December 1, 1966. However, the preconstruction meeting was not held until January 27, 1965, and formal notice to commence construction was not given until February 3, 1965, some 10 weeks after bids were opened. Claimant thereupon initiated preparatory work, but its survey party was ordered off the construction site by the Corporation Counsel of the City of Mount Vernon on February 9, 1965, and claimant was served with a formal restraining order two days later, signed by an Associate Justice of the Appellate Division, Second Department, in an action brought by the City of Mount Vernon to enjoin the appropriation of certain property required for the parkway reconstruction. Claimant was not a party to this action and the order remained in effect until May 4, 1965. On May 14, 1965, another interruption occurred which further prohibited construction until May 24, 1965. This disruption arose as the result of a civil disturbance precipitated by residents of the City of Mount Vernon who opposed and obstructed construction at the work site. This controversy was subsequently resolved and work was fully resumed early in June of 1965. Thereafter, certain problems developed in connection with the availability of designated disposal areas for excavated material and in obtaining a construction easement for a 48-inch sewer. Various extensions of time were granted by the State and the major items of contract work were completed by December 31, 1967, with the final work and cleanup ending in late May of 1968. The State had extended the completion date to May 31, 1968 without engineering charges, except after November 1, 1967, and the project was ultimately accepted by the State on June 28, 1968 some 19 months after the proposed completion date. Claimant filed its claim on January 16, 1970