64 Cal. 166 | Cal. | 1883
In his complaint plaintiff alleges “that he is ignorant of the true names of the defendants above designated as John Doe and Richard Roe, and therefore has thus designated them, and prays that when their true names are discovered the pleadings and proceedings herein may be amended by inserting such names in the place and stead of the names herein used to designate such defendants.”
The “ defendants ” filed an answer.
The record does not show that the true names of the defendants designated in the complaint as John Doe and Richard Roe have been discovered, nor have the pleadings and proceedings herein been amended by substituting any names for the fictitious names. Did the complaint not show that the names John Doe and Richard Roe were fictitious names, we might hold perhaps that the persons, whomsoever they were, who appeared and answered as John Doe and Richard Roe were .bound by the judgment—they having failed to plead the misnomer or to respond in their real names to the allegations made against them. But as the record reads we construe the answer to be the answer of those of the defendants sued by their proper names, to wit: W. H. Parks, Eli Davis, W. H. Perdue, A. B. Van Arsdale, G. W. Santee, George Ohyler, and James T. Leary, and the injunction as operative only against such persons, their servants, etc.
. It avers that the plaintiff now is, and for more than two years last past has been, the owner and in possession of a tract of land containing one hundred and fifty-eight acres, situated in the county of Colusa, which tract is specifically described; that the land has been held and possessed by plaintiff for farming, grazing, and fruit-growing purposes, and is of the value of five thousand dollars for such purposes; that plaintiff has and for more than a year past has had on said land a dwelling-house, usually occupied by- plaintiff’s tenants and employees, about one half mile of fence, a well, corrals, and an orchard of fruit-bearing trees of the value of eight hundred dollars.
The foregoing allegations of the complaint are denied by the answer, but the court below found them to be true, and the evidence is not before us.
The complaint further avers' that plaintiff’s land is situated between Butte Creek and the Sacramento Biver, above where Butte Slough puts out of said river; that said slough puts out of said river below plaintiff’s land, less than a mile therefrom, and running in a southeasterly direction to the mouth of Butte Creek, flows thence in a southerly direction to and into said river, at a point more than twenty miles south of and below plaintiff’s land; that Butte Creek rises and has its source more than forty miles northeast of plaintiff’s land, and flows in a southwesterly direction and into Butte Slóugh at a point on said slough about two and one half miles southeast from plaintiff’s land; that Butte Creek and Butte Slough, from their point of confluence with each other, and the said Butte Creek from a point at least twenty miles northeast of plaintiff’s land, to such confluence, flow through a basin of low land, which basin is bounded on the west by a strip of high land from one to three miles in width, extending along the east bank of the Sacramento Biver from a point on said river about thirty miles above and north of where said Butte Slough puts out of said river to a point where said slough enters said river, and on the east by the high lands adjacent to the Butte Mountains, and the high lands along the west bank of the Feather Biver —which said basin . has an average width of about two miles; that during the winter and spring months in each and every year large quantities
The ansAver admits the allegations of the complaint last set forth, except that the defendants deny that Butte Slough runs to the mouth of Butte Creek, or into the Sacramento River at any point; deny that Butte Creek runs into Butte Slough, or that there is any junction or confluence of said creek and slough, “ except that both run into the same large basin of tule and SAvamp lands”; alleged that the Avater floAving into or through the basin described in the complaint is in volume not more than one tenth of the Avater of the main Sacramento, and deny that the Avaters of the basin described in the complaint, or any part thereof, are discharged from the Sacramento or Feather River through said creek or slough at any point south of the head of said slough.
- The court found that Butte Slough runs to the mouth of Butte Creek, and floAvs thence in a southerly direction “ to and into the tules of Sutter County” at a point more than five miles south of and beloAV plaintiff’s land; that Butte Creek flows into Butte Slough at a point on said slough about íavo and one half miles southeast of plaintiff’s land; that Butte Creek and slough from the point of their confluence floAv through the basin described in the complaint and discharge their Avaters into the said “tules of Sutter County,” and that in the Avinter and spring months the waters floAving to and in said basin are in volume about equal to that of the main Sacramento at points opposite said basin.
Tlius the finding of the court accords with the last recited allegations of the complaint, except that the court finds that, after their junction, Butte Creek and slough flow into the tules of Sutter County, instead of finding that Butte Creek and slough floAv into the Sacramento and Feather Rivers, as alleged in the complaint.
The complaint further Alleges that plaintiff’s land is part of the said strip of high land lying on the east bank of the Sacramento River, and during the winter months of every year is at times partially overflowed by the waters of said Butte Creek, and by the waters of the Sacramento River, that find their way into said basin as aforesaid, but such overflow is slight and does not interfere with the use and enjoyment of said land for the purposes for which it is owned and possessed; that said land is relieved from said overflow by the flowing off of said waters through said basin, creek, and slough, which constitute the natural and only outlet for said water; that if said slough, creek, and basin remain open, and the slough and creek unobstructed, the flood waters of each year will be drained off before any injury is done to said land of plaintiff, or the improvements thereon.
The answer denies these last averments. The court found as alleged by plaintiff, except that it found a portion only of plaintiff’s land was part of the high land on the east bank of the Sacramento.
The plaintiff further pleads, that defendants, on the 17th day of October, 1874, unlawfully and wrongfully raised, constructed, and ever since have maintained, a dam across said basin below and within about two miles of plaintiff’s land, and upon the freehold of defendants; that said dam extends from the high lands on the east side of said basin to the high land on the west side thereof, and crosses said Butte Slough and Butte Creek at points one fourth of a mile above and north of their confluence, and is of sufficient height, length, and strength to dam up and. entirely obstruct, and does dam up and entirely obstruct, said creek, slough, and basin, and prevents the flow of any of said waters through the same at and below said dam, and has since.
The ansAver denies that either of the defendants ever built the dam, except as in the answer subsequently admitted, and expressly denies that the dam has obstructed the creek, slough, or basin, or that it caused any Avater to flow or remain upon plaintiff’s land, or that, by reason of the dam, plaintiff has sustained any damage.
The court found that the dam dammed up and obstructed the said creek, slough, and basin, ánd did cause the Avaters flowing upon plaintiff’s land to remain thereon for a greater length of time than they Avould have remained except for said dam.
The plaintiff in his complaint further alleges that the defendants intend to and Avill, unless prevented by the judgment of the court, forever maintain said dam at its present height, length, and strength, and will forever by it dam up and obstruct said creek, slough, and basin, and prevent the flow of any of said Avaters; that if defendants so maintain and so obstruct the ííoav of said AAraters, the waters that Aoav upon the land of plaintiff as aforesaid will remain thereon, and the waters Avill back up and overfloAV said land, flood plaintiff’s dwelling-house, wash aAvay and destroy his fences, fruit trees, and other improvements, deposit injurious sediment, etc. These averments are denied by the defendants.
Plaintiff’s prayer is for an injunction, damages, and costs.
The defendants further allege in their answer that in the spring of 1871, in pursuance of an act of the legislature entitled, “ an act to provide for the protection of certain lands in the county of Sutter from overflow,” approved March 25, 1868, defendant W. H. Parks, together with other persons not. parties to this action, claiming in good faith to be the owners and in possession of over sixty thousand acres of land in the county of Sutter, subject to overflow, petitioned the board of supervisors of said county, in- accordance with said act of the
That a part of one of the plans adopted by said board of supervisors and the engineers of said district, to protect said district from overflow, was the building of the dam or levee complained of. That the contract for said dam or levee, according to specifications fixed and prescribed by said engineers and board of supervisors, was awarded to defendant, W. H. -Parks, and duly executed by him on the 23d day of July, 1874. That -defendant Parks, with his servants, built said dam or levee in exact accordance with said contract and specifications, and that none of the other defendants assisted or participated in the building thereof. That defendants Perdue and Van Arsdale, as members of said board of supervisors, and ex-officio directors of said levee district, signed said contract for the building of said levee
Defendants further answered that, after the commencement of this action, and on the-day of January, 1875, said dam or levee was wholly abated and removed.
The court below found that a petition in due form was presented by defendant Parks and others not parties to this action, for the formation of a levee district, as alleged in the answer and under the act referred to, that petitioners were the owners of more than one half of the lands described in the petition, that on the 11th of March, 1871, the board of supervisors duly made and entered an order as required by law, erecting said lands into “ Levee District Mo. 5.” That the building of the dam was part of the plan adopted. That on the 23d of July, 1874, the board of supervisors, in pursuance of the act, made and entered into a contract with the defendant Parks for the construction of the dam described; that at the time of the presentation of the petition and the making of said order and the taking of the other proceedings, the defendants Perdue, Van Arsdalc, and Davis “were members of said board of supervisors, and participated in the proceedings hereinbefore* set forth.”
That in pursuance of said contract, defendant Parks constructed on lands of said defendant and others a dam across said basin, creek, and slough, within about two miles of plaintiff’s said land; that said dam was constructed from the high lands on the east side of said basin to the high lands on the west side thereof, crossing said creek and slough at points about one fourth of a mile above and north of their confluence; that said dam, as constructed, was of sufficient height, length, and strength to dam up and obstruct, and did dam up and obstruct said creek, slough, and basin so as to prevent, “ except through a gate, culvert, and waste way respectively,” the flow of any of the waters of the same at and below said dam, and did cause the waters flowing upon plaintiff’s land as aforesaid to remain thereon for a greater length of time than they would have remained had it not been for said dam; that
That on the 19th of January, 1875, and after the commencement of this action, the said dam was broken by the pressure and force of the waters standing above and north thereof, and about six hundred feet of said dam was then washed and carried . away by said waters, the land above said dam, including plaintiff's said land, being thereby relieved from overflow, the . water causing said overflow finding an outlet through the break in said dam.
The court also, at the request of defendants, adopted certain findings to the effect following: —
That the object of the dam or levee was to reclaim and protect from overflow by water the swamp and overflowed lands within the District No. 5; that the dam or levee was built in strict accordance with plans and specifications made by the engineer of District No. 5, and the contract of defendant Parks with said district through its proper agents, and was completed pursuant to said contract, and accepted by said district, before . any injury resulted therefrom to plaintiff; that the basin referred to annually fills and overflows from the waters of the Sacramento Diver and Butte Creek to a depth that renders a portion of plaintiff's said land unfit for cultivation; and has so overflowed every year for more than twenty years, except the year 1864; and the largest proportion of the water, filling said basin, flows from the Sacramento Diver over its banks and through Butte ■ Slough; that said basin fills as the river rises, and empties, if unobstructed, as the river falls.
That on the 26th day of November, 1874, the said dam backed the waters up and over the plaintiff's land, and caused the same to remain thereon until the 19th of January, 1875, and that by said dam plaintiff has been damaged in the sum of one hundred dollars.
Such were the issues made by the pleadings, and such the findings of the court so far as they responded to such issues.
The cause was tried in the District Court in January, 1876, and the court, in addition to the findings above set forth, found in.substance as follows: That after the break in the dam, and after this action was commenced, certain lands in Sutter County
That the trustees of said reclamation district, the defendant Parks being one of them, afterwards and in pursuance of a plan of reclamation by them adopted, made and entered into a contract with one-for the repair of said dam, and in pursuance of the said contract the said-in the summer and fall of 1875, did repair said dam by rebuilding so much thereof as had been previously washed away as above stated, and. did at the same time enlarge and strengthen the whole of said dam; so that the same as repaired, enlarged, and strengthened is sufficient to dam up and obstruct the said waters as aforesaid. That the said trustees of said reclamation district ever since—the defendant Parks being one of them — have had their agents and employees upon said dam protecting and maintaining the same.
That unless restrained the said trustees will continue to maintain said dam and to keep the same in repair, and will forever thereby dam up the waters flowing through said creek, slough, and basin, so as to overflow and remain upon plaintiffs said land as aforesaid, and thereby to cause the waters to remain upon a portion of plaintiffs land for a period of at least six weeks longer each year than they otherwise would.
The judgment appealed from enjoins the defendants, their servants, etc., from constructing, maintaining, etc., and provides that plaintiff recover of defendants $100 damages, and $369.10 costs.
The findings were all filed at the same time, but, for convenience of reference, we shall style those first hereinbefore set forth
The additional findings, except in so far as they are evidence of an intent on the part of defendant Parks to continue the dam, are entirely without the issues, and cannot uphold a judgment against the defendants, Ohyler and Leary. If it be conceded that the original erection of the dam was unlawful, and that Parks, Perdue, and "Van Arsdale (the two last by reason of their having signed the contract with Parks), were parties to such unlawful erection, all others who aided or assisted in the work, and all who, after it was erected, either before or after the commencement of the action, aided or assisted in continuing or repairing the dam, as agents, servants, employees, or co-workers with the persons who constructed it, would of course be bound by the judgment and restraining order against Parks, Perdue, and Van Arsdale, by virtue of their connection with and relation to the defendants last named. But plaintiff ought not, under the pleadings in this action, to have a judgment for damages and costs against Ohyler and Leary, who had in no way interfered with his rights, or assisted others in interfering with his rights, prior to the commencement of the action. It is found that defendants Ohyler, Leary, and Davis were members of the board of supervisors when a “reclamation district” was formed under the Act of March 28, 1868, and when the trustees of such reclamation district let the contract for the rebuilding of the dam, in pursuance of a plan by them adopted. But if the establishment of the reclamation district so connected the defendants Ohyler, Leary, and Davis with the rebuilding of the dam — such rebuilding being conceded to be unlawful—as that they would be held to be parties to the rebuilding, the establishment of the reclamation district was a new and independent act on the part of Ohyler, Leary and Davis, in no way connected with the previous formation of a levee district (Ko. 5) under the Act of March 25, 1868, or with the erection of the dam thereunder; an act which occurred after the commencement of this action, and no supplemental or amended complaint was filed under which they could be tried for such subsequent act. Plaintiff was not authorized to take a judgment for damages and costs against those who, as we have seen, if they did him any wrong, did it
And even if it should be conceded, that, in consequence of the fact Ohyler and Leary having 'been members of the board of supervisors when the “reclamation district” was formed, etc., they should be held as the servants or co-workers of the persons who originally built the dam in maintaining and continuing it, and therefore bound by any injunction which should issue against such persons, yet, in the absence of supplemental complaint, charging them as such co-workers, and giving them an opportunity to deny the charge, no judgment for damages and costs should have been entered against them.
The judgment is therefore erroneous as to defendants Ohyler and Leary.
On the other hand, the other defendants were not entitled to defend under the Act of March 28,1868. If it should be conceded that the original erection of the dam Avas unlawful, nevertheless if the Act of March 28, 1868, is a valid act, and the dam Avas rebuilt in strict pursuance of that act, the defendants would have been entitled to assert the facts (although the rebuilding was done after the suit Avas brought) by Avay of defense, to shoAV that the dam ought not to be abated, or its continuance enjoined —had they pleaded the facts by supplemental ansAver. But they failed to do so.
Hence, under the pleadings neither Avas plaintiff authorized to take a judgment against defendants Ohyler, Leary, and Davis, based upon the fact that they Avere members of the board of supervisors Avhen certain tilings were done, subsequent to the commencement of the action, nor can defendants rely as a defense upon the establishment of a “reclamation district,” under the Act of March 28, 1868, after the commencement of the action.
The ansAver avers that defendants Perdue and Van Arsdale, as members of the board of supervisors and ex-officio directors of Levee District Ho. 5, signed a contract for the building of the dam by defendant Parks. Whether the admission that they signed the contract makes them responsible is a question here
There are, therefore, no facts found which can uphold the judgment against the defendant Davis.
The judgment against the defendant Santee is clearly erroneous. The findings in no way connect Santee with any of the acts claimed to be wrongful.
It remains to inquire whether the judgment against Parks, Perdue, and Van Arsdale should be permitted to stand.
As we have seen, the court below found that the dam or levee was built in strict accordance with plans and specifications made by the engineer of District Vo. 5, and the contract.
It may be conceded for the purposes of this decision, that if the legislature had power to pass the Act of March 25, 1868, and that act was pursued by the supervisors and other officers whose duties are prescribed by it, and the dam was a work which they had authority to erect under the act—the plans by them adopted and carried out not being inherently defective or violative of the law—the present action cannot be maintained; that under such circumstances, any incidental damage which may have occurred to plaintiff in the prosecution or completion of a public work authorized by the State is damnum absque injuria. (Green v. Swift, 47 Cal. 536.)
The present Constitution of the State provides:—
“ Private property shall not be taken or damaged for public use without just compensation having been first made to, or paid into court for, the owner.” (Art. 1, § 14.) The Constitution of 1849 reads: “Vor shall private property be taken for public use without just, compensation.” (Art. 1, § 8.)
In Green v. Swift, supra, it was held that the incidental damage caused by a public work authorized by law in flooding or washing away of the soil from the land of a citizen—the work having been done in strict accordance with law, skillfully, and without malice—was not a taking of private property within the meaning of the Constitution then in operation. We have repeatedly intimated that we would follow the construction of the provisions of the former Constitution given by the highest tribunal created by that Constitution. And it may be conceded, for the purposes of this decision only, that the doctrine of Green v. Swift is applicable to the facts of the present ease.
It is proper to inquire whether the erection of the dam or levee found to have damaged the plaintiff’s land was authorized by the act of March 25, 1868.
The land within the delta above the junction of Butte Creek and Butte Slough is in Colusa County. (Pol. Code, § 3916.) The court below found that the dam, as constructed, extended from the high lands on the east side of the basin to the high lands on the west side thereof, crossing said creek and slough at points about one fourth of a mile above and north of their confluence. The portion of the dam between the creek and slough was, therefore, in Colusa County.
The act of the legislature under which defendants Parks, Perdue, and Van Arsdale seek to justify is entitled “an act to provide for the protection of certain lands in the county oí¡ Sutter from overflow.” (Stats. 1867—1868, p. 316.) By its terms it confers power on the board of supervisors of Sutter to establish levee districts only within the limits of their county. (§§ 2, 21.) The board of supervisors are authorized to adopt a plan for the protection of any levee district created under the act, to divide it into sections, and to let contracts for the construction of sections of a levee or other work of protection. (§ 10.) The power to adopt a plan is not in terms limited to the adoption of a plan which shall provide for the construction of levees or other works only within Sutter County, nor is the power conferred upon the board to contract for the construction-of levees without the county, unless such power is conferred by
But the board of supervisors of Sutter County had the right to employ only such power, with respect to the adoption of plans and construction of works, as was conferred by the act of the legislature, and in inquiring whether the grant is limited we should consider as well the whole act as the nature of the official powers, under the Constitutions and laws of the supervisors, as legislative and executive public agents.
The eighth section of the act empowers the board to take possession of any land within the district that may be necessary for any levee or work of reclamation. It also empowers the board to take possession of any land outside the district and within the county that may be necessary or proper to furnish material for the construction of a levee, or other work of protection, within a district. The same section requires that if the property, within the district or county, of which possession may thus be taken, is private property, the board shall petition the county judge of the county of Sutter, to appoint three appraisers, etc. It may be conceded that the private proprietor may voluntarily surrender possession and waive damages, and that the power to condemn includes the power on the part of the county to accept lands, within the district or county, thus donated for the purpose of a levee, or for the purpose of the talcing of material therefrom. There is no power conferred by the act upon the board of supervisors to contract for the purchase of lands for a consideration, or to levy an assessment to provide moneys to pay for lands thus purchased. It would seem that it was not within the contemplation of the legislature that lands should be acquired whereon to erect levees or works of protection, or from which to take building material, except through the employment of the power of eminent domain (within Avhich is included the acquisi
This view is strengthened by a consideration of the nature of the office of supervisor. They are local officers. The act imposes the duty of keeping the levees and other works in repair, and of levying and collecting taxes upon all the property within the district for the purpose of raising funds to keep them in repair. If the supervisors of Sutter have power to cause to be erected and kept in repair a levee, or part of a levee, in Colusa, they have power to erect and keep in repair levees, all but one of which shall be in other counties than Sutter. It is not to be supposed that legislators closed their eyes to the complications between counties and property owners in different counties which would thus arise. Again, if the board of supervisors are authorized to include within levees large bodies of land not within the district, the effect may be a direct benefit to such lands, or portions of them, by protecting them from overflow. But the lands within the limits of the district only can be assessed for benefits conferred upon such lands. The legislature has no power to relieve a portion of the lands benefited. (People v. Lynch, 51 Cal. 15.) It may be said that the facts of this case do not show any of the lands without the district, to be benefited by the work. But we are now considering the interpretation to be given the Act of March 25, 1868, and may reasonably presume that the legislature did not intend that the power to adopt plans and build levees should be employed in such manner as to result in consequences which might be obnoxious, because violative of constitutional principles. (People v. Parks, 58 Cal. 624.) The establishment of an assessment district is a declaration that the only lands which will be benefited by the proposed protection works, are the lands within the district. It must be admitted it was not intended the board should include within levees lands without the district which should be benefited by the work. It will be urged, however, that the board has power to determine that lands without the district are not benefited by
Our conclusion is that the officers of the county of Sutter had no power to cause a levee to be built in the county of Colusa.
We ad at there are constitutional objections to the Act of March 25,1868, not heretofore considered by the Supreme Court.
The twenty-first section of the act is mandatory. It reads: —
“Sec. 21. Whenever a petition shall be received by said board of supervisors from persons in possession of more than one half of the acres of any specified portion of said county, asking to be set apart and erected into a levee district, said board shall at'once erect such territory into a levee district, and place it under the provisions of this act, to be called Levee District Ho. 1, 2, 3, and so on, as the case may be; provided, that it shall not be required to submit the question of tax to a vote of the people of any district so erected.”
With respect to assessments for local improvements Mr. Justice Cooley says: “The district within which the tax shall be laid may be determined in either of two modes; (1) the legislative authority either of the State, or, when properly organized, of the municipality, may determine over what territory the benefits are so far diffused as to render it proper to make all lands contribute to the cost; or, (2) the assessors or commissioners who, under the law, are to make the assessment, may have the whole matter submitted to their judgment, to assess such lands as in their opinion are specially benefited and ought therefore to contribute to the cost of the work.” (On Taxation, 449.)
It is manifest that the act of the- legislature we are considering does not provide for the creation of an assessment district in either of the two modes above pointed out. Under the twenty-first suction, if valid, the levee district, which is the assessment district, is established neither by the legislative authority of the State or county, nor by assessors or commis
By entering into the contract with defendant Parks for the construction of the levee, the defendants Perdue and Van Arsdale aided and abetted the former in his unlawful act.
The judgment against defendants Parks, Perdue, and Van Arsdale should be affirmed; against Santee, Ohyler, Davis, and Leary should be reversed.
Ordered that the judgment of the District Court be modified by reversing and setting aside so much thereof as adjudges that plaintiff have and recover of and from defendants Davis, San-tee, Ohyler, and Leary the sum of one hundred dollars damages and three hundred and sixty-nine dollars costs, and that the said judgment of the District Court be in all other respects affirmed.
Eoss, J., Sharpstein, J., and Myrick, J., concurred.
McKee, J., and Thornton, J., concurred' in the judgment.