75 P. 896 | Cal. | 1904
This action is to compel the specific performance of a contract. The contract is appended to the complaint *343 and made a part of it. It is quite lengthy, covering over seventeen pages of the printed transcript on appeal, bears date August 12, 1897, and relates to a large tract of land, about two thousand one hundred and forty acres, in Tulare County. Among other things, the agreement recites that on a certain designated portion of the land there is a basin of water which has been excavated about one hundred and twenty-five feet long and seventy feet wide, and that a cut or trench has been excavated for about four hundred feet northerly from said basin, in order to develop water; that Tuohy is desirous that more water be developed by further work in said cut for the irrigation of certain lands, or such as are fit for citrus culture, and Moore agrees to begin within thirty days and finish before August 1, 1898, the work of extending said cut towards Rocky Hill at least fifteen hundred feet from said basin, and to deepen the cut by two hundred feet, and make the cut sixteen feet wide on top and two feet deeper from the surface of the ground than the average depth of the present cut, and, like the present cut, the lowermost portion shall be a channel about thirty inches wide dug out with picks. Moore also agrees that he will put a certain ditch on said lands in good repair, or construct a new one to reach said lands within sixty days from signing the contract, and also agrees to place an engine at the basin with power enough to pump twenty-five feet in height all water required for irrigation, and he further agrees to construct a bridge for wagons across said cut or trench, and either to make an aqueduct to carry the water of a certain creek which crosses the line of said cut, or to make a new channel for said creek to Lewis Creek, on the north side of said basin, the right of way for the new channel to be thirty-five feet in width, and during the six years after the date of the contract Tuohy agrees to sell to Moore on certain named terms such lands as Moore may select, in lots of twenty acres and up, from certain lands lying below the line of the flume or ditch Moore proposes to construct from said basin to said land, and into which he (Moore) agrees that he will pump water to a height equal to twenty-five feet when measured from a plane five feet below the ordinary surface of the water in said basin. The deeds are to be executed on the performance of certain named conditions, the payment of specified amounts of money at different times, *344 final payment extending over a period of ten years, and, among other things, requiring the payment of taxes and assessments by Moore. It is further provided in case Moore, who proposes to sell to colonists, shall sell any of the land for more than one hundred dollars an acre, Moore agrees to pay Tuohy one third of such excess, and he also agrees that he will plant out at once orange-trees on the greater part of a tract of one hundred acres which he will at once locate and take on the rental plan, and will proceed to extend said cut at once, and within a time fixed to sink at least one well. It is further agreed that if by the work to be done no more water shall be found than sufficient to irrigate the one hundred acres first taken by Moore and the present orchard of Tuohy, Moore has the right to stop further development for water, and is to have the water there now, and what may be developed by extending said cut fifteen hundred feet, on paying Tuohy forty dollars an acre for said one hundred acres and furnishing Tuohy water in a certain way to irrigate his present orchard. Said Moore further agrees that if the water now existing, with that developed by extending the cut fifteen hundred feet, is more than sufficient to irrigate said one hundred acres, then he will, as he finds sale for the lands he has a right to purchase, continue to develop more water by extending said cut, or by sinking wells during the next six years for which he has the right to lease or purchase lands. At the end of six years, if the water exceeds the amount required by Moore, Tuohy may use the same on paying to Moore the proportion of the cost of pumping and maintenance of flume or ditch, or his proportion only of the cost of pumping in a certain event. It is further agreed that when Moore sells land to any colonist that at least one half of such land shall be planted to citrus-trees during the first year after such sale is made, and also that, if extending the cut fifteen hundred feet develops more water than sufficient to irrigate the one hundred acres first taken by Moore and Tuohy's orchard, on the basis of one miner's inch to two and a half acres, said Moore shall take such further amount of land from Tuohy as this additional water will irrigate, and having sold the same as low as one hundred dollars an acre, Moore shall take from Tuohy another twenty acres, or more if he sees fit, and proceed to develop more water from the same by extending the cut, and in this *345 way shall go on developing water and taking land. Moore may desist from extending the cut after extending it fifteen hundred feet from the basin, and may desist from developing water generally, with the understanding that in such case after November 1, 1898, he shall lose his right to purchase or rent any more lands from said Tuohy than those he has taken up till that time, and it is recited that time is of the essence of the agreement.
It is alleged in the complaint as a reason why the action was not brought earlier that upon August 19, 1897, and before default on the part of the plaintiff as to any of the conditions or provisions of said agreement, and while plaintiff was engaged in carrying out the same on his part, defendant notified plaintiff that he could not and would not perform any of the conditions or provisions thereof on his part, and has never since retracted said notice, but has at all times since failed and refused to comply with any of said conditions or provisions, and has refused to permit plaintiff, and has not allowed plaintiff to go upon said land for the purpose of complying with any of the conditions or provisions of said agreement on his part. It is further alleged in the complaint that on September 13, 1897, defendant herein commenced in the superior court of Tulare County an action against the plaintiff herein for the rescission and annulling of said agreement, and that said action has at all times since been and is now pending; that a judgment was rendered in favor of the plaintiff in said action, the defendant herein, by the said superior court on July 14, 1899, and thereupon the defendant therein, plaintiff herein, took an appeal to the supreme court, and thereafter, and upon August 3, 1901, the judgment of the superior court was reversed and set aside by said supreme court. That the plaintiff has at all times been and is now able, willing, and anxious to fully carry out all the terms and conditions of said agreement on his part, of which defendant had full knowledge and notice, and but for said action so instituted by defendant the plaintiff would have promptly commenced an action against defendant for the specific performance of said agreement. The original complaint united with the action for specific performance a cause of action for damages in the sum of twenty thousand dollars, as alleged to be resulting from defendant's wrongful acts whereby plaintiff *346 was prevented from complying with the terms of the agreement in question. The amended complaint omits the portion of the original complaint in reference to damages, so that the present action, as already stated, is one for specific performance of the agreement in question only. The demurrer to the amended complaint having been sustained and the plaintiff declining to further amend, judgment was entered in favor of defendant, from which judgment plaintiff appeals.
It seems to be the theory on the part of the plaintiff that because the defendant failed in his action to rescind the contract in question, and as he refuses to permit the plaintiff to proceed thereunder, and practically has repudiated the contract, that therefore plaintiff has a right to have said contract specifically performed. This, however, does not follow. One party to a contract may refuse to carry it out, and thereby cause damage to the other party; still the nature of the contract and the conditions may be such that the contract cannot be specifically enforced. "Neither party to an obligation can be compelled specifically to perform it, unless the other party thereto has performed, or is compellable specifically to perform, everything to which the former is entitled under the same obligation, either completely or nearly so, together with full compensation for any want of entire performance." (Civ. Code, sec.
In Stanton v. Singleton,
The cases cited and relied upon by appellant do not sustain his position here. In Hall v. Center,
The amended complaint failed to state a cause of action for a specific performance, and the demurrer to the same was properly sustained.
Judgment affirmed.
Shaw, J., and Angellotti, J., concurred. *350