Moore v. SerafinMoore v. Serafin
- Reporters:
- , ,
- Before:
- Shapiro
In this аction the plaintiffs, owners of lots in Fairfield Memorial Park, sought an injunction requiring the removal of a mausoleum
The finding, with such corrections as are warranted, discloses the following: Colonial Cemeteries, Inc., owns and operates a place of burial in the town of Stamford, known as Fairfield Memorial Park. Original deeds to purchasers оf burial plots from Colonial Cemeteries, Inc., contain a restrictive covenant in the following language: “No monument, tombstone, vault, marker, fence, coping, mound or other object of any kind protruding above the surface of the ground may be erected or any hedge, plants, trees or flowers be planted on such plot except such as may be approved by the said grantor, and no monument or other structures extending above the ground shall be erected as a family memorial or otherwise, and in place thereof shall be used bronze tablets or grave markers of uniform size to be specified by the grantor, lying flush with the turf.”
The plaintiff owns several plots located in Fair-field Memorial Park, some of which she purchased prior to 1963, when the mausoleum in dispute was erected. She claims she was induced to purchase thеse because she believed no above-ground structure would be permitted there. The remains of the plaintiff’s father, mother and two sisters lie buried
On November 23, 1962, Colonial Cemeteries, Inc., by deed, conveyed to the defendants Serafín a plot designated “A” in the pine grove section of Fairfield Memorial Park. In addition to containing the language recited in the restrictive covenant, this deed had typed on its face: “2-erypt mausoleum and two vault spaces.”
Between November, 1962, and April, 1963, a stone mausoleum costing $5800 was constructed on the Serafín plot, which is in a section that has not been developed or subdivided into burial plots. The actual time for its erection on the site was about two weeks. The mausoleum measures four feet by seven feet, is about four or five feet high, and rests on a base flush with the surface, the base extending about five feet below the surface of the ground. There are no other mausoleums on the site of Fairfield Memorial Park.
The plaintiff made no complaint regarding the presence of the mausoleum until February, 1965, and at the trial offered no evidence of a monetary or other specific loss which she wоuld suffer through the continued presence of the mausoleum. The defendant Helen Serafín was at the time of the trial seventy-seven years of age and the removal of the mausoleum would seriously affect her health. Since June, 1963, the mausoleum has contained the body of Wasyl Serafín, the father of the defendant Stanley Serafín, and is designed to accommodate the remains of his mother, the defendant Helen Serafín, on her death.
Other than claims related to the finding, which was corrected as required, the plaintiff’s appeal is limited to claimed error in the overruling by the court of her claims of law that the restrictive covenant in the deed clearly forbids the erection of a mausoleum; that it cаnnot be waived or modified since no express right to do so was retained by the grantor, and that she, as grantee of a common grantor under a common development plan of
The granting of injunctive relief in each case is within the sound discretion of the trial court exercised according to recognized principles of equity.
Dimmock
v.
New London,
157 Conn. 9, 18, 245 A.2d 569;
Waterford
v.
Grabner,
155 Conn. 431, 434, 232 A.2d 481;
Lebanon
v.
Woods,
153 Conn. 182, 195, 215 A.2d 112;
Holt
v.
Wissinger,
145 Conn. 106, 113, 139 A.2d 353;
Weil
v.
Poulsen,
142 Conn. 213, 216, 112 A.2d 890;
Adams
v.
Greenwich Water Co.,
138 Conn. 205, 218, 83 A.2d 177;
Maganini
v.
Hodgson,
138 Conn. 188, 195, 82 A.2d 801;
Farrington
v.
Klauber,
130 Conn. 170, 173, 32 A.2d 644;
Platt Bros. & Co.
v.
Waterbury,
72 Conn. 531, 554, 45 A. 154;
Fisk
v.
Hartford,
70 Conn. 720, 732, 40 A. 906. In exercising its discretion, the court, in a proрer case, may consider and balance the injury complained of with that which will result from interference by injunction.
Adams
v.
Greenwich Water Co.,
supra;
Maganini
v.
Hodgson,
supra, 196;
Sisters of St. Joseph Corporation
v.
Atlas Sand, Gravel & Stone Co.,
120 Conn. 168, 175, 180 A. 303;
Bickell
v.
Moraio,
117 Conn. 176, 187, 167 A. 722;
Bauby
v.
Krasow,
107 Conn. 109, 115, 139 A. 508;
Gage
v.
Schavoir,
100 Conn. 652, 668, 124 A. 535;
Robinson
v.
Clapp,
65 Conn. 365, 380, 32 A. 939; 42 Am. Jur. 2d, Injunctions, §§ 58, 306; 20 Am. Jur. 2d, Covenants, Conditions and Restrictions, §§ 313, 328. Where the granting of the injunction would cause damage to the defendant greatly disproportionate to the injury of which thе plaintiff complains, it may be held inequitable to grant a mandatory injunction and the plaintiff may
The trial court applied this so-called doctrine of comparative injury in concluding that it would be inequitable to grant a mandatory injunction. The plaintiff does not assign as error this conclusion and has neither made draft findings nor briefed the issue of whether the trial court abused its discretion in denying equitable relief because of a misapplication of the doctrine in this case. See
Adams
v.
Greenwich Water Co.,
supra;
Sisters of St. Joseph Corporation
v.
Atlas Sand, Gravel & Stone Co.,
supra, 176; 20 Am. Jur. 2d, Covenants, Conditions and Restrictions, § 329. She does not successfully attack any finding of fact in this case which might tend to bring the defendant within the indicated scope of the recognized doctrine, but has, instead, confined her brief and her assignments of error solely to her proper legal rights arising under the covenant. We must conclude, then, that the court propеrly weighed the equities between the parties
We turn next to the denial of the injunction restraining the defendant Colonial Cemeteries, Inc., from allowing or consenting to the erection of above-ground structures and objects in the future. The trial court made nо findings and reached no conclusions relevant to the denial of this injunction. It did, however, deny the plaintiff’s claim of law that the restrictive covenant forbids the erection of a mausoleum. Thus, the trial court appears to have predicated its denial of this injunctive relief solely on the belief that the covenant allowed the defendant cemetery to give permission for such structures. We cannot agree that this is the correct interpretation of the restrictive covenant.
The defendants claim that the first clause of the covenant subjects to the grantor’s control structures
By contrast, the construction placed on the covenant by the plaintiff renders the language and meaning of the covenant unambiguous and certain on its face. The plaintiff maintains that under the covenant the approval of the grantor may only be granted to erect “hedges, plants, treеs or flowers,” all other enumerated above-ground structures and
We conclude that the covenant is fairly susceptible of only one interpretation, that advocated by the plaintiff. Thus, there is no need to apply additional rules of interpretation, for in determining the effects of a deed or a written contract where the language is fairly susceptible of but one interpretation, the inquiry is not what the parties impliedly intеnded but what is the intent which is expressed, and that intent must be given effect.
Shorefront Park Improvement Assn., Inc.
v.
King,
157 Conn. 249, 256, 253 A.2d 29;
Pulver
v.
Mascolo,
155 Conn. 644, 649, 237 A.2d 97;
Katsoff
v.
Lucertini,
supra;
Roessler
v.
Burwell,
119 Conn. 289, 295, 176 A. 126;
Patzloff
v.
Kasperovich,
116 Conn. 440, 442, 165 A. 349;
Hoyt
v.
Ketcham,
54 Conn. 60, 62, 5 A. 606; 23 Am. Jur. 2d, Deeds, §161. The intention of the parties, gathered from their words, is gathered not by reading a single clause of the covenant but, as we have done, by reading its entire context. See
B. T. Harris Corporation
v.
Bulova,
135 Conn. 356, 360, 64 A.2d 542;
City National Bank
v.
Bridgeport,
109 Conn. 529, 539, 147 A. 181;
H. J. Lewis Oyster Co.
v.
West,
93 Conn. 518, 523, 107 A. 138;
Loomis
v.
G. F. Heublein & Bro.,
91 Conn. 146, 150, 99 A. 483. It is only where more than one interpretation is permissible that it is necessary for this court to seek the intent of the doubtful language in the light of
We have long recognized that no court of equity should ever grant an injunction merely because of the fears or apprehensions of the party applying for it, for those fears may exist without any substantial reason. Nicholson v. Connecticut Half-Way House, Inc., 153 Conn. 507, 511, 218 A.2d 383; Brainard v. West Hartford, 140 Conn. 631, 635, 103 A.2d 135; Goodwin v. New York, N.H. & H.R. Co., 43 Conn. 494, 500; Bigelow v. Hartford Bridge Co., 14 Conn. 565, 582. The defendant cemetery, however, in its brief admits that if a permanent injunction is not issued it is planning to carry on an additional operation — “that of developing the pine grove section as an area for garden crypts.” This is sufficient to demonstrate that it is reasonably probable that the defendant cemetery is presently threatening a breach of the covenant so as to entitle the plaintiff to an injunction restraining a future breach of the сovenant. Ginsberg v. Mascia, 149 Conn. 502, 505, 182 A.2d 4; Holt v. Wissinger, 145 Conn. 106, 116, 139 A.2d 353; Lampson Lumber Co. v. Caporale, 140 Conn. 679, 685, 102 A.2d 875; Armstrong v. Leverone, 105 Conn. 464, 472, 136 A. 71. In Lampson Lumber Co. v. Caporale, supra, we said: “If the named defendant is threatening a breach of the restrictive covenant, there can be no question that the plaintiff is entitled to an injunction restraining the breach, irrespective of whether the damage it will suffer is great or small. Armstrong v. Leverone, 105 Conn. 464, 472, 136 A. 71.”
Under the view that we tаke of this case as it is presented by the record before us, the plaintiff’s additional assignments of error require no discussion.
There is error and the case is remanded with direction that the trial court enter a permanent injunction restraining the defendant cemetery from apрroving in the future the erection of any man-made structure or object enumerated in the covenant that protrudes or extends above the surface of the ground within the coniines of Fairfield Memorial Park.
In this opinion the other judges concurred.
Notes
The issue whether such relief should have been granted is not before us. In her complaint the plaintiff sought only injunctive relief. See ad damnum clauses in Practice Book, Part II, Injunction Form Nos. 345-360, which illustrate prayers for alternative monetary relief. The plaintiff has at no time sought money damages and no money damages were awarded. See