79 Mo. 478 | Mo. | 1883
The petition was filed February 20th, 1875, and contained two counts. The first alleged that prior to the 4th day of March, 1874, the defendant had erected and on said day maintained in the Missouri River near the southern bank thereof at Kansas City, a certain lumber and timber structure; and nearer the center of the river at that point another structure, box-like in form and filled with stone, rising to a height of thirty feet or more above the surface of the river, both of which were obstacles in the way of vessels and rendered navigation dangerous; that said structures were erected and maintained wrongfully and in violation of the rights of the plaintiff' and the public to the free and unobstructed use of the river as a highway ; that the first mentioned structure had changed the ordinary current of the river which had formerly been parallel to the face of the structures, so that on the 4th day of March, 1874, it flowed with great velocity from the southern shore diagonally across toward the box-like structure near the middle of the river; that while the Alice, one of plaintiff’s steamboats, was on said day in the exercise of due care and caution attempting to pass down the river between said structures, it was by the changed current hurled from its course near the shore, out into the river
To this petition defendant first interposed a plea to the jurisdiction, alleging “ that the structures complained of were a part of the Kansas City bridge, owned by defendant and erected by authority of an act of congress; that the Missouri River was a navigable stream, and that said structures were located within the jurisdiction of the district court of the United States for the western district of Missouri, which court had exclusive jurisdiction of the subject matter of the action.”
This plea was heard and overruled by the court and exceptions duly saved; whereupon the defendant filed its answer, which was in substance as follows: The answer consisted of a general denial, and a special defense which stated that congress, by an act approved July 25th, 1866, authorized the construction of a bridge across the Missouri River at or near Kansas City; that the Kansas City & Cameron Railroad Company availed itself of the provisions of said act and built a bridge at Kansas City, which was a pivot draw-bridge with a draw over the main channel of the river at an accessible and navigable point, and with spans of 160 feet in length in the clear on each side of the pivot pier of the draw; that the next adjoining spans to the draw were 250 feet, and were thirty feet above low water mark and ten feet above high water mark, measuring to the bottom chord of the bridge, and with piers which were, at the time of the location and construction thereof, parallel with the current of the river; that the Kansas City & Cameron Railroad Company afterward consolidated with
The reply specifically denied compliance with the provisions of the act of congress; that the spans were of the required length or that the piers were parallel to the current of the river; or that the structures mentioned in the-petition were any part of the bridge.
Upon this state of the pleadings the cause was tried by a jury. The evidence submitted before them, as we gather from the record, is quite voluminous, but we shall only refer to such portions as we deem necessary to a proper disposition of the material questions presented by the record. The sections of the act of congress, authorizing the building of the bridge, are as folloAvs:
Section 2. Any bridge built under the provisions of this act may, at the option of the company building the same, be built as a draw-bridge with a pivot or other form of draw, or with unbroken or continuous spans ; provided that if the said bridge shall be made with unbroken and continuous spans, it shall not be of less elevation in any case than fifty feet above extreme high water mark, as understood at the point of location, to the bottom chord of the bridge. Nor shall the spans of said bridge be less than 250 feet in length, and the piers of said bridge shall be parallel with the current of the river, and the main span shalli be over the main channel of the river, and not less thani 300 feet in length ; and provided, also, that if any bridge built under this act shall be constructed as a pivot draw
Section 3. Any bridge constructed under this act and according to the limitations, shall be a lawful structure, and shall be recognized and known as a post route, upon which also no higher charge shall be made for the transmission over the same of the mails, the troops and munitions of war of the United States than the rate per mile paid for their transportation over the railroads or public highways leading to the same bridge.
Section 10. Any company authorized by the legislature of Missouri may construct a bridge across the Missouri River at the City of Kansas upon the same terms and conditions provided for in this act.
The last paragraph of the 1st section of said act is as follows: “And in case of any litigation arising from any obstruction, or alleged obstruction to the free navigation of said river, the cause may be tried before the district court of the United States of any state in which any portion of said obstruction or bridge touches.”
In regard to the construction of the bridge it appears that it is a pivot draw-bridge, and while its piers are parallel with the current of the river they are not at right
On the south side of the south draw opening, a row of pontoons were placed extending from pier No. 1, up the river about 340 feet to the shore, pier No. 1 being about sixty-five feet from the Kansas City shore and being the pier on which the south end of the draw rests when in position. These pontoons were constructed of a number
It further appears that the pontoons remained floating- and in position until the latter part of the winter of 1873-4, when they sank. The evidence for the plaintiff tended to show that they sank transversely, or in a direction quartering out into the river; that there was a cross current, starting from near the south shore, above the head of the pontoons and running diagonally across the river, in the direction of the upper draw-rest; and that while the boats were attempting to pass the draw-bridge, in charge of skillful pilots, exercising ordinary care and skill, they were caught by the cross current and hurled against the upper draw-rest and injured, whereby they were damaged and .disabled and required repairing, which was done at a large expense and outlay; and that they were necessarily detained from service and use for the period of from fifteen to twenty days each; that the charter value or hire of said boats per day was at least $100, and that they could have been readily chartered or hired at that sum. On the other
1. Unless the bridge mentioned in the answer had piers which were parallel to the current of the river, and spans of not less than 160 feet in the clear on each side of the pivot pier, then said bridge is an illegal structure and an unlawful obstruction to the navigation of the Missouri River, and if the jury believe from the evidence that it was not such a bridge, and further believe that the plaintiff’s boats, Alice and St. Luke, or either of them, while attempting to pass through the draw of the bridge in charge of pilots exercising usual and ordinary care, struck the draw-rest of the bridge, and were thereby damaged, then the jury will find their verdict for the plaintiff', as to such boats.
2. If the jury believe from the evidence that the defendant erected its bridge in such manner that the pier thereof known as the pivot pier, with the draw-rests attached thereto, was not parallel to the current of the river and that the same so remained up to the time of the accidents to the plaintiff’s boats complained of; or, if the jury believe from the evidence that the defendant so constructed its said bridge that the span thereof, on the south side of the pivot pier and next adjoining it, was less than 160 feet in length in the clear between said pier No. 1, and said pivot pier or the draw-rest attached; and if the jury further believe from the evidence that plaintiff’s steamboats, Alice and St. Luke, or either of them, were while plaintiff was
3. If the jury believe from the evidence that there was a cross current in the Missouri River setting out from the south shore thereof, near where the pontoons had been fastened to said shore and running thence to the head of the draw-rest attached to the pivot pier, and that said cross current was created by the sinking of defendant’s pontoons in the river during the winter of 1873-4, and that while plaintiff was navigating said river with the steamboats Alice and St. Luke, or either of them, and by its pilots using reasonable and ordinary skill and care in handling said boats or boat, said boats or either of them were by the force of said cross current carried against said draw-rest and injured, then the jury will find for the plaintiff the amount of the damage received by such boat or boats.
4. If the jury find for the plaintiff for damages to said steamboats, or either of them, they will find for the amount of the charter value of such boat, during the time of her necessary detention by reason of such injury, and also for the cost of necessary repairs caused by such injury, as the same are shown by the evidence, not exceeding however $2,500 for damages to the Alice and $3,000 for damages to the St. Luke.
The defendant asked no less than eighteen instructions, only two of which were given by the court; one of them, No. 18, in a modified form, to-wit:
18. If the jury believe from the evidence that any of plaintiff’s officers and agents had notice that the pontoons in evidence were sunk or out of position so they could not beused, and had caused a cross-current dangerous to navigation at the time of the injury to the St. Luke, then it was the duty of her officers and agents to have exercised a degree of care and skill in descending through the draw of the bridge in question commensurate with the increased danger, and if the jury believe from the evidence that such care and skill were not exercised in attempting to descend through said draw, they will find for the defendant on the second count in plaintiff’s petition.
The court also, of its own motion, gave the following instructions, over the objections of both parties, to-wit:
1. If the jury find from the evidence that at the time the damage was done to plaintiff’s steamboat “Alice,” the waterin the north draw of said bridge was of sufficient depth and width to have passed said boat safely through the same with ordinary care and skill of the pilot on said boat, and the south draw of said bridge was filled with floating ice, and had a cross-current running there through in the direction of the breakwater named in plaintiff’s petition, and
2. If the jury believe from the evidence that, at the time of the injury complained of in the second count of plaintiff’s petition as done to the steamboat St. Luke, the water in the north draw of the defendant’s bridge was of sufficient depth and width to have enabled the pilot on said boat, with ordinary care and skill, to have run said boat safely through the same, and that at the same time a crosscurrent was running through and across the south draw of said bridge in the direction of the breakwater named in said second count, and that said pilot ran said boat through the south instead of the north draw of said bridge, and in doing so was wanting in proper judgment, care and skill, amounting to negligence, which contributed directly to the injury sustained by said boat, they must find for the defendant on said second count.
There was a verdict for plaintiff for $5,300, and judgment accordingly, from which the defendant, in due time and manner, appealed to this court.
The law applicable to this question, and pertinent to this case, is well expressed by Wood on the Law of Nuisance, in sections 302, 596 and 621, to the following effect: “ Whatever is authorized by statute, within the scope of legislative powers, is lawful, and therefore cannot be a nuisance. But this must be understood as subject to the qual ification, that when an act, that would otherwise be a nuisance, is authorized by statute, it only ceases to be a nuisance so long as it is exercised within the scope of the powers conferred. * * But if the powers of the-act are exceeded, or are exercised in a manner different from that provided in the grant of authority, the grant will be no protection, and the party doing the acts will be chargeable for a nuisance at the suit of persons injured thereby, the same as though there had been no color of authority given for their exercise. * * The rule at present recognized may be stated to be, that where a person sustains a special damage peculiar to himself, either in person or property, direct or consequential, from a public nuisance, whether arising from the obstruction of a highway, or from any cause, he shall have his remedy therefor.” These positions are abundantly supported by the authority cited, and are believed to be a correct statement of the law upon this subject.
In the first place, it must be remembered that in a proceeding like this it is not necessary to inquire or determine whether the bridge in question is so far unlawful and unau
There are other minor questions incidental to this one, mentioned in the briefs, which are either necessarily involved in the decision of this one, or otherwise unnecessary to a proper disposition of the case, and need not be further noticed.
As it was not pretended at the trial, as we have seen, that the pontoons or lumber and timber structures near the southern bank of the river at that place, were any part of the bridge or structure which the defendant was by law authorized or required to place there or keep in position, they were confessedly illegal structures and unauthorized obstructions to navigation, and the instructions for plaintiff on that point are clearly unobjectionable and need no comment.
The instructions given by the court of its own motion,
Upon the whole, the case seems to have been fairly tried, under proper instructions, and as the evidence on all the controverted points was conflicting and contradictory, the finding and judgment thereon will not be disturbed.
For these reasons the judgment of the circuit court is affirmed.