OPINION
This is an appeal by Missouri Pacific Railroad Company, d/b/a/ Union Pacific Railroad Company (“MoPac”), defendant in the trial court, from a judgment in favor of Salvador Buenrostro (“plaintiff”) for personal injuries suffered when plaintiff was attempting to lift a railroad crosstie.
Plaintiff sued MoPac for negligence under the Federal Employers’ Liability Act (“FELA”) 2 and for having maintained and/or failed to warn of an alleged dangerous premises condition. Trial was to a jury, and based on the jury’s verdict judgment was rendered and filed against Mo-Pac on September 30, 1991, for $458,000.00 in actual damages plus prejudgment interest. MoPac’s motions for judgment notwithstanding the verdict and for new trial were denied.
On February 13, 1985, “MoPac” entered into a “Fibre Optics” Agreement with U.S. Sprint (“Sprint”) to “permit” Sprint the use of a portion of its railroad right-of-way for the purpose of laying a fibre optic cable. The right-of-way was fifteen feet wide and the boundary nearest the railroad was twenty feet from the centerline of the railroad track. Although legally required to permit Sprint the use of its right-of-way, MoPac was also legally required, as a certificated common carrier, to maintain its own transportation system along its right-of-way. In keeping with this obligation, Mo-Pac secured from Sprint an agreement that Sprint’s right of use would be subject to MoPac’s right and obligation to use and maintain its entire property in the performance of its public duty as a common carrier.
In order to coordinate these two legally mandated uses of its right-of-way, MoPac further required Sprint to coordinate with MoPac’s general manager, or his designee, for each access to the right-of-way with the understanding that MoPac’s operations would have priority over Sprint’s installation and construction activities, and with the concomitant necessary understanding that Sprint would schedule installation and construction to avoid disruption to railroad operations.
Aside from MoPac's legal obligation to keep its own rail transportation system functioning, however, it was to have no control over the laying or maintenance of the cable. Instead, Sprint was to be and remain an independent contractor for the purposes of laying and maintenance of the cable, and Sprint was to furnish all of the equipment necessary to construct and maintain the system.
MoPac, on the other hand, was to have control over the services rendered by U.S. Sprint’s employees and no control over the employment, discharge or compensation of Sprint’s contractors and subcontractors, and was, specifically, not to be responsible for the clearing or removal of trees, shrubs, plants or debris from Sprint’s area of occupancy.
Having secured its agreement with Mo-Pac, Sprint contracted with Grady Crawford Construction Company (“Crawford”), an expert in the field of laying fibre optics cable, to do the actual job of laying the cable. Crawford in turn subcontracted with Joe Brewer Construction Company (“Brewer”) to clear that portion of the right-of-way leased to Sprint for the laying of the cable. Brewer, a brush-clearing concern, thereafter hired plaintiff and others to assist in its clearing function.
MoPac designated its own employee, Steven Waits, to monitor the activities of Sprint (and its contractors) in laying the fibre optics line to assure that such did not jeopardize MoPac’s activities or injure the property of other right-of-way users. To *69 that end, Waits had authority to stop the fibre optics work, but only in the event that it was to interfere with the structure of MoPac’s track or the movement of its trains, or with the cables of other right-of-way users. 3 To that end, Waits also had the authority to keep the fibre optics workers from contact with MoPac’s trains, by posting flagmen with such crews which might be working within twenty feet of the railroad track. Waits did not, however, have authority to evict any company for safety violations, to tell Sprint or its subcontractors what machinery or equipment to use, or to tell Sprint or its subcontractors how clear the debris from the right-of-way or how to go about the details of the work. In addition, MoPac was not responsible for the maintenance and/or clearing of Sprint’s area of occupancy, nor did it have any control over the employees of Sprint or its contractors or subcontractors. During the fall of 1987, plaintiff felt a sharp pain in his back and stomach, 4 while removing railroad ties from the right-of-way as a part of Brewer’s cleaning operation. 5
Plaintiff testified at trial that he and other members of the Brewer cleanup crew had been picking up railroad ties all day on the date of the accident. He further testified that he and another man were removing a railroad crosstie from Sprint’s designated area of occupancy when he felt a sharp pain to his back and stomach.
Plaintiff filed his Original Petition on August 30, 1990, and his Second Amended Original Petition on his trial pleading, July 28, 1991, wherein he alleged in particular:
[t]hat on or about September 30, 1987, Plaintiffs while performing operations with his employer so as to actually or constructively make Plaintiff an employee of Defendant for F.E.L.A. purposes, was working with a crew of Defendant, and in summary, further alleged that, at the time of his injury, he was engaged in interstate commerce activities on behalf of MoPac; that MoPac had caused his injury by failing to provide him with safe equipment and a safe place to work; that MoPac had been negligent in failing to correct and/or maintain a dangerous condition on the premises; and that he was a borrowed, dual or sub-server of MoPac at the time of his injury. 6
Plaintiff thus went to trial upon two theories of recovery: 1) that MoPac was his “employer” within the meaning of § 51 of the FELA and had violated FELA-man-dated duties to provide him with safe equipment and a safe place to work; and 2) that MoPac had violated a duty of care as a premises occupier to maintain the premises free of an unsafe condition and/or to warn him of same.
The jury found in their answer to Special Issue No. 1 that at the time of the accident in question, plaintiff was an employee of MoPac, who served as a borrowed servant of MoPac, or was acting for both Brewer or MoPac simultaneously, or was a sub-servant “of a company that is in turn a servant of the railroad.”
Special Issue No. 2 asked: “Whose negligence, if any, was the legal cause, in whole or in part however slight, of the occurrence in question?” ... “Answer “yes” or “no” beside the names listed below”
(a) Defendant Missouri Pacific Railroad Company d/b/a/ Union Pacific Railroad Company _
*70 (b) Plaintiff, Salvador Buenrostro _
The jury answered “yes” to (a) and “no” to (b).
The jury was then instructed:
If you have answered “Yes” to both blanks of the preceding question, and only them, you will answer the next question (Special Issue No. 3).
Consequently, Special Issue No. 3 was not answered.
The jury found, in answer to Special Issue No. 4, that the negligence of MoPac “proximately caused the occurrence or injury in question.”
The jury found, in answer to Special Issue No. 5, that MoPac was 100% negligent as found by it in answer to Special Issue No. 4.
The remaining Special Issues are damage issues, which are not challenged by MoPac.
MoPac contends in its ninth point of error that the trial court erred in refusing to permit it to amend its pleadings to assert the defense of limitations.
MoPac did not initially plead limitations, but on September 16, 1991, it sought leave, pursuant to Rules 63 and 66, Tex.R.Civ.P., to file an amended pleading asserting its limitations defense. The trial court, however, denied such Motion, and thereby precluded MoPac from affirmatively pleading limitations.
MoPac argues that in denying it leave to amend, the trial court clearly abused its discretion; that raising the defense of limitations would not have delayed the trial, would not have surprised or prejudiced plaintiff, whose own pleadings demonstrated the bar; and would not have raised new fact issues; therefore, under such circumstances, the trial court abused its discretion by not permitting late pleadings asserting such defense. MoPac further argues that plaintiff could not truthfully suggest that he was in any manner surprised by the assertion of a defense which appeared on the face of its pleadings; 7 nor could he truthfully assert that there were any fact issues which he would therefore be rendered “unprepared” to meet. Accordingly, under the circumstances of this case, both the spirit and intent of Rule 66 require that the amendment be permitted, since the limitations defense was established as a matter of law.
Plaintiff, on the other hand, contends that the trial court did not abuse its discretion in denying MoPac leave to file a trial amendment setting up the defense of limitations because: 1) a docket control order set May 13, 1991, as the deadline for the filing of pleading by plaintiff and May 20, 1991, as the deadline for the filing of pleadings by MoPac, and the motion for leave to file an amended answer, or in the alternative a trial amendment, setting up the defense of limitations was not presented to the trial court until September 16, 1991, which was after the voir dire of the jury panel had been completed and the jury had been selected; 2) permitting MoPac to inject limitations into the case of the time the request for leave to file was made would have denied plaintiff his right to develop proof on responsive allegations on the discovery rule and fraudulent concealment as well as to deny him his right to voir dire the jury on those issues; 3) it would have prejudiced the plaintiff to have allowed such amendment since not only would the cause of action have obviously been negated, but at the very least, would have required plaintiff to develop facts showing the reasonableness of his late discovery of MoPac’s use of sub-contractors to pull out the railroad ties and its FELA liability; and 4) an amended answer, or a trial amendment, injecting limitations into the case would have presented a new defense which would have prejudiced plaintiff.
We agree with plaintiff. The trial court has the discretion to refuse a trial amendment when the amendment asserts a new cause of action or defense, and thus is prejudicial on its face, and the opposing
*71
party objects to the amendment.
Greenhalgh v. Service Lloyds Ins. Co.,
Plaintiff, in the instant case, objected to the filing of MoPac’s trial amendment. The suggested trial amendment, if permitted to be filed, would have injected a new defense in the case which would have prejudiced plaintiff. Moreover, MoPac knew from August 31, 1990, the plaintiff alleged that he was injured on September 30, 1987. The trial court did not abuse its discretion in refusing to permit the filing of MoPac’s trial amendment. MoPac’s ninth point of error is overruled.
MoPac contends in its second point of error that there is no evidence to support the jury’s finding in response to Special Issue No. 1 that plaintiff was a borrowed servant of MoPac at the time of his injury, or that he could be deemed to be acting for both Brewer or MoPac simultaneously, or that he was sub-servant of Brewer that was in turn a servant of MoPac. We agree.
In reviewing “no evidence” points, the court of appeals will consider only the evidence and inferences tending to support the jury verdict and disregard all evidence to the contrary and will affirm the judgment if there is any evidence of probative value to support the verdict in a jury tried case.
International Bank, N.A. v. Morales,
It is undisputed that Brewer was plaintiff’s general employer. To establish a case of liability against a railroad under the FELA, a claimant must demonstrate, first, that he was an “employee” of the railroad under applicable common-law principles. The United States Supreme Court has laid down the following rule in
Kelley v. Southern Pacific Co.,
Under common-law principles, there are basically three methods by which a plaintiff can establish his “employment” with a rail carrier for FELA purposes even while he is nominally employed by another. First, the employee could be serving as the borrowed servant of the railroad at the time of his injury. See Restatement (Second) of Agency § 227; Linstead v. Chesapeake & Ohio R. Co.,276 U.S. 28 [48 S.Ct. 241 ,72 L.Ed. 453 ] (1928). Second, he could be deemed to be acting for two masters simultaneously. See Restatement § 226; Williams v. Pennsylvania R. Co.,313 F.2d 203 , 209 (CA2 1963). Finally, he could be a sub-servant of a company that was in turn a servant of the railroad. See Restatement § 5(2); Schroeder v. Pennsylvania R. Co.,397 F.2d 452 (CA7 1968).
See also Zarate v. Brownsville Nav. Dist.,
Second, the claimant must also prove that he was engaged in the furtherance of
*72
the railroad’s interstate commerce activities at the time of his injury.
Lowery v. Illinois Cent. Gulf R.R.,
The Fifth Circuit has put the relevant inquiry as follows:
... [UJnder the FELA a worker can be the “employee” of the railroad even though carried on the employment rolls of another company and paid by that other company. The test of employment ... is whether the railroad has control of the employer or the right to control the employee. The law does not require that the railroad have full supervisory control. It requires only that the railroad, through its employees, plays a “significant supervisory role” as to the work of the injured employees.
Lindsey v. Louisville & Nashville R.R.,
As has been noted, in the instant case the Fibre Optics Agreement between MoPac and Sprint expressly provided that MoPac would have no control over the employment, discharge, compensation of or services rendered by Sprint’s employees, contractors and subcontractors; that Sprint should be and remain an independent contractor; and that MoPac would not be responsible for the clearing or removal of trees, shrubs, plants or debris from that portion of its right-of-way leased to Sprint.
It is established law that contractual provisions such as these are conclusive upon the issue of right of control, obviating the necessity of any further factual consideration of the right to control the details of plaintiff’s work.
J.A. Robinson Sons, Inc. v. Wigart,
It is clear Texas law that where there is a contract between the general and special employer which resolves the question of the employment status, then the factual consideration of the right to control the details of the work is unnecessary. Producers Chemical Co. v. McKay,366 S.W.2d 220 (Tex.1963); Magnolia Petroleum Company v. Francis,169 S.W.2d 286 (Tex.Civ.App.—Beaumont 1943, err. ref.).
Sanchez,
Absent such a contract, the courts review the facts to determine whether the general employer or the special employer had the right to control the employee’s activities.
McKay,
A case that is similar with respect to whether the employee in question in a borrowed servant is
Magnolia Petroleum Co. v. Francis,
*73 [[Image here]]
Of further significance is the fact that the kinds of control which MoPac did contractually retain were not the kinds which would give rise to an employment relationship. Thus, an owner’s rights to,
inter alia,
enter the property; inspect the work; take possession or use of any completed or partially completed part of the work; specify the kinds and amount of insurance which its contractors should carry; require that the work be inspected and approved by the owner’s own supervisor; or even specify the details of the project, do not constitute the kinds of control which give rise to an employment relationship under the FELA.
Zarate v. Brownsville Nav. Dist.,
Even where the courts have been called upon to determine the right of control issue in the absence of dispositive contract provisions such as those at bar, they have been careful to distinguish between the kind of control which is merely exercised “in the interests of cooperation and safety” and the “authoritative direction and control” which is necessary to establish an employment relationship. The Supreme Court of Texas noted in
J.A. Robinson Sons, Inc. v. Wigart,
As we said in the Producers Chemical case, ‘we must carefully distinguish between authoritative direction and control, and mere suggestion as to details or necessary cooperation, where the work furnished is part of a larger undertaking.’366 S.W.2d at 226 .
This distinction is recognized by the United States Supreme Court to be equally applicable in FELA cases.
See Kelley,
In keeping with its obligation to distinguish between “authoritative direction and control” and those activities which merely constitute “necessary cooperation where the work furnished is part of a larger undertaking,” the United States Supreme Court held that the above-related activities and responsibilities of the railroad did not constitute the kind of control necessary to make Kelley the railroad’s borrowed, dual or sub-servant.
Id.
at 329,
The Court then concluded in
Kelley
that where the character of the contacts between the railroad and persons working on its premises are merely such as to reveal the accommodation and coordination which are clearly necessary to a large operation, FELA “employment” status will not be recognized.
Id.
In the cases decided since
Kelley
which have discussed the factors necessary to the “immediate control and supervision” deemed necessary by the Supreme Court, the courts have held that the issue of control should turn upon such factors as whether: 1) the railroad’s supervisory personnel determined the number of employees which a contractor could have; 2) approved or disapproved all wages and salaries; 3) decided what tools, materials and supplies should be purchased by the con
*75
tractors and used by their employees; 4) determined what cost items would be approved, with full accounts to be furnished to the railroad; 5) whether the title to all tools and materials vested in the railroad or the contractor; 6) whether the railroad retained substantially full control over the work; 7) whether such work was an integral part of the railroad’s own operations; and 8) whether the contract between the railroad and the contractor required the railroad to control and supervise all such activities.
See, generally, Turpin v. Chicago, Burlington & Quincy R.R. Co.,
The record in the instant case is void of any evidence that MoPac exercised the kind of control considered necessary by the courts to fall within the parameters of FELA coverage; it demonstrates that the only control exercised was the kind which is necessarily exercised “in the interest of cooperation,” an interest repeatedly emphasized throughout the contract, stemming from the multiple right-of-way uses which were mandated by law. Specifically, there is no evidence that MoPac approved or disapproved the wages and salaries paid by Sprint and its subcontractors, decided what equipment, tools, materials or supplies should be purchased or used, or determined what cost items should be approved. Mo-Pac had no title to any of the equipment used by Sprint or its subcontractors, and did not supervise and/or control their activities within the meaning of those terms as used by the Supreme Court in Kelley, nor were the activities of Sprint or its subcontractors an integral part of the railroad’s own operation. Although Steven Waits, MoPac’s “designee,” was charged with coordinating MoPac/Sprint right-of-way usage, he was only responsible for protecting MoPac’s interests and making sure that no worker came in contact with the railroad operation.
Thus, while the danger to the workers from contact with the trains and protection of the Railroad’s right-of-way were of concern to MoPac — for which reason it held safety meetings with the employees of the subcontractors to inform the workers of the dangers of working around the tracks and how to protect the right-of-way — his authority to stop the work was confined to situations in which the structure of the track or movement of the trains might become jeopardized.
There was no evidence that MoPac exercised any greater degree of control than that necessary to fulfill its contractual right and obligation to insure the integrity and safety of its own transportation activities and to insure that Sprint’s activities did not in any manner jeopardize same. This did not amount to the authoritative control necessary to render the Plaintiff MoPac’s borrowed, dual or subservant.
It is undisputed that MoPac, a common rail carrier, was engaged in interstate commerce. However, as has been stated, plaintiff, as an FELA claimant, was also required to prove that he was employed with duties furthering such commerce, and that he was injured while so employed. It is in light of this requirement that plaintiff’s relationship to MoPac must be examined: plaintiff was an employee of a brush and debris-cleaning subcontractor (Brewer), which contracted with a cable-laying general contractor (Crawford), which contracted with a fibre optics telephone company (Sprint), which contracted to use a portion of MoPac’s right-of-way upon which to lay its cable. The record is utterly devoid of any evidence that Sprint (or its contractors) was ever engaged in the furtherance of MoPac’s interstate commerce activities as opposed to those of Sprint.
Plaintiff relied at trial upon the proposition that, although his duties may not have been in furtherance of MoPac’s own interstate activities, they were in furtherance of Sprint’s fibre optic cable business, in which MoPac participated by 1) maintaining a supervisory role over the laying of the fibre optics cable, and 2) by “making money” *76 from the lease of its right-of-way to U.S. Sprint. We do not agree.
Aside from the fact that such theory, even if sound, would fail to satisfy the requirement that a FELA claimant’s work have been in furtherance of a railroad’s interstate transportation activities, the theory is itself intrinsically flawed, depending as it does upon insupportable premises that: 1) MoPac had supervisory control over the laying of the cable; and 2) that a landowner may be deemed to be “engaged in interstate commerce” by merely receiving consideration for the lease of its right-of-way to one who is “engaged in interstate commerce.” It should be remembered that Sprint is a preferred class of utility with a right to condemn, if necessary, the right of way in question. Tex.Rev.Civ.Stat.Ann. arts. 1416, 1417 (Vernon 1980);
Mellon v. Southern Pacific Transport Co.,
In short, neither the responsibilities nor the benefits accruing to MoPac under the fibre optic agreement caused it to be engaged in Sprint’s interstate commerce activities. Even had MoPac somehow become so “engaged,” the FELA was not enacted to cover persons injured while in the furtherance of such activities; rather, it was enacted to cover injuries occurring in the furtherance of the business of interstate rail transportation.
Edwards v. Pacific Fruit Exp. Co.,
Plaintiff argues in his brief he “never found a railroad tie which had not been placed within this ‘strip’ from which he had to clear brush and clear cut”; he was, therefore, “forced by MoPac to remove the ties, along with his co-worker,” and that plaintiff, “doing traditional railroad work in the removal of replaced railroad ties along a section of railroad which crosses state lines was properly an employee for FELA purposes.” We disagree.
Plaintiff further argues in his brief that: MoPac’s attack on the sufficiency of the evidence to establish that plaintiff was an employee of MoPac ignores the expert testimony of Dr. Vaughn Paul Adams, who has undergraduate degrees in mechanical engineering design, an M.S. in industrial engineering, and a Ph.D. from the Industrial Engineering Department of Texas A & M; that he is an expert in safety and human factors engineering who testified that plaintiff was the employee of MoPac at the time of the accident, and stated: My opinion is that for the purpose of job safety and job health, that the employee/employer of Mr. Buen-rostro at the time of the accident then was the railroad.
Plaintiff further argues that Steven Waits, MoPac’s Engineering Inspector of Fibre Optics, had the right to order someone like plaintiff to clear brush and pick up debris, as evidenced by Dr. Adams’ answer to the question:
Q. Do you know whether or not he [Waits] had the right to actually tell someone like Mr. Buenrostro how to clear brush? Did he have the right pursuant to the contract?
A. As I read it, yes, he did.
Plaintiff concludes that, “according to Dr. Adams,” MoPac, through Waits, had the right to tell employees of subcontractors what to do with respect to their ground movements, insofar as they involved health and safety, and that MoPac was in a position of superiority with respect to seeing to it that employees of all the subcontractors were acting in a safe and a reasonable way.
Under the Fibre Optics Agreement, Mo-Pac had the sole discretion to place watchmen, flagmen, inspectors or supervisors for the protection of the railroad if it deemed it advisable; had the right to disapprove Sprint’s selection of any contractor used on the project; and required Sprint and any subcontractors retained by Sprint to obtain specified insurance coverage with minimum limits. Plaintiff asserts that, according to Dr. Adams, these provisions in the Agreement demonstrated that MoPac had retained such a significant right of control so as to impose upon the railroad the obligation to exercise care with respect to the safety of plaintiff. Again, we disagree.
*77
Next, we turn to Dr. Adams’ testimony. His testimony is based on his interpretation of the Fibre Optics Agreement and his conclusion “that crossties are an integral post of the railroad’s interstate activities” has no probative value since he did not demonstrate any expertise in interpreting the FELA’s interstate requirement. Moreover, he is not qualified to assert that abandoned railroad ties left in an area of right-of-way which is later leased to a third party for purposes unrelated to railroading nonetheless constitute an integral part of a railroad’s ongoing interstate operations, or that the employee of a sub-sub-contractor of a telephone company somehow becomes engaged in a railroad’s interstate commerce by clearing a right-of-way on a railroad right-of-way to be used for interstate telephone services. Such assertions are contrary to established authority relative to what constitutes interstate railroading activities for purposes of the FELA.
Cf. Edwards v. Pacific Fruit Express Co.,
It is settled law that a witness who, by his knowledge, skill, experience, training, or education, has specialized knowledge that will assist the trier of fact to understand the evidence or determine a fact question in issue, may express an opinion about the matter.
Trailways, Inc. v. Clark,
MoPac further contends in its tenth point of error that there is no evidence to support the jury’s finding in response to Special Issue No. 4 (that the negligence of MoPac proximately caused plaintiff’s injuries).
It is well settled that, in order to establish liability for negligent conduct, a plaintiff must prove that the defendant owed him a legal duty of care, the breach
*78
of which proximately caused his injuries.
Abalos v. Oil Development Co. of Texas,
The Supreme Court stated in Redinger: We will first consider whether a general contractor has a duty to a subcontractor’s employee, and, if so, whether there is evidence in this case that the duty was breached. An owner or occupier of land has a duty to use reasonable care to keep the premises under his control in a safe condition. Smith v. Henger,148 Tex. 456 ,226 S.W.2d 425 (1950). A general contractor on a construction site, who is in control of the premises, is charted with the same duty as an owner or occupier. Id.,226 S.W.2d, at 431 . This duty to keep the premises in a safe condition may subject the general contractor to direct liability for negligence in two situations: (1) those arising from a premises defect, (2) those arising from an activity or instrumentality. J.A. Robinson Sons, Inc. v. Ellis,412 S.W.2d 728 (Tex.Civ.App.—Amarillo 1967, writ ref’d n.r.e.); Moore v. Texas Company,299 S.W.2d 401 (Tex.Civ.App.—El Paso 1956, writ ref’d n.r.e.). This is not a premises defect case. Rather, this case involves an injury caused by an activity conducted on the premises.
Redinger,
The Court further observed that the general rule “is that an owner or occupier does not have a duty that an independent contractor performs work in a safe manner,” citing
Abalos v. Oil Development Co.,
[W]here the activity is conducted by, and is under the control of, an independent contractor, and where the danger arises out of the activity staff, the responsibility or duty is that of the independent contractor, and not that of the owner of the premises ...
In the instant case, plaintiff clearly staked his second claim upon a premises liability theory of recovery which alleged that he was injured as a result of a dangerous premises condition — i.e., that MoPac was allegedly negligent “in failing to foresee the inevitable result of the continued failure to correct and/or maintain a dangerous condition on the premises.” He did not allege that MoPac’s liability arose out of an activity conducted on the premises.
In
Prestwood v. Taylor,
In the present case, the duty in question may not be imputed to Prestwood unless the evidence shows that she was a “possessor” of the premises wherein the elevator was situated. Restatement (Second) of Torts §§ 342 and 343. The word “possessor” has a technical meaning in this context. Prestwood would not necessarily be a “possessor” of the premises, upon whom liability could be predicated, owing to the fact that she held legal title to the premises or the legal right to immediate possession. Cameron County v. Velasquez,668 S.W.2d 776 (Tex.App.1984, writ ref'd n.r.e.); see also Hernandez v. Heldenfels,374 S.W.2d 196 (Tex.1963). Instead, the legal status of “possessor” is a conclusion inferred from certain other underlying facts that must themselves be proved. These are set out in § 328E of the Restatement, which defines “possessor” as any of the following:
(a) a person who is in occupation of the land with intent to control it, or
(b) a person who has been in occupation of the land with intent to control it, if no other person has subsequently occupied it with intent to control it, or
(c) a person who is entitled to immediate occupation of the land, if no other person is in possession under clauses (a) and (b).
Prestwood,
Thus, according to Prestwood, where a lessor transfers to his lessee the right of possession, and the lessee occupies the land with the intent to exercise the right of control given him in the lease contract, “the lessor’s liability for dangerous conditions on the premises terminates with such a transfer of possession to the lessee.” See also Restatement (Second) of Torts §§ 355, 356.
In order to be entitled to charge MoPac with a duty of care, it was therefore incumbent upon plaintiff to adduce evidence as to all the essential elements of at least one of the said definitions of the word “possessor.” Just what evidence of “control” is necessary to show that a landlord is a “possessor” of premises within the meaning of Restatement (Second) of Torts § 328E is therefore highly relevant. To begin with, “[t]he ‘control’ which a landlord must intend to exercise is physical control or control in a factual sense.”
In concluding that the landlord in Prest-wood did not have such “control,” the court held that even the landlord’s retention of the means of controlling access to the premises and the exercise of such access are insufficient to bestow upon him the “physical control” or “control in a factual sense” referred to in Restatement (Second) of Torts § 328E(a). In landlord/tenant situations, the sufficiency of the degree of control necessary to impose such a duty is thus governed by the intent of the landlord to exercise the kind of control set forth in Restatement (Second) of Torts § 328E.
In the instant case, there was no evidence adduced that MoPac retained the kind of control which would indicate an “intent to possess” the portion of the right-of-way which it had leased to Sprint within the meaning of Restatement (Second) of Torts § 328E. The evidence demonstrated that, at the time Sprint leased the right-of-way from MoPac, the latter retained only the right to keep Sprint from interfering with the ongoing rail transportation activities which MoPac was conducting on its own, not in Sprint’s portion of the right-of-way.
Thus, MoPac did not, as an initial matter, have a duty of care with respect to that portion of the right-of-way which it had leased to Sprint, and the plaintiff, whether intending to assert the existence of a dangerous premises condition as pleaded, or that MoPac had a duty to control Sprint’s construction activities on the premises, failed to satisfy the threshold requirement *80 that MoPac have been the “possessor” of the premises. Accordingly, he failed to meet his burden upon his premises liability claim.
Regarding plaintiffs specific assertion that MoPac was negligent
"...
in failing to foresee the inevitable result of the continued failure to correct and/or maintain a dangerous condition on the premises,” assuming for the sake of argument that plaintiff had met his burden of proving that MoPac was the “possessor” of Sprint’s portion of the right-of-way, there was no evidence whatsoever that a dangerous “condition” existed on the same, that such condition was unknown to plaintiff, or that the same caused plaintiffs injury. On the contrary, all of the evidence showed that plaintiffs injury was sustained while he was lifting a railroad crosstie, the existence of which he was fully aware. There was, moreover, no evidence that the presence of the railroad crossties posed a dangerous condition on the premises requiring MoPac to warn of their presence.
See, e.g., Tanner v. BDK Production Co.,
Having failed to prove that the railroad crossties in question posed a dangerous condition on the premises requiring MoPac to warn of their presence, or that he was unaware of the existence of such condition, plaintiff failed to sustain his burden of demonstrating that he was, as alleged, injured by MoPac’s failure to correct and/or [maintenance of] a dangerous condition on the premises.
As hereinbefore noted, MoPac did not retain any right to control the work being done by Sprint and its contractors. The only “control” retained by MoPac pertained to its legal duty, as a railroad common carrier, to ensure that the work of laying the fibre optic cable did not interfere with its own rail transportation activities which were being conducted on the portion of the premises which it had not leased to Sprint. There is no evidence that MoPac had the right to halt or interfere with the fibre optic construction activities other than to prevent same from interfering with Mo-Pac’s own transportation activities. Neither the viability of the cable, the integrity of the construction activities, nor the safety of Sprint’s workers were the responsibility of MoPac. The sole responsibility of Mo-Pac was to insure that Sprint’s work did not adversely effect MoPac’s own rail transportation activities on the adjoining portion of the premises which had been reserved to its sole and exclusive use.
This case is, therefore, clearly distinguishable from situations which occur in cases such as
Pollard v. Missouri Pacific R.R. Co.,
Accordingly, MoPac did not fall within that category of landowners who, by retaining some right of control over construction integrity of worker safety, retain also a duty to exercise such control carefully.
*81
See, e.g., Exxon Corp. v. Quinn,
Since there is no evidence to support the jury’s responses to Special Issues Nos. 1 and 4, we conclude that the judgment of the trial court must be reversed and judgment rendered that plaintiff take nothing by his suit. Therefore, it is not necessary that we reach MoPac’s remaining points of error.
The judgment of the trial court is reversed and judgment is rendered that plaintiff take nothing by his suit against Missouri Pacific Railroad Company d/b/a Union Pacific Railroad Company.
Notes
. 45 U.S.C. §§ 51-60.
. In the words of plaintiffs own expert, MoPac’s concerns under its fibre optics agreement were to see to it that fibre optics personnel were “kept away from oncoming train movements" and did not “cut ... other telecommunication companies’ lines which apparently occurred on a couple of occasions.”
. The pain was later diagnosed as a hernia and lower back injury.
. Although plaintiff could not recall at the time of trial exactly when his injury occurred, he did remember that it occurred between September and December of 1987. A worker’s compensation insurance claim form filed by him stated that he was injured on December 8, 1987, while removing an old wooden track tie from the right-of-way.
.Plaintiff did not allege the specific date of his injury in any of his petitions. However, MoPac did not except to that omission and the evidence shows that plaintiff suffered an injury to his back on November 29, 1989 and to his abdomen on December 8, 1987.
. Plaintiffs Original Petition, filed on August 13, 1990, alleged in substance, that his injury occurred on or about September 30, 1987, a date manifestly more than two years prior to the filing of the Petition. Plaintiff did not allege any fact or circumstance which might operate to toll the applicable two-year limitation period.