Plaintiffs appeal as of right the circuit court’s judgment granting the motion of West Detroit Building Company, Inc., for summary disposition pursuant to MCR 2.116(C)(7) on the basis of the statute of limitations. We affirm.
West Detroit, a general contractor, built the Ping On Restaurant, which plaintiff Kwok Hin Gee opened for business on July 1, 1980. On April 24, 1988, the roof of the restaurant collapsed, allegedly because of defective roof trusses. Kwok Hin Gee and Michigan Millers Mutual Insurance Company, as subrogor of Gee to the extent of its insurance payments, filed suit against West Detroit for negligence and breach of contract on August 29, 1989. On March 8, 1990, West Detroit filed a third-party complaint against Bergeron Corporation, formerly known as Century Truss Company, and National Lumber Company, seeking indemnity based on negligence, breach of warranty, and breach of contract for any liability that might arise out of the claims made by plaintiffs against it. Bergeron was the manufacturer of the wooden trusses used in the construction of the restaurant, and National Lumber was the wholesaler that sold these trusses to West Detroit. Subsequently, on July 17, 1990, National Lumber filed a motion for summary disposition pursuant to MCR 2.116(C)(7) against West Detroit on the ground that West Detroit had failed to file its claim against National Lumber within six years after the date of occupancy of the completed improvement and, therefore, the claim was barred by MCL 600.5839(1); MSA 27A.5839(1). On July 27, 1990, West Detroit filed a motion for supamary *370 disposition against plaintiffs pursuant to MCR 2.116(C)(7), likewise on the ground that plaintiffs’ alleged cause of action was barred by MCL 600.5839(1); MSA 27A.5839(1). In an opinion and order dated August 10, 1990, the circuit court granted West Detroit’s motion for summary disposition on the ground that plaintiffs failed to bring suit within the time prescribed by MCL 600.5839(1); MSA 27A.5839(1). A judgment dismissing this case was entered on September 5, 1990.
When reviewing a motion for summary disposition pursuant to MCR 2.116(C)(7), this Court must accept the plaintiff’s well-pleaded allegations as true and construe them in favor of the plaintiff.
Beauregard-Bezou v Pierce,
West Detroit’s motion for summary disposition is based upon the six-year period of limitation for actions against architects, professional engineers, or contractors arising from improvements to real property found in MCL 600.5839(1); MSA 27A.5839(1), which provides:
No person may maintain any action to recover damages for any injury to property, real or personal, or for bodily injury or wrongful death, arising out of the defective and unsafe condition of an improvement to real property, nor any action for contribution or indemnity for damages sustained as a result of such injury, against any state licensed architect or professional engineer performing or furnishing the design or supervision of construction of the improvement, or against any contractor making the improvement, more than 6 years after the time of occupancy of the completed improvement, use, or acceptance of the improvement, or 1 year after the defect is discovered or should have been discovered, provided that the defect constitutes the proximate cause of the in *371 jury or damage for which the action is brought and is the result of gross negligence on the part of the contractor or licensed architect or professional engineer. However, no such actions shall be maintained more than 10 years after the time of occupancy of the completed improvement, use, or acceptance of the improvement.
This statute, which was amended by
Plaintiffs argue that the trial court erred in dismissing their complaint on the ground that their claims were time-barred as a matter of law by § 5839(1) because that statute does not apply to claims seeking damages for deficiencies in the improvement to real property itself. Plaintiffs cite
Marysville v Pate, Hirn & Bogue, Inc,
Both defendant West Detroit and third-party defendant National Lumber contend that the decisions by this Court in the cases cited above were effectively overruled by the enactment of
The period of limitations for an action against a state licensed architect, professional engineer, land surveyor, or contractor based on an improvement to real property shall be as provided in section 5839.
The question presented in this case is whether the Legislature’s enactment of § 5805(10) overrules this Court’s interpretation. of § 5839 in the cases mentioned above and requires the application of the limitation periods specified in § 5839(1) to all actions against a contractor based on an improvement to real property.
The primary purpose of courts in interpreting statutes is to discover and give effect to the intent
*373
of the Legislature.
State Treasurer v Wilson,
Statutes must be interpreted as a whole,
Stowers v Wolodzki,
Statutes of limitation should be fairly construed to advance the policy that they are designed to promote and should not be defeated by an overstrict construction.
Buzzn v Muncey Cartage Co,
In this case, the language of the statute in question is not clear and unambiguous, because reasonable minds could differ concerning whether § 5805(10) clearly specifies the applicable limitation period. We note that unlike the other subsections in § 5805, which list the applicable limitation periods for claims of injury to persons or property, subsection 10 does not provide a specific limitation period but simply refers to § 5839(1) for the applicable limitation periods. It is the placement in § 5805 of the amendment that refers to another statute that creates an ambiguity, lending itself to two possible interpretations. Under one interpretation, the language of § 5805(10) stating that the period of limitation for an action against a contractor "based on an improvement to real property shall be as provided in section 5839” is viewed to be nothing more than a clarification, i.e., it lets everyone know where to look in the case of contractor liability and does not modify § 5839(1). Contrary to defendant’s assertion, we do not believe that this interpretation renders the language of § 5805(10) nugatory.
However, the language of § 5805(10) may be construed to do more than simply direct us to § 5839(1). Under this alternative interpretation, *375 the language may be construed as showing the intent of the Legislature to change the prior judicially created exemptions and, thereafter, to include damage claims by those with privity as well as injured third parties. Given that reasonable minds could differ concerning whether the Legislature, by adding § 5805(10), intended to modify the limitation period for claims against contractors set forth in § 5839(1), we conclude that judicial construction of § 5805(10) is proper.
In light of the ambiguity created by the placement of the amendment in § 5805(10), it is appropriate to review the legislative history of the statute in order to determine the underlying intent of the Legislature.
Luttrell v Dep’t of Corrections,
*376 The bill would ensure that, in future claims against engineers, architects, and contractors, the interpretation of the dissenting judge in the Burrows case would prevail. Architects, engineers, and contractors should be protected from suits charging malpractice or negligence in building improvements after a significant time has passed since the actual performance of the work. It is unfair for these professionals to be vulnerable to lawsuits years after a project has been completed, and State law already offers protection against such vulnerability for injuries "arising out of the defect or unsafe condition of an improvement to real property.” Reportedly, the Legislature meant that protection to include all suits brought against architects, engineers, and contractors for defects or unsafe conditions in an improvement to real property. The bill would ensure that such protection was extended to include suits claiming damages for defects in the improvement itself as well as those for damages "arising out of the defect.”
In his dissenting opinion in Burrows, a case involving an architect, Judge Burns asserted that the applicable statute of limitations was the special six-years-from-occupancy provision in § 5839. Judge Burns claimed that "this statute of limitation is specifically applicable to architects and, thus, controls over the more general malpractice or negligence statutes of limitation.” Burrows, supra, p 191. Disagreeing with the panel’s majority, Judge Burns rejected the distinction between a suit for injuries "arising out of’ a defect and a suit "for the defect itself,” because the statute specifically applies to recovery of damages for "any injury . . . arising out of’ a defect. Judge Burns further noted that "any harm to the improvement itself is harm which 'arises out of the defective condition of the improvement.” Id., p 192.
Although the Senate Fiscal Agency analyses do *377 not constitute an official statement of legislative intent, we note that they afford evidence that the Legislature’s intent in amending § 5805(10) was to set aside this Court’s holdings in the cases cited above and make applicable the limitation periods contained in § 5839(1) to all claims against contractors. Moreover, plaintiffs have offered nothing that conflicts with this construction of the Legislature’s intent in amending § 5805(10).
Contrary to plaintiffs’ assertion, we do not believe that failure of the Legislature to strike the "arising out of’ language of § 5839(1) while at the same time amending § 5805(10) to refer to § 5839(1) indicates that the Legislature consented to the accuracy and continued validity of this Court’s prior holdings. That the Legislature may have inartfully expressed its intent and could have chosen more suitable alternatives to accomplish its purpose does not alter the fact that the Legislature sought to set aside this Court’s holdings in Marysville, Midland, and Burrows.
Moreover, we do not believe, as urged by plaintiffs, that the application of the limitation periods of § 5839(1) to any case against a contractor involving an improvement to real property renders nugatory the "arising out of’ language of § 5839(1). Although the Legislature left intact the cited language of § 5839(1) when adding § 5805(10), the Legislature’s intent, as reflected in the Senate Fiscal Agency’s analyses of Senate Bill 478, was to explain that "arising out of’ did not exclude actions arising out of the defective and unsafe condition of the improvement itself but applied to any case "based on any improvement to real property.” Contrary to plaintiffs’ contention, this interpretation does not render the "arising out of’ language nugatory, but rather clarifies it.
Finally, plaintiffs’ argument that the Legisla *378 ture’s intent in amending § 5805 was to include contract actions within the "prospective ambit” of § 5839(1) is specious and inconsistent with their own arguments. According to plaintiffs, § 5839(1) is limited to tort actions and does not specifically include or exclude contract actions from its coverage. Because § 5839(1) refers to "any action to recover damages for any injury to property ... or for bodily injury or wrongful death,” it is clear that even before the addition of § 5805(10) it was not limited to tort actions, but, rather, included contract actions. If plaintiffs’ argument concerning the intent of the addition of § 5805(10) were correct, the amendatory language of that subsection would be rendered meaningless because the applicability of § 5839(1) to contract actions was never in question and needed no clarification. Moreover, plaintiffs’ argument in this regard is inconsistent with their contention that § 5839 does not apply to actions brought by an owner against a contractor, because the only party who will have a breach of contract action against a contractor is the owner.
Accordingly, we conclude that the Legislature’s intent in amending § 5805(10), as reflected in the Senate Fiscal Agency’s analyses of Senate Bill 478, was to apply the statute of limitation contained in § 5839(1) to all actions brought against contractors on the basis of an improvement to real property, including those brought by owners for damage to the improvement itself. See also Baiers, Statutes of Limitation Applicable to Architects, Engineers and Contractors in Michigan, 1989 DCL L R 25. Applying the periods of limitation in § 5839(1) to this case, we note that plaintiffs’ action against West Detroit is time-barred, inasmuch as they filed their complaint on August 29, 1989, more than six years after the use of the improvement and more than *379 one year after they discovered the alleged defect. Therefore, we affirm the circuit court’s judgment granting West Detroit’s motion for summary disposition pursuant to MCR 2.116(C)(7).
Affirmed.
Notes
Concerning plaintiffs’ breach of contract claim, plaintiffs acknowledge that the claim is time-barred because the claim was filed more than six years after it accrued. A breach of contract claim accrues on the date of the breach, not the date the breach is discovered. MCL 600.5807(8); MSA 27A.5807(8).