84 Kan. 302 | Kan. | 1911
The opinion of the court was delivered by
Meyer and wife brought this action against the city to recover damages to their residence property by reason of the alleged negligent manner in which the city graded the street — making a deep cut — upon which their property fronted, and, by reason of such negligence, alleged that the earth in front of their dwelling caved in and slipped and injured their property to the extent of $2000. The case was tried in the court of common pleas to a jury, and resulted in a verdict and judgment in favor of the plaintiffs for $1400. The city appeals.
There are twenty-one assignments of error, but only eight are argued in the brief. It is contended that the court erred in giving instruction No. 7, in which, after stating to the jury that the plaintiffs wereestopped from recovering damages by reason of the-grading of the street to the established grade, which was some distance below the surface line of their property, added the following: “and [you] are not to consider the same except in so far as the depth of the cut made in front of their said premises may have relation to any slipping or sliding of the earth, if any, in the-matter of the prosecution of the work of the grading in question.” It is said the quoted words instruct, inferentially, that if the depth of the cut had any relation to the slipping or sliding of the earth the plain-' tiffs might recover by' reason of the grading,' even if properly done. Taken alone, this instruction might be construed so to read. In other instructions the jury were told that the plaintiffs could not recover on ac
.“If you find from a preponderance of the evidence that the said defendant city let the contract to one Julius Turner to grade the street in question, and that the said contractor proceeded with said grading under the direction of the city engineer with all reasonable care and dispatch, and without any more delay than was reasonable, occasioned by reason of the frost and inclemency of the weather during the winter season, which prevented the prosecution of said work, and that such grading was done by the contractor in accordance with the request of the plaintiff in his petition to said city upon the line of the established grade of said street in front of plaintiffs’ said property, and the injury and damage to plaintiffs’ house, if any, was not occasioned by reason of any unreasonable delay in the prosecution of said work of grading by said contractor, then the plaintiff can not recover, and your verdict must be for the defendant city.”
It is contended that the court erred in giving instruction No. 12, in regard to the measure of damages, it being stated therein that if the jury found that the plaintiffs were entitled to recover they should “allow them such reasonable sum as the evidence shows they have been damaged, that is to say, such reasonable sum as the evidence shows will be required to repair said property and place it in the same condition in which it was immediately prior to the time of the happening of the injury and damage, if any, not exceeding the sum of $2000.” The jury had, under the order of the court, gone in a body to see the property, and there was much evidence as to the condition of the building. One witness, who qualified as an engineer, testified that in his opinion the damaged condition of the house was" due to the grading of the street; that the house was, at the time of trial, unsafe for habitation.
The plaintiffs produced evidence as to what would be necessary to put the house in as good condition, practically, as it was before, and furnished estimates of the cost, which evidence tended to show that it was necessary to rebuild the front of the house. The city offered no evidence to show that the cost of the proposed repairs would exceed the difference in the value of the property immediately before and after the injury, or that the house could be repaired so as to make it habitable and salable without rebuilding the foundation and front of the house. While, as before said, the rule laid down by the court as to the measure of
It is also contended that in instruction No. 11 the court shifted the burden of proof upon the city to show that the settling of the walls of the house was caused by improper construction or defective material, or some cause other than the alleged negligence of the city in the manner of the grading. While, as before said, this instruction, read alone, might be susceptible of the construction given it by the city, yet, if' read in connection with the other instructions, especially Nos. 2 and 3, which, in effect, tell the jury that, the burden of proving all of the facts necessary to their recovery rests upon the plaintiffs, we think the jury were not misled. It may also be said there was substantially no evidence of any defect in the foundation wall o.r of any other cause for the settling of the-walls than 'the slipping or sliding of the earth.
Again, it is contended that instruction No. 8 assumes, to cover the entire law of the case, and omits some matters that should have been included therein. We do not think' that it is true that this instruction assumes to cover the entire law of the case. There were numerous instructions, and, all read together, as they should be, they seem to be fair and to include no substantial error.
•The remaining objections and the. brief relating thereto go to the discussion of the introduction and admission of evidénce, and to the credibility of wit-* nesses. We have read the evidence and the objections, and find nothing calling for special mention, and think that no substantial error was committed.
The judgment is affirmed.