METROPOLITAN WATER DISTRICT OF SALT LAKE & SANDY, Appellant, v. ZDENEK SORF, Appellee.
No. 20160756
Supreme Court of the State of Utah
Filed June 11, 2019
2019 UT 23
This opinion is subject to revision before final publication in the Pacific Reporter
On Direct Appeal
Third District, Salt Lake
The Honorable Robert P. Faust
No. 100921025
Attorneys:
Shawn E. Draney, Scott H. Martin, Danica N. Cepernich, Rodney R. Parker, Salt Lake City, for appellant
Paul M. Belnap, Bradley W. Bowen, Alan R. Houston, Salt Lake City, for appellee
CHIEF JUSTICE DURRANT, opinion of the Court:
Introduction
¶1
Background
¶2 Metro owns and operates the SLA. The SLA transports water from the Deer Creek Dam to the Salt Lake Valley. Along the SLA corridor, Metro owns some property in fee and has easements over other portions. Mr. Sorf owns property encumbered by a Metro district easement. This easement was created by deed in 1946 by Elizabeth Colemere, the former property owner. This deed provides Metro an easement 125 feet wide “to construct, reconstruct, operate and maintain a pipeline or pipelines on, over and across” the property.
¶3 Metro also claims that, under
¶4 Without Metro‘s approval, Mr. Sorf began making improvements to his property.2 He removed some trees and landscaping and replaced them with a hot tub and gazebo. He added garden boxes, a water feature, and a shed. All of these improvements fall within the boundaries of Metro‘s easement. Mr. Sorf also replaced a cinder block wall with a wood fence and installed a gate in the fence to give Metro access. He installed another gate between his backyard and his neighbor‘s backyard to provide additional access.
¶5 Metro filed suit in October 2010, seeking to enjoin Mr. Sorf‘s construction and receive a declaration about its authority to remove the improvements. Mr. Sorf defaulted, appealed to this court, and we vacated the denial of his motion to set aside the default judgment.3 Mr. Sorf later filed an answer and counterclaim in the district court. Metro filed a motion for partial summary judgment, seeking a declaration that it had the regulatory authority it claimed. Mr. Sorf filed a cross-motion for summary judgment, claiming that Metro‘s claims were not ripe “because whether [Mr. Sorf] has violated [Metro‘s] easement rights or [Metro‘s] necessary rules and regulations cannot be determined until such time as [Metro] has an actual need to refurbish or replace the pipeline.”
¶7 Metro appealed the district court‘s order. We have jurisdiction pursuant to
Issues and Standard of Review
¶8 We must determine whether the parties’ issues are ripe for resolution. We “review the [district] court‘s legal determination of ripeness under a correction of error standard.”4
Analysis
¶9 First, because we find that the parties’ claims are ripe, we conclude that the district court erred in granting summary judgment based on ripeness. And because the district court did not conduct the proper analysis of the parties’ respective rights to the easement, we remand to the district court for proceedings consistent with this opinion.
¶10 Although the district court‘s order contains some discussion about the rights of the parties, it ultimately dismissed the parties’ claims on ripeness grounds. “A dispute is ripe when a conflict over the application of a legal provision has sharpened into an actual or imminent clash of legal rights and obligations between the parties thereto.”5 On the other hand, “[a]n issue is not ripe for appeal if there exists no more than a difference of opinion regarding the hypothetical application of a provision to a situation in which the parties might, at some future time, find themselves.”6
¶11 But this is not a hypothetical situation. Mr. Sorf has made improvements to his property. Metro alleges it has the regulatory authority to prevent him from doing so without its approval and to force him to remove the structures from the property. The district court did not actually reach the issue of whether Metro has the regulatory authority it claims. Rather, it assumed that Metro had some power but that its power was limited by what is “necessary” for its operations. The district court then found that it could not determine what was “necessary” because Metro did not yet have a plan for future reconstruction of the SLA. Whether Metro has the regulatory authority it claims is, in part, determinative of whether it is entitled to injunctive relief against Mr. Sorf. If Metro does have this authority, Mr. Sorf has violated valid Metro district regulations, and Metro may seek a remedy. So the question of whether, and to what extent, Metro has the regulatory authority it claims is ripe for adjudication.
¶12 Additionally, even if Metro does not have this regulatory authority, the question of whether Mr. Sorf‘s additions to the property encroach upon Metro‘s property rights remains. Metro has an easement that allows it “to construct, reconstruct, operate and maintain a pipeline or pipelines on, over and across” a portion of Mr. Sorf‘s property. The aqueduct has been constructed, the aqueduct remains operational, and Metro does not suggest that any of Mr. Sorf‘s repairs have interfered with the actual operation of the aqueduct underground. But the question is not whether Mr. Sorf has “unreasonably interfere[d] with the aqueduct.” Rather, the question is whether Mr. Sorf has unreasonably
¶13 This is not a speculative inquiry. Although Metro‘s unspecified plan to reconstruct the aqueduct sometime in the future may be speculative, there is a live dispute regarding whether Mr. Sorf‘s improvements have unreasonably interfered with Metro‘s property rights. Metro has established rights based on an express easement. If Mr. Sorf has infringed upon that easement, Metro has a right to remedy that infringement. So the district court on remand must determine what the parties’ respective rights and obligations to the property are.
¶14 In sum, the parties are both entitled to a determination of whether these additions are permissible, and if not, a determination of the proper remedy. Although Metro‘s future plans for modification and maintenance of the aqueduct may be speculative, both Metro and Mr. Sorf have present, existing rights in the property at issue. Mr. Sorf owns the property in fee and Metro has a right to an easement on the property.8 So an actual clash of legal rights and obligations exists between the parties, and their claims are ripe.
Conclusion
¶15 The district court erred in finding that the parties’ claims were not ripe. And by failing to fully address the parties’ claims, the court missed a critical piece of the analysis regarding whether Mr. Sorf‘s use of his land violated either Metro‘s regulations or the parties’ respective easement rights. Because Mr. Sorf and Metro have present and competing interests in the land at issue, and Metro claims Mr. Sorf is currently violating its alleged regulatory authority, the issues presented in this case are ripe. We reverse and remand for additional proceedings.