108 Cal. 68 | Cal. | 1895
Appeals from the judgment and from the order denying a new trial.
The action was for an injunction. Plaintiff alleged that he was “ the owner of a right of way, and in particular for the purpose of laying a pipe line and the erection of a dam, and the construction of ditches, and for the doing of any work necessary for the diversion of the water flowing in the Verdugo creek, over the following described land.” The land is then described. Next follows a description of the “particular right of way” claimed, which commenced at “ the point where the dam constructed by the plaintiff in 1892 was situated,” and extends over and across the land of defendants to the point where “ said pipe line constructed by plaintiff in 1892 crossed the northeasterly line of defendants’ land.”
Plaintiff then avers the interference of defendants, their preventing him “from entering upon said land and from using his right of way for the purposes aforesaid,” and his damage, and prays “that his right of way over the land described in his complaint, and in particular for ditches, dams, and pipe lines, for the purpose of diverting the water from the said Verdugo creek,
, The defendants for answer made denial, and the facts as disclosed by the evidence and found by the court proved to be that the land upon which the dam was to be constructed and the ditches dug, and over which the pipes were to be laid, was the separate property of the wife of defendant George Engelhardt. In 1891 the husband, without authority from his wife, attempted to convey, by instrument in writing to plaintiff, the right “to build a dam and make a ditch in the Verdugo creek, and on my north line as near as possible from the northeast corner, about two hundred feet, more or less, providing said dam and ditch will not interfere with any private entrance.”
In April, 1892, the Engelhardts, husband and wife, granted to plaintiff “the right of way over their land for all purposes, and also the right to use a certain, water ditch, now existing on the place, to run his own water along with theirs, or to build new ditches, and so forth.”
Under these instruments plaintiff assumed the right ta construct a dam upon defendants’ land, obstructing the natural flow of the creek waters, and to lay a pipe line to conduct these waters to his lands; and, in 1892, entered upon the lands, and, with the assistance of George Engelhardt, built a dam and laid his pipe line at an expense of two thousand dollars. The dam was injured by the floods of the following winter, and in 1893 plaintiff again attempted to enter upon defendants’ land to relay his pipes and rebuild the dam, when he was forcibly prevented by defendants.
Mrs. Engelhardt testified that her husband had no-, authority to execute the first attempted grant to plaintiff, and that she did not know of the dam until after it. was constructed. She declared that- she did not object to plaintiff’s digging a ditch or laying pipes across her land to take his own water from the creek, but did
Under this evidence plaintiff would not be entitled either to build such a dam on defendants’ land or to appropriate any of the waters of the creek rightfully belonging to defendant Jesus de Engelhardt, and the court so concluded. The husband was not shown to be the agent of the wife, nor was she bound to allow the maintenance of a dam against the construction of which she protested, nor the appropriation of her water by means of it.
The difficulty arises solely in construing the findings, which it is contended are inconsistent with themselves, do not support the conclusions and decree, and do not entitle plaintiff to the relief sought.
It. will be noticed that the complaint does not in terms aver a right in plaintiff, by grant, appropriation, or prescription, to divert the waters of the creek upon defendants’ land, but somewhat curiously pleads a right of way for the doing of any work necessary for such diversion. Plaintiff is the owner of a tract of land bordering upon the creek above the lands of the Engelhardts. He diverted the water upon this upper land and carried it by ditch across defendants’ land onto his lower tract. The easement granted gave him the right to. construct new ditches or pipe lines for this purpose, but under it he wrongfully asserted the right, as has been seen, to dam the creek upon defendants’ land and make there a new point of diversion. By the decree he was given all to which he was justly entitled.
The alleged ambiguity or inconsistency in the findings is not sufficient to justify a reversal of the case. The court first finds, with much particularity, the right of way and the nature, and extent of the easement to which plaintiff is entitled. It is a right of way for the purpose of transporting plaintiff’s water across defendants’ land, and not a right of way for the construction of a dam. The defendants are found to have interfered with plaintiff in the enjoyment of his easement. And
The judgment and order are affirmed.
Temple, J., and McFarland, J., concurred.
Hearing in Bank denied.