Opinion
Virginia Merz appeals from a judgment denying her petition for writ of mandate, in which she sought to compel the Board of Supervisors of the County of Monterey (the Board) to set aside its approval of the reconstruction of the Carmel Valley Road/Robinson Canyon Road intersection. The principal issue in her appeal is whether the Board abused its discretion in adopting a “negative declaration” rather than requiring an environmental impact report prior to approving the project. She also contends the evidence is insufficient to support the Board’s finding that the project was consistent with the county’s general plan. Respondents are the Board and real party in interest Carmel Valley Ranch, Inc. (CVR).
I
In January 1975, CVR sought approval from the County of Monterey for a specific plan for the development of a residential and resort lodge complex in Carmel Valley. In conjunction with the application, an environmental impact report was prepared and certified as complete by the Board. The report addressed the growth-inducing impact of the project, as well as the impact on traffic of its full development, and pinpointed the Carmel Valley *936 Road/Robinson Canyon Road intersection as a major concern. The Board approved the Carmel Valley Ranch Specific Plan in 1977. Among conditions of its approval was a requirement that the developer enter into an agreement with the county to financially participate in both reconstruction of the intersection, and construction of Carmel Valley Road to four lanes between Via Petra and Robinson Canyon Road.
Pursuant to that agreement, CVR prepared design alternatives for the intersection. Before the Board decided upon the alternative at issue in this case, which includes a single lane tunnel underpass, it chose but then rejected another alternative. Senior Planner Lynne Mounday did the initial study required by the California Environmental Quality Act (CEQA) on the underpass alternative, and recommended that the Board adopt a negative declaration with mitigation measures. After a hearing, the Board found that the project would have no significant effect upon the environment, and adopted the negative declaration with mitigation measures.
Appellant then filed this petition for writ of mandate. After a hearing at which several witnesses testified, the petition was denied.
II
Appellant challenges the trial court’s determination that the Board did not abuse its discretion when it decided that an environmental impact report was unnecessary. She contends that the trial court improperly relied on an environmental impact report which was not considered by the Board; she also contends that there was substantial credible evidence from which it could be fairly argued that the intersection reconstruction would have substantial adverse environmental impact.
CEQA (Pub. Resources Code, § 21050 et seq.)
1
requires all local agencies to prepare an environmental impact report (EIR) on any project “which may have a significant effect on the environment.” (§ 21151.) If there is a possibility that a project may have such an effect, the agency must conduct an initial threshold study. (Cal. Admin. Code, tit. 14, § 15080.) An agency should prepare an EIR whenever it can be fairly argued on the basis of substantial evidence that the project may have significant environmental impact.
(No Oil, Inc.
v.
City of Los Angeles
(1974)
Judicial review of an agency decision under CEQA is governed by sections 21168 and 21168.5 of that act. Section 21168 provides that review of an agency decision “made as a result of a proceeding in which by law a hearing is required to be given, evidence is required to be taken and discretion in the determination of facts is vested in a public agency” should follow the administrative mandamus procedure of Code of Civil Procedure section 1094.5. Section 21168.5 provides that other agency decisions should be reviewed by a traditional mandamus action.
(No Oil, supra,
The parties also disagreed as to the standard which the trial court should utilize in reviewing the Board’s determination to adopt a negative declaration, and there is disagreement among the Courts of Appeal as well. According to
Pacific Water Conditioning Assn., Inc.
v.
City Council
(1977)
As did the
Perley
court, we find it unnecessary to resolve the conflict between
Pacific Water Conditioning
and
Friends of“B” Street.
(See
Perley, supra,
137 Cal.App.3d at pp. 433-434, fn. 4.) This court and the trial court occupy identical positions with respect to review of the Board’s decision in this case. (See
Brentwood Assn. for No Drilling, Inc.
v.
City of Los Angeles
(1982)
The essence of appellant’s argument is that the intersection project would have growth-inducing impact separate from that of the CVR project *939 itself, so that a separate EIR was necessary. However, the record does not support that contention.
Reconstruction of the intersection in some form was a condition of the Board’s approval of the specific plan for the CVR. An EIR was prepared for the specific plan. That EIR could not have analyzed the underpass design, as that particular design had not been prepared or decided upon when the EIR was completed. Nevertheless, the EIR did address the growth-inducing impact of the CVR development.
The consultants who prepared the design alternatives were instructed to accommodate the traffic which would be generated by the build-out of CVR. The primary purpose of the underpass design was to make a safe intersection for that volume of traffic. In his initial study, Planner Mounday reported to the Board that because the intersection was designed only to accommodate the anticipated CVR traffic, it would not induce growth of any new projects. 3 Any future projects proposed for the valley would require their own environmental assessments. The record contains no substantial evidence to the contrary.
Appellant contends there was substantial evidence from which it could be fairly argued that the intersection project would be growth-inducing to an extent not already analyzed in the existing EIR. She focuses on one sentence in public works official Orett’s cross-examination as evidence that the intersection project had twice the capacity necessary to accommodate the CVR development.
Even according to the
Friends
of“B”
Street,
the test is not whether any argument can be made that a project might have a significant environmental impact, but whether such an argument can
fairly
be made. If there is no substantial evidence that a project will fall within the requirements of CEQA, an argument that a project might have such impact cannot fairly be made.
(Friends
of“B”
Street, supra,
Relying on
City of Davis
v.
Coleman
(9th Cir. 1975)
Appellant’s contention that the trial court relied on an EIR which had been rejected by the Board is a misrepresentation of what occurred. The CVR specific plan EIR was reviewed by Mounday in preparing his initial study, and the hearing before the Board on the recommended negative declaration makes it clear that the Board also considered the EIR.
Ill
Appellant also contends there is no substantial evidence to support the court’s finding that the intersection project was consistent with the county’s general plan. In particular, she complains that the CVR specific plan required simultaneous reconstruction of the intersection and improvement of Carmel Valley Road to four lanes between Robinson Canyon Road and Via Petra. The contention is without merit. We find nothing in the plan itself or in the Board’s subsequent conduct to indicate that when it approved the specific plan, it intended simultaneous construction of the two-road improvement projects. For example, the agreement entered into between the county and CVR to carry out the conditions imposed by the specific plan contained no simultaneous construction requirement.
Judgment is affirmed.
Feinberg, J., and Barry-Deal, J., concurred.
A petition for a rehearing was denied September 15, 1983.
Notes
Unless otherwise indicated, all statutory references are to the Public Resources Code.
If the trial court has received additional evidence, the question before it is whether substantial evidence on the whole record, including the evidence presented to it, supports the agency’s determination that no EIR was required.
(No Oil, supra,
The initial study also concluded that the project’s potential significant impacts (i.e., erosion, degradation of surface water, loss of native vegetation, visual degradation, etc.) could be reduced to insignificant levels provided certain measures in mitigation were taken. Appellant does not contest this aspect of the negative declaration.