272 Mass. 372 | Mass. | 1930
Seven petitions for land damages were tried together with a stipulation that the entire damages found by the jury in the actions should be entered as the verdict in one of the cases, and that a verdict of $1 should be entered in each of the remaining actions.
The purpose of the takings was to provide for the extension of rapid transit facilities in the Dorchester district of Boston under the provisions of St. 1923, c. 480. The
After the taking the respondent constructed upon the portion of the land taken adjoining the petitioner’s remaining land an industrial siding running the entire length of the petitioner’s remaining land and connecting with the main line of the railroad company. This was completed about eighteen months after the taking and during that period, except for a short time, the freight sidings existing before the taking remained for use. Subject to the petitioner’s exceptions, evidence was introduced as to this industrial siding and as to the freight connections
St. 1923, c. 480, § 2, provides, in part, that, if the line of surface railway shall run over the location or a portion thereof of the main line railroad tracks between Andrew Square and Harrison Square, the city should acquire a right of way therefor from the railroad companies, either by purchase or by eminent domain, under chapter 79 of the General Laws, and in case of the latter, that the railroad companies would be entitled to compensation for any injury to their property to the same extent as private persons from whom takings may be made, and that the compensation might be “made in whole or in part in land, bridges, structures, materials or labor, including alterations on said portion of the main line as may be necessary and proper to put said railroad companies in as good position as they now are for conducting their business, if the parties so agree. The portion of said line of surface railway which may be located upon said main line right of way shall be so designed and constructed that the said railroad companies, or their successors, shall have suitable freight connections with the sidings and freight yards now in use.” The petitioner contends that the act does not give it the rights to an industrial siding, and that if it did give such rights the instrument of taking did not reserve them.
The apparent purpose of the adoption of G. L. c. 79 was
It would seem that the petitioner would be as well off as before so far as freight privileges are concerned if it has the same right to connect with and to use the railroad siding constructed and now controlled by the railroad company as it had before the taking to connect with the main line of the railroad. The act did not specify how the freight siding privileges should be provided, but the petitioner’s right to a siding if needed for its remaining land was secured to it by the act whether the city continued to hold title to the land over which the siding was constructed or conveyed title thereto to the railroad company. The manner in which the right might have been enforced if the city had not undertaken to convey to the railroad company its title to the industrial siding need
The rights of the parties were fixed at the date of the taking. Ham v. Salem, 100 Mass. 350. Imbescheid v. Old Colony Railroad, 171 Mass. 209, 210. Flagg v. Concord, 222 Mass. 569. But a part of thoge rights was the spur track and siding privileges secured in the act. The construction of the industrial siding was in the nature of a recognition of an obligation and not the granting of a privilege.
The petitioner contends that the judge erred in refusing to give its request numbered twenty to the effect that, if the court rules as matter of law that by the delivery and recording of the deed to the railroad company the petitioner has a right of access to the industrial siding equal to the side track facilities which it had before the takings, the jury be instructed that the petitioner is entitled to damages for loss of side track privileges from the date of the takings until the delivery and record of the deed to the railroad company September 27, 1929.
The petitioner contends that the present spur track facilities are less valuable than those which it enjoyed before in that before the taking its land abutted on the main line and now abuts only on a freight siding, and for the further reason that it may be a question whether the railroad company will give any spur track facilities to one of its lots which was separated by the taking from the rest; and that it should be compensated for this difference in value. But it appeared in evidence that the new siding ran by this lot and that a track could be built from it which would require that cars be run up and switched back. A witness testified that he did not know whether or not the railroad company would make this connection. In case of the refusal of the railroad company to make
Upon our construction of the act authorizing the taking, the siding and freight yards in use at the time were to be connected with the main lines of the railroad companies and provision of some kind would be made so that the petitioner’s land formerly bounding on the railroad location would after the taking have freight facilities if needed equivalent to those enjoyed before. Under the circumstances the fact that the land no longer abutted on the main line of the railroad but on the line of its industrial siding is not in law a detriment to the petitioner. The jury must have understood from the evidence admitted that the petitioner continued to have the right to side track facilities in its use of its remaining land.
The contention that there is no evidence that a deed was delivered to or accepted by the railroad company cannot be maintained. The inference of such delivery was justified upon the testimony of the chairman of the Boston transit commission to the effect that the deed of conveyance was made upon completion of the work, and that it was the compensation paid the railroad companies, as authorized by the statute, for what was taken from them. A taking for the purpose of obtaining for the public better rapid transit facilities is a taking for a public use and if, as incident to such taking, the public would otherwise be deprived of certain railroad accommodations, the public interest would justify authorizing the city to take enough land so that such loss of railroad accommodations might not result. This would not be the acquiring of property with public money, to sell in whole or in part to private individuals, within the meaning of the rule stated in Opinion of the Justices, 261 Mass. 556, 612. The railroad company is a corporation with public duties and with authority under specified conditions to take property by
The president of the petitioner, having testified that the taking shut off two drains which had carried the surface water from its land, said, in answer to a question asked in cross-examination, that after the new sewer was put in by the city a connection was made with it. After the answer was given, counsel for the petitioner stated that he excepted to evidence of anything done after the taking. The witness then stated that the connection was made with the sewer because the changes caused by the taking cut off the culverts. He also testified that the petitioner’s land by the tracks was no drier after the taking than before; and that the petitioner itself had to make the entrance to the sewer. It appears by one of the instruments of taking that an easement in a strip of the petitioner’s land eight feet in width was acquired for the purpose of constructing and maintaining a sewer adjoining the land taken by the respondent in fee on the same day. There was testimony that this sewer was. built not to drain the petitioner’s land, but because another sewer had been cut off, and that it was possible to use the new sewer for such drainage. The judge charged the jury at the petitioner’s request that, as no drainage rights had been reserved or provided for in the takings, “ the petitioner’s damages must be assessed as though no such rights existed.” We must assume that the jury followed these instructions. Such exceptions as the petitioner saved to the admission of evidence concerning the connections which were in fact made with the new sewer must be overruled.
The exception to the ruling excluding testimony as to the use which the petitioner intended to make of the land taken or of its remaining land must be overruled. Fair market value does not mean special value to the owner. Sargent v. Merrimac, 196 Mass. 171. In Maynard v. Northampton, 157 Mass. 218, 219, the court said: “In determining the damages . . . the jury should consider
There was no error in excluding evidence that at the time of taking the petitioner had applied to the New York, New Haven and Hartford Railroad Company for side track facilities reaching from the spur track to buildings to be constructed, and that the same had been agreed to. All testimony offered relating to side or spur tracks actually constructed was admitted. The evidence excluded was based upon an oral agreement concerning a siding in con
The lease dated January, 1923, for the term of ten years, of a part of its land made by the petitioner, with provision that the lessor should erect a building, and also containing the clause, the “Lessor . . . agrees to sell and the . . . Lessee agrees to purchase said . . . land and buildings on or before the termination of said Lease, but not before January 1924,” was rightly excluded as evidence of value. The fact that the sale might not be consummated until 1933 and would include a building to be erected made this agreement (although binding and enforceable) inadmissible as evidence of the value of the land at the time of taking. The facts distinguish the case at bar from Manning v. Lowell, 173 Mass. 100, 104.
The petitioner offered to prove that the transit commission at one time requested of it copies of the plans of its land and of the proposed buildings which it contemplated putting thereon, and that in compliance with this request it submitted plans to the commission showing the proposed improvements about to be placed upon the land. For reasons already stated, the evidence as to the petitioner’s plans for buildings and improvements was properly excluded, and the evidence could not be introduced in this indirect way. It did not appear from the offer that spur track facilities were requested or that the respondent should have earlier constructed a siding because
We have examined all exceptions argued and are unable to find reversible error in any of them.
Exceptions overruled.