OPINION
{1} Plaintiffs appeal from a partial summary judgment dismissing their claims of trespass and conversion and from the district court’s ruling granting Defendants’ motion for directed verdict on the issue of punitive damages. We reverse the grant of partial summary judgment and remand the case to the district court for further proceedings on these claims. We affirm the district court’s refusal to instruct the jury on punitive damages.
FACTUAL BACKGROUND
{2} Plaintiffs William F. McNeill, Marilyn Cates, and the Black Trust are the owners of the “McNeill Ranch,” a 110,000-acre property assertedly damaged by salt water disposal undertaken by Defendants over the last forty-plus years. Plaintiffs acquired the ranch by deed in 1995. Defendants are associated with Hobbs Salt Water Disposal System (Hobbs SWDS), which appears to be a partnership or joint venture of Rice Operating Company (Rice Company), and several oil and gas producers. Hobbs SWDS is located near the McNeill Ranch. References to “Rice” in this opinion, unless otherwise stated, refer to Defendants collectively.
{3} On May 29, 1957, the New Mexico Oil Conservation Commission granted Defendants’ predecessor, Pan American Petroleum Corporation (Pan American), authority to drill a salt water disposal well on the McNeill Ranch. An area of approximately 2.75 acres, the well became known as Hobbs SWDS Well E-15 (Well E-15). Approximately one month after drilling was approved, Pan American negotiated a “Property Damage Release” (Release) for the site with Will Terry (Terry), Plaintiffs’ predecessor and then owner of the McNeill Ranch. Construction and drilling of Well E-15 began after the Release was executed. About two months later, Rice negotiated a right-of-way with Terry for pipelines that would run “over and through” the ranch. These pipelines would eventually connect Well E-15 to the Hobbs SWDS. Three additional pipeline right-of-ways were later negotiated: one in 1960 with Terry and two in 1977 with his daughters, Plaintiffs’ predecessors in interest, Ruth Furneaux and Muriel McNeill.
{4} A massive project constructed over a two-year period, Hobbs SWDS is a gravity-based disposal system comprised of approximately forty-three miles of underground gathering lines. The gathering lines connect to hundreds of producing oil and gas wells, and dispose of large volumes of salt water, a by-product of oil and gas drilling. The system consists of fourteen disposal systems with between one and five or more disposal wells in each system. Well E-15 is one well in one system, although there are other disposal wells on the McNeill Ranch.
{5} After Well E-15 was completed, concrete pipelines were laid on top of the ground on the negotiated right-of-ways. Extending beyond the boundaries of the McNeill Ranch and connecting the main line to Well E-15, the pipelines were later buried. Since the completion of the system in 1960, approximately 99% of the salt water disposed into Well E-15 has come from beyond the boundaries of the McNeill Ranch.
PROCEDURAL BACKGROUND
{6} Plaintiffs filed a complaint to recover damages against Defendants Rice Engineering and Operating, Inc., Rice Engineering, Inc., and Rice Company, along with a jury demand in October 1998. A second amended complaint added the remaining Defendants. Plaintiffs’ claims are based on two types of alleged wrongful conduct: (1) Rice’s unauthorized use of Well E-15 for the disposal of salt water produced outside the McNeill Ranch, and (2) Rice’s alleged negligence in allowing the salt water disposal system to leak onto Plaintiffs’ land.
{7} Plaintiffs alleged that in 1995, they discovered Rice had been injecting off-site salt water into Well E-15 since 1958, and this disposal was without authorization or eompensation, thereby constituting a continuing trespass. Plaintiffs further claimed that since 1958, Rice had converted the money which participants in the salt water disposal system paid Rice. Plaintiffs initially alleged Rice had converted the use of the well and the money but later conceded there is no claim for the conversion of real property. Bowman v. Butler,
{8} The complaint also charged Rice with negligence in allowing a salt water spill from the system on the McNeill Ranch, at a point referred to as the “1-9 spill site.” Compensatory and punitive damages were sought on the trespass, conversion, and negligence claims.
{9} Prior to trial, Rice filed a Motion for Partial Summary Judgment to dismiss the trespass and conversion claims on several grounds, including that (1) Rice had obtained a prescriptive easement or easement by implication for its disposal into Well E-15, (2) the Release authorized Rice to dispose off-site salt water into Well E-15, (3) Plaintiffs’ claims were limited to the time during which they were in actual possession of the ranch, and (4) a statute of limitations theory. The district court granted summary judgment in favor of Rice on the limited ground that the Release unambiguously granted Rice the right to dispose of off-site salt water produced into Well E-15. The district court’s summary judgment applied equally to the conversion claim as to the trespass claim, and Rice defends the judgment solely on the ground relied upon by the district court-that the Release was unambiguous and allowed the disposal of salt water. We limit our opinion to the issues raised by the parties and ruled on by the district court, and nothing herein is intended to express any opinion on the validity or invalidity of the conversion claim or the defenses raised by Rice in its motion other than release.
{10} The case proceeded to trial by jury on the negligence claim. The district court directed a verdict in Rice’s favor on Plaintiffs’ punitive damages claim. The jury awarded Plaintiffs $70,000 for compensatory damages.
DISCUSSION
Partial Summary Judgment on Claims of Trespass and Conversion
{11} The issue before this Court is whether there exists a genuine issue of disputed fact as to the meaning of the Release. Before we address the merits of that issue, we dispose of Rice’s claim of lack of preservation. Rice claimed that Plaintiffs’ theory about the Release had broadened on appeal to deny the right to dispose of any salt water into the well. Our understanding of Plaintiffs’ theory, however, is that the Release may have authorized disposal of salt water produced on the ranch, but did not authorize disposal of salt water produced off-site. We next turn to the merits.
{12} An appeal from a grant of summary judgment presents a question of law that is reviewed de novo. Bartlett v. Mirabal,
{13} Here, the district court granted summary judgment on the ground that the Release was unambiguous in its terms and barred Plaintiffs’ claims. Releases are contractual in nature and thus are governed by traditional principles of contract law. Ratzlaff v. Seven Bar Flying Serv., Inc.,
{14} For purposes of clarification, we note the district court may consider the circumstances surrounding the making of the contract and of any relevant usage of trade, course of dealing, and course of performance in making its threshold determination of whether the contract terms are ambiguous. C.R. Anthony Co.,
{15} The district court held that:
[T]he Surface Damages Agreement between Mr. Will Terry and Pan American is unambiguous in its terms and it is clearly assignable and grants to said Defendants the right to use, occupy, and damage Plaintiffs [sic] property and estate consistent with the construction and operation of one or more salt water disposal wells.
We disagree that the Release is unambiguous. The Release provides as follows: 1
PROPERTY DAMAGE RELEASE
WHEREAS, the undersigned (referred to hereinafter in the singular whether one or more) is asserting a claim against Pan American Petroleum Corporation arising out of damages to certain property, to-wit: Damage to land surface incurred for road construction and drilling operations, including permanent use of land for the roadway and a certain tract specifically described below.
which damages resulted from certain occurrences or operations alleged expected to ■have take it place on the following described tract or parcel of land:____
said alleged occurrences or operations being more particularly described as follows: Drilling, equipping and operating one or more salt water disposal wells and/or an oil well if commercial production is encountered on the above described lands together with related facilities excluding, however, right-of-ways for salt water gathering system beyond the boundaries of this tract.
AND, WHEREAS, there exists a bona fide dispute and difference between the undersigned and Pan American Petroleum Corporation as to the validity of said claim, and although denying liability therefor Pan American Petroleum Corporation is willing to purchase its peace.
NOW, THEREFORE, for and in consideration of the sum of $500.00, cash in hand paid by Pan American Petroleum Corporation, the receipt and sufficiency of which is hereby acknowledged and confessed, the undersigned does hereby release the said Pan American Petroleum Corporation, its successors and assigns, of and from any and all causes of action, damages, liabilities, expenses and costs whatsoever arising by reason of the said occurrences or operations.
{16} Rice reads the document to unambiguously release “any and all” damages arising from the operation of a salt water disposal well, excluding any damages caused by the right-of-ways for the salt water gathering system that extends beyond the boundaries of the land. Rice reasons that the reference to surface damages in the first paragraph is merely a recital clause that explains how the Release came into existence and does not form any part of the agreement. To Rice, the core of the Release is the “release clause,” which expressly releases Rice from “any and all ... damages ... whatsoever ” arising from “said occurrences or operations,” including the operation of a salt water disposal well. By inserting, “expected to take place,” Rice argues the parties contemplated that the Release would include a release for any and all future damages arising from the operation of a salt water disposal well. Because the Release does not limit the source of salt water to be disposed, Rice argues, the Release allows the disposal of salt water produced off-site into Well E-15.
{17} Rice construes the exclusion clause-excluding “right-of-ways for salt water gathering system beyond the boundaries of this tract” — to mean that although Terry released all damages for certain “occurrences or operations,” he retained the right to seek damages arising from such right-of-ways. Rice argues that exclusion of the easements is proof Terry knew Pan American would be importing salt water into the well from lands other than Plaintiffs’.
{18} Plaintiffs counter that the Release is a release paying $500 for damages to land surface incurred during the original construction of Well E-15 and the infrastructures and facilities needed to complete that construction. The damages released also include surface damages associated with the drilling and operation of oil wells and one or more disposal wells needed to accompany the oil wells on the McNeill Ranch, in the event oil production was encountered on the ranch.
{19} In construing the Release, Plaintiffs first note that the document is entitled “Property Damage Release,” which to them indicates it is not a “salt water disposal agreement.” In their view, the first paragraph defines the scope of the claims being released — “[d]amage to land surface incurred for road construction and drilling operations.” In Plaintiffs’ view, the “any and all” language conflicts with the definition clause, but is more logically tied to the surface damage clause and should be read as “any and all claims for damages to [land] surface” arising by reason of drilling, equipping, and operating one or more salt water disposal wells.
{20} Plaintiffs next turn to the second and third paragraphs of the Release. They argue that the language “if commercial production is encountered on the described lands” demonstrates an intent to allow those things needed to achieve production on the McNeill Ranch — drilling, equipping, and operating one or more disposal wells and/or an oil well — and release the damage caused to the land’s surface as a result. Plaintiffs argue that the exclusion of right-of-ways for the salt water disposal system from beyond the boundaries is consistent with the surface damage clause, and indicates the parties did not agree to the disposal of off-site salt water into Well E-15.
{21} After reviewing the Release and the parties’ interpretations, we find the Release is susceptible to two reasonable but inconsistent interpretations on its face. Inasmuch as reasonable jurors could find either interpretation correct, the Release is ambiguous on its face. Accordingly, we hold it was error for the district court to dismiss the trespass and conversion claims, at the summary judgment stage, on the basis of the Release.
{22} First, we observe that the Release was drafted on what appears to be a general release form which was designed to accomplish one objective, but was modified by the parties to accomplish another. Without the changes, the document appears to be nothing more than a general release form for personal injury or property damage. See 6 William J. Flittie, Summers Oil and Gas § 1418 (West 1967) (General Form Release in Full). With the changes, the document creates ambiguity as to the parties’ intent. Cf. id. § 1173 (Lease for Salt Water Disposal).
{23} Prior to its modification, the form was designed to cover existing damages. It was modified to cover future damages, yet there is retroactive language throughout. For example, paragraph two was changed to read prospectively: “occurrences or operations alleged expected to have takes place.” But the tense is unchanged in: (1) paragraph one, which includes the language “is asserting a claim ... arising out of damages”; (2) paragraph two, which begins “[W]hich damages resulted from”; and (3) paragraph four, which relates that “there exists a bona fide dispute ... as to the validity of said claim.” Even assuming the parties intended the modification to release future damages, it would not be unreasonable for a jury to conclude the waiver related to surface damages as Plaintiffs assert, and did not include unlimited off-site salt water disposal.
{24} Adding to the confusion, the “surface damage” language in the recital clause was added by the parties, yet the broader waiver of “any and all damages” appears to be form language. We do not believe it is proper to discount the recital clause and ignore the reference to surface damages inserted by the parties. “Although their proper role in the interpretation of the main body of the contract has sometimes been unclear, it is plain that [recitals] are frequently intended to, and often do, shed light on the circumstances the parties wished to have considered in the interpretation of the contract.” See 2 E. Allan Farnsworth, Contracts § 7.10, at 513-14 (2d ed.1990) (footnote omitted). We find this particularly persuasive in this case in view of the other apparently inconsistent modifications to the form described above. Viewed in this light, reasonable jurors could find the Release to read as Plaintiffs urge, to wit: a release for any and all damages to land surface expected to take place as a result of drilling, equipping, and operating one or more salt water disposal wells and/or oil well if commercial production is encountered on-site.
{25} Second, the Release is indefinite and unclear as to scope and coverage. See Mark V, Inc.,
{26} Our research indicates that where oil production is encountered on a person’s land there may be an implied authorization to dispose of salt water in order for the production of oil and gas on that person’s land to be accomplished. See Colburn v. Parker & Parsley Dev. Co.,
{27} Third, if the Release was intended to substitute as a disposal agreement as Rice urges, a jury could be persuaded that there should be terms indicating that was the agreement. See Pope v. The Gap, Inc.,
{28} In light of the foregoing, summary judgment on the basis of the Release was error. Accordingly, we remand the case for further proceedings.
Directed Verdict Dismissing Punitive Damages Claim
{29} Plaintiffs’ second claim on appeal is that the district court erred by directing a verdict against them on the issue of punitive damages. Plaintiffs’ claim arose from a leak known as the 1-9 spill site. The 1-9 spill occurred when a steel nipple inside a junction box in the pipeline corroded. The spill was discovered by Rice in June 1998. Although it is unknown how long the pipe had been leaking by that time, Rice notified Plaintiffs immediately and repaired the pipe within three to four days.
{30} The only other major leak in the Hobbs system during its forty years of operation was referred to as the “West County Road leak” (1993 leak). The 1993 leak was caused when a worker ran a backhoe or grader into the pipe during the construction of a by-pass in 1988. The leak was not discovered until 1993, and was still being remediated at the time of trial in 2001. Rice apparently had nothing to do with the 1993 leak.
{31} “A directed verdict is a drastic measure that is generally disfavored inasmuch as it may interfere with the jury function and intrude on a litigant’s right to a trial by jury.” Torres v. El Paso Elec. Co.,
{32} To survive a motion for directed verdict on a punitive damages issue, Plaintiffs had to submit evidence from which a jury could find that Rice acted with a culpable mental state, or evil motive, that rose to a level of conduct that was willful, wanton, malicious, reckless, oppressive, or fraudulent. Torres,
{33} Plaintiffs’ theory was that Rice acted with reckless and wanton disregard in failing to adopt an effective leak detection system, despite the damage caused by the 1993 leak. Plaintiffs assert the following evidence adduced at trial rises to the requisite level of recklessness:
1. The pipeline ... is part of a 40 year old salt water disposal system ... [that] carries] waste fluid from oil production which can be described as “ocean water with an oil spill on it.”
2. Because this is a gravity flow system, the lines have to be buried.
3. Gravity first pulls any leaks down (toward the water table). [Rice] had no method to detect leaks other than actually seeing the leaks [after] one had finally seeped back up to the surface.
4. [Rice] knew the pipeline had suffered at least one previous major leak. Indeed, [Rice has] had knowledge for many years prior to the [1-9 spill] that the pipeline had leaked.
5. [Rice] didn’t have any formal program for “walking the lines” until 1999.
6. [Rice] knew the inspection method that it utilized could not detect substantial leaks within the pipeline until such leaks had likely created a major pollution problem. Indeed, ... a major leak was detected in 1993 which had occurred several years previously. The damage from that old leak was still being remediated ... in 2001.
7. [Rice does not] know how long ... [I-9 spill] existed.
8. The problems with this design were obvious to persons who had oilfield experience, and to those who had no oil field experience.
9. A prudent operator would not use an underground system with steel junctions that corrode because of the salt water they carry, and which could not be pressure tested to discover leaks before contaminants entered the water table or ... had created an environmental disaster.
10. [Rice], for years, consciously disregarded and acted recklessly with respect to the known risk and ... likelihood, that major leaks would go undetected until substantial environmental damage had occurred.
11. At the time of trial in 2001, [Rice] had no plan to change its operation of the system or make any change that would prevent major leaks from going undetected until they bubbled up to the surface.
12. Plaintiffs’ expert, Mr. Ron Britton, was of the opinion that there will continue to be major leaks in this system if no changes are made.
To Plaintiffs, the cumulation of the evidence showed: Rice knew the pipeline had leaked for many years and knew their inspection method could not detect leaks until significant pollution had already occurred. Rice had replaced similar pipes in other underground systems with pipe that does not corrode and was capable of being pressure tested for leaks. Despite this knowledge and ability to correct the problem, Rice continued to operate the forty-year-old pipeline without an effective method of leak detection and caused substantial damage to Plaintiffs’ land.
{34} The district court concluded Plaintiffs had not introduced evidence sufficient to establish reckless or wanton conduct. Specifically, the district court found (1) the older leak on the system, caused by a backhoe during the construction of a by-pass, was not sufficient notice to Rice of the potential for future leaks from corrosion in the pipelines; (2) despite the fact that Plaintiffs’ expert testified Rice was reckless to braid a salt water system with steel plugs in its junction boxes because of its corrosive nature, that system had lasted forty years; and (3) despite the absence of a “formal written policy,” Rice had an unwritten policy to walk the lines to inspect the pipelines for leaks. We agree with the district court that Rice’s conduct did not rise to the requisite level of recklessness.
{35} First, we note that Plaintiffs’ contention that Rice had replaced similar pipes in other systems and therefore had the ability to correct the problem was not in evidence at the close of Plaintiffs’ case. Rather, it was elicited by Plaintiffs on cross-examination of Rice’s witness during the defense case. Hence, the district court did not consider that evidence in reaching its decision to grant a directed verdict. Plaintiffs never requested the district court to reconsider the directed verdict in light of this evidence. As such, Plaintiffs failed to preserve this particular argument and this Court may not now consider the evidence on appeal. See Rule 12-216(A) NMRA 2003; Allsup’s Convenience Stores, Inc. v. N. River Ins. Co.,
{36} Second, even though Hobbs SWDS was a forty-year-old system of buried pipelines with steel junctions that had no method of leak detection other than visual inspection and it was likely that some part would corrode eventually, our precedent together with the undisputed facts do not support a finding that Rice’s design and operation of that system was recldess.
{37} Plaintiffs primarily relied on Rice’s knowledge of the 1993 leak to establish knowledge that such leaks would go undetected until they had caused substantial damage. In Plaintiffs’ view, the relevant similarity between the 1993 leak and the 1-9 spill was not their cause but the fact that both leaks went undetected for some time because the system was inadequate to detect leaks. Although prior similar incidents may support a finding of punitive damages by establishing “knowledge, attitude, or response to dangers [Rice] knew or should have known about prior to Plaintiffs’] injury,” Enriquez v. Cochran,
{38} It is undisputed that Plaintiffs’ land was substantially damaged by Rice’s conduct. Although Rice knew from the 1993 leak that such a leak may go undetected for years, the risk involved was an economic risk to property, for which the jury compensated Plaintiffs. While we assume that waste water could be dangerous to persons or animals if ingested, there was no evidence of such an injury in the instant case.
{39} Third, there was substantial evidence arguing against any finding of recklessness. Rice established that the salt water disposal system never violated industry standards or government regulations, either at the time of construction or at the time of trial. There was also evidence that the system had operated for over forty years with only two major leaks. The first and only leak which occurred as a result of the system’s design and age was the 1-9 spill, which was the subject of Plaintiffs’ claim. There was evidence Rice detected the 1-9 spill, immediately reported it to Plaintiffs, and repaired it within three to four days. While Rice could not tell how long the leak had existed, Plaintiffs offered no evidence that it was a long-term leak like the 1993 leak. Moreover, while Plaintiffs are correct that Rice had no formal policy to “walk the lines,” there was evidence Rice did have an unwritten, informal policy to “walk the lines” to inspect the pipelines for leaks. In fact, since it was Rice who’ discovered the 1-9 spill, it was apparently this procedure that resulted in discovery of the leak.
{40} We note Plaintiffs did not offer any evidence of what Rice could have done differently to detect leaks, short of replacing the entire forty-three mile system. We know of no precedent, and Plaintiffs cite none, which requires companies to take every means available, no matter how costly or how feasible to avoid any potential economic injury, even if it knows or has reason to know such may be the consequence. Cf. Constr. Contracting & Mgmt., Inc. v. McConnell,
{41} Our conclusion is not shaken by Plaintiffs’ expert’s opinion that Rice was engaged in reckless conduct because there was a reasonable probability major spills would occur in the future if operations remained the same. The opinion is akin to a legal conclusion and adds little if anything to Plaintiffs’ position, especially in light of the facts that the system has been operating for over forty years without any previous leaks caused by the system’s old age and that the 1-9 spill was the first leak caused by corrosion. We agree with the district court — we find nothing reckless about the design or operation of such a system, even if Rice knew it would eventually wear out.
CONCLUSION
{42} We reverse the summary judgment dismissing Plaintiffs’ trespass and conversion claims because we find that reasonable minds could attach different meanings to the Release on its face. Accordingly, we remand the case on the issue of these claims for further proceedings.
{43} We affirm the district court’s decision to direct a verdict in Rice’s favor on the issue of punitive damages.
{44} IT IS SO ORDERED.
Notes
. We have italicized and underscored the provisions of the Release that were typed in by the parties on what appears to be a printed form document. The lines through certain language are modifications made by the parties to the form.