129 Mich. 385 | Mich. | 1902
Lead Opinion
This action is for the recovery of damages alleged to have been sustained by the plaintiff as the result of an injury suffered on the 14th of January, 1898. The defendants are corporations doing business in the city of Detroit. For many years before 1890, the Detroit Safe Company operated a large plant between Antoine and Beaubien streets. In 1896 the Pfaudler Company commenced to do business for themselves in Detroit. The buildings of the plant occupied by the defendants were separated by a private alley about 12 feet in width. Situated in this private alley, and near the Fort-street entrance thereof, was a large, 10-ton platform Fairbanks scale, which was used originally by the defendant safe company in its business, and latterly by both defendants. The platform of the scale was 16 feet long and about 9 feet wide. After the Pfaudler Company located in Detroit, it occupied that part of the old safe company’s plant lying to the east of the private alley, the safe company continuing to keep that part lying to the west side of the alley. The scales were erected in 1889 or 1890. The beam of the scale is inside that part of the plant occupied by the safe company. At the time of the accident, the Pfaudler Company was the owner of the land upon which the entire plant was built. It is claimed by the defendant Pfaudler Company that, on the purchase of that part of the safe company’s plant used in their business, they bought everything in the way of machinery in the building, tools, etc., but that they did not buy the scales. The
On the morning of January 14, 1898, the plaintiff and one George Morton, teamsters in the employ of the Shed-den Cartage Company, hauled a load of steel from the Lake Shore depot to the plant of the Pfaudler Company. The load consisted of 20 sheets of pressed steel 23 feet 9-]- inches long, and with a combined weight of 14,000 pounds. The truck and equipage weighed, one witness says, about 4,000 to 5,000 pounds, while a witness for plaintiff says it weighed 2,200 or 2,300 pounds. Plaintiff had hauled similar material to the premises of the Pfaudler Company before this time, where it was weighed upon the same scales. He drove his load upon the scales. The scales, gave way at the southwest corner, causing the sheets of steel to slide from their places, and the plaintiff was caught between the steel and the building of the safe company, and was severely injured. It is claimed on the part of the plaintiff that the timbers used in the construction of the scales had rotted, allowing one of the bolts which sustained the platform of the scales to pull through; and that defendants, by a proper inspection, would have learned of the defect, and it was negligent in them to allow plaintiff to drive on the scale under the circumstances disclosed by the record. It was the claim of the defendants that, if there was any defect, it was a hidden one. It is also claimed the scales were overloaded; that the load was not properly placed on the scales. The circuit judge directed a verdict in favor of the defendants. The plaintiff has brought the case here by writ of error.
The testimony was conflicting. The witnesses for plaintiff testified that the timbers of the scale were rotten, and because of this the bolt head pulled down into the timber. The testimony on the other side tended to show there was no decay in the timber. The evidence discloses these scales were set in a pit dug in the ground. In the four sides of the pit was built a stone wall, with pockets in it, into which the ends of the levers which supported the platform could be passed and attached to bolts, which ran up through heavy timbers, which were placed on top of the wall. On the top of the timbers was a heavy planking, and upon the top of the platform there was also heavy planking, the top of the scales coming a little above the surface of the ground. This structure was exposed to the weather and to the influence of the earth coming against the sides of the timbers. It is evident the timbers were subjected to more or less moisture, which would have a tendency to cause decay.
In Morton v. Railroad Co., 81 Mich. 423 (46 N. W. 111), it is said:
“The rule may now be considered settled in this State, as well as in most of the States, not only that a master is bound to use all reasonable care in providing safe tools and appliances for the use of workmen in his employ, but that this is a duty which cannot be delegated to another so as to relieve him from personal responsibility. Johnson v. Spear, 76 Mich. 139 (42 N. W. 1092, 15 Am. St. Rep. 298); Van Dusen v. Letellier, 78 Mich. 492 (44 N. W. 572); Brown v. Gilchrist, 80 Mich. 56 (45 N. W. 82, 20*389 Am. St. Rep. 496). The duty of the master to his employé in this respect is clearly and well stated by Mr. Justice Morse in Van Dusen v. Letellier, just cited, at page 502:
“ ‘It is well settled by all the authorities that the master must provide his servant with a safe place to work in, and furnish him with suitable machinery and appliances with which to perform such work, and it is his duty to keep such machinery and appliances in good repair. If he cannot do this himself personally, he must provide some other person to take his place in this respect; and the person to whom the master’s duty is thus delegated — no matter what his rank or grade; no matter by what name he may be designated — cannot be a servant in the sense or under the rule applicable to injuries occasioned by fellow-servants. Such person is an agent, and the rules of law applicable to principal and agent must apply.’
“ This doctrine is also clearly stated by Justice Field in Northern Pacific R. Co. v. Herbert, 116 U. S. 650 (6 Sup. Ct. 590), where the whole question is carefully discussed, and numerous authorities in New York, Massachusetts, Maine, and other’States to the same effect discussed and approved. Four of the judges dissented from his opinion upon the ground that the case was governed by a special statute in Dakota, but expressed no opinion as to the common-law liability of the defendant under the circumstances of that case.
“In 1 Shear. & R. Neg. (4th Ed.) §§ 194, 204, this question is discussed and stated as follows:
“ ‘Seo. 194. The master also personally owes to his servants the duty of using ordinary care and diligence to provide for their use in his service sound and safe materials, instruments, and accommodations, and such appliances as are reasonably calculated to insure their safety. He is also personally bound to inspect and examine all these things from time to time, and to use ordinary care and skill to discover and repair defects in them.’
“‘Seo. 204. None of the duties which have been previously stated as devolving upon the master personally can be by him delegated to any agent so as to relieve him from personal responsibility. He may, and often must, delegate the performance of such duties to subordinates; but he remains responsible to all his servants for the acts of these subordinates in that particular capacity to the same extent as if those acts were literally his own.’”
See, also, Tangney v. J. B. Wilson & Co., 87 Mich. 453 (49 N. W. 666).
“ Inasmuch as plaintiff came upon the scales by the invitation of the Pfaudler Company, and simply by the license of the safe company, the plaintiff was a mere licensee. A mere licensee takes property in its existing condition, and the owner is not required to exercise that care which is demanded in the case of those who come upon the premises by invitation, expressed or implied. To the trespasser the owner owes no duty whatsoever, and the latter, who comes upon the premises in bad faith, has no relief against injury from a spring gun, trap, or other concealed danger. A licensee, who comes upon the premises with the permission of the owner, is entitled only to this additional protection: That he shall be warned of any positive danger from things which have been placed on the property by the owner; but thd owner does not owe him any duty to keep his premises, or any part of it, in good repair.”
The record does not show in a very satisfactory way just what the respective rights of the two defendants were in the scales, and the j udge did not permit that phase of the case to go to the jury, so that we are without aid from them as to how they viewed the question of fact relating to ownership. It is quite clear from the testimony that at least one of the defendants invited the cartage company, for whom the plaintiff was at work, to do the weighing of the steel upon the scales. Certainly the duty of inspection and repairing was not upon the Shedden Cartage Company. The principle involved is so fully discussed in Johnson v. Spear, 76 Mich. 139 (42 N. W. 1092, 15 Am. St. Rep. 298), it is not necessary to repeat the discussion here. See same case, 82 Mich. 453 (46 N. W. 733); Piette v. Brewing Co., 91 Mich. 605 (52 N. W. 152).
The question as to whether the scales were overloaded or improperly loaded was for the jury.
Judgment is reversed, and new trial ordered.
Concurrence Opinion
(concurring). The principles of law in this case are not much in dispute. The duty of an employer,
The difficulty with the instruction of the judge is in assuming that the testimony conclusively established that the timber had been in only four years. The testimony on the part of the defendants alone is not sufficient to establish that fact. The testimony on which defendants rely is that of Mr. Marschner:
“Q. When did you first do any work on the platform scales in their present position ?
“A. I think it was in 1894, — something like that. I really could not say.”
Such testimony could not be held to conclusively establish the fact that the repairs were made in 1894. Besides, one witness testified that he thought the scales had been