153 S.E. 406 | N.C. | 1930
On 26 July, 1926, the defendant, a corporation, was engaged in cutting trenches and laying conduit pipes on Morehead Street in the city of Charlotte for the Southern Bell Telephone Company. The plaintiff was an employee of the defendant and had charge of a squad of men. In order to lay the pipes it was necessary to cut through the bitulithic pavement and for this purpose the defendant furnished the plaintiff steel chisels or cutters about eighteen inches long and one inch and a half in diameter. It was alleged that the tops of the chisels had been hammered until they had become frayed, dangerous, and unsafe; that the plaintiff had requested the defendant to have the chisels dressed and put in suitable condition for the work he had to do and the defendant negligently failed to do so; that one of the men got a chisel or cutter *744 and held it in position and two other men struck it with heavy sledge hammers; that a small fragment of steel flew from the head of the chisel and struck the plaintiff's right eye while he was standing near by directing the work and practically destroyed the sight of the injured eye. The plaintiff alleged that his injury was due to the negligence of the defendant in failing to provide an air compressor drill and in providing a cutter which was worn, frayed, and unsuitable for the work which the plaintiff was required to do.
The defendant denied all allegations of negligence and pleaded contributory negligence and assumption of risk in bar of the plaintiff's recovery.
The jury returned a verdict for the plaintiff on all the issues, assessing damages. From the judgment rendered the defendant appealed upon error assigned in its exceptions. It is contended by the defendant that the evidence of negligence is insufficient; that the plaintiff assumed the risk of his injury, and that for these reasons, or indeed, for either of them, his motion for nonsuit should have been allowed. It is said that the chisel referred to was a simple tool and, if defective, that its defect was obvious and as easily discoverable by the plaintiff as by the defendant.
In Hicks v. Manufacturing Co.,
There is evidence that the plaintiff did this. Allen was superintendent; Fonville was general superintendent. They gave the plaintiff instructions. Fonville told him to turn over to Dulin, another employee, such tools as needed repair. The day before the injury the plaintiff requested Dulin to take the cutters and have them dressed, suggesting the necessity of prompt action. Dulin promised, but failed to do so. The tool was defective; the defect was known to Dulin, whose *745
duty it was to make the repair; and there is evidence that the defect was the proximate cause of the plaintiff's injury. Under these circumstances the first issue could not properly be withdrawn from the jury. Reid v.Rees' Sons Co.,
The appellee differentiates the cases on which the appellant relies. InClement v. Cannon Mills, ante, 43, there was no evidence of a defect in the appliance; in Martin v. Highland Park Manufacturing Co.,
Upon the evidence in the case we are not justified in holding as a matter of law that the action should be dismissed on the ground that the plaintiff assumed the risk of his injury. At the time he was injured the plaintiff was engaged in directing the work of three other men. This was his duty. They were to cut a ditch ten feet long through bitulithic pavement on a side street for the purpose of laying cables for the telephone company. It was necessary to hasten the work in order to keep the street open for traffic. The plaintiff marked the outside lines and stood six or eight feet away to see that the sides of the ditch, when cut, followed the marked lines.
The plaintiff assumed the ordinary risks incident to his employment, but not such as were attributable to the defendant's negligence, unless he continued to work under conditions that were so obviously and imminently dangerous that a man of reasonable prudence, exercising such prudence, would not have incurred the risk of injury. He had the promise of Dulin that the repair would be made and was expressly instructed by his superior officer to go to Dulin when repairs were needed. Whether with knowledge that the chisel had not been repaired a prudent man would have gone on with the work was a matter for the jury to determine. Medford v. Spinning Co.,
In answer to a question as to the way in which the head of the chisel was to be dressed the plaintiff said, "It was supposed to be cut off and dressed up, too, because it was dangerous." To sustain its exception to the answer the appellant relies on Marshall v. Telephone Co.,
The appellant excepted to testimony that about thirty minutes after the plaintiff was injured another workman engaged in the same work and using the same implements was hit by a piece of steel. As a rule evidence that one event occurred at a particular time is not admissible to show that another event occurred at another time. McNeill v. R. R.,
We have considered the appellant's exceptions to the instructions given the jury on the issues of negligence, contributory negligence, and assumption of risk and have discovered no reversible error.
No error.