215 P. 892 | Or. | 1923
The waters of the Willamette Biver before emptying into the Columbia Biver divide, and the main body goes to the right and the remnant to the left of an island. The branch going to the left is known as Willamette Slough. 'The plant of the Columbia County Lumber Company, since destroyed by fire, was located at a point on Willamette Slough. The dock was about 700 feet long and about 400 feet wide. The dock was constructed of heavy flooring placed upon piling driven into the earth. At the outer edge of the dock the floor was between 35 and 50 feet above the bottom of the slough. The piles were swaybraced and the structure was strongly built. The flooring was laid at right angles to the edge of the dock so that sling loads when drawn from the dock toward a moored vessel would be drawn along the length of and not across the planking-.
The sawmill operated by the Columbia County Lumber Company was, according to the estimate of one witness, about 2,000 feet from the dock. The lumber company had received some orders from the Standard Oil Company to cut lumber to be shipped to California there to be used in the construction of oil rigs. While the number and the lengths and sizes of the pieces used in the construction of oil rigs were substantially the same for each oil rig, yet it was necessary to keep the lumber for each oil rig separated from the rest. The lumber company cut the
About three weeks after the Columbia County Lumber Company had completed the delivery of the lumber upon the dock, the steamship “Willamette” arrived and was moored to the dock for the purpose of taking on the lumber. The vessel has a single hatch; between the hatch and the bow is a mast and between the hatch and the stern of the vessel is another mast. Attached to and connected with each mast are booms, blocks, cables and winches which were operated and propelled by steam power generated upon the vessel. The inshore booms extended five or •six feet over the dock. The gear connected with the forward mast is referred to as the forward gear and the other as the after gear.
The vessel was moored with the bow pointed south or upsteam and with the starboard side to the dock. In order to keep the lumber in each pile separate when loaded in the vessel, all the lumber in one pile was loaded and marked before any lumber was taken
McCauley was one of the four men who served the after gear. He and Simons, his “working partner,” were taking lumber from the pile and loading it upon a sling block. McCauley stood at the inshore end and Simons at the other end of the pile, and they loaded with McCauley handling one end and Simons the other end of each timber loaded. The pile at which McCauley was hurt was, according to the captain of the vessel, the fifth pile from the edge of the dock; but according to the testimony of the four men who served the after gear it was the second or third, probably the second, pile from the edge of the dock. Whether the injury occurred at the second or the fifth pile is of' no importance except so far as the issue of vibration of the dock may be affected. An
The lumber composing the oil rig orders was piled in the customary manner. The only fault found with the piling by. any witness related to the single piece which injured the plaintiff. The method usually followed is, if practicable, to pile the lumber in tiers twelve inches wide. This is done so that the longshoremen can take down and move a whole tier, and as the work progresses gradually widen the space between the piles, thus affording more room on the floor of the dock in which to handle the sling blocks and the lumber.
The evidence makes it appear that several sling loads, which had been loaded by McCauley and Simons, had been moved from the pile. Although the evidence shows that the four men who served the forward gear were at work on the south side of the pile we cannot know how much lumber was moved from that side of the pile except that it is made to appear from the testimony that they had not worked in as far as the piece which fell upon McCauley. It is difficult definitely to understand some of the details because a blackboard was used and witnesses employed the terms “these,” “that,” “here,” and “there,” words which were sufficiently definite when referring to a diagram on the blackboard but indefinite and uncertain when read as a part of the paper record. However, it is our understanding that two tiers had been entirely removed by McCauley and Simons and that all the pieces in the third tier had been removed except a very heavy piece known as a walking-beam; and it is possible, although it does not clearly appear, that all of the fourth tier
“I was standing there and he [McCauley] was tearing * * this tier down. * * Ton get a hook into it and roll it down and he was standing right there, had one leg kind of right inshore of the pile he was tearing down and the other leg out kind of bracing himself up; a man has got to get a bracing; when he is pulling away this here tier fell down, it seemed like it jarred a little bit, jarred enough to knock this timber over and it kind of slipped down on his leg. I was looking at it and saw it at the time it came; * * It kind of slipped down on his leg and caught him on the ankle * * .”
The complaint was drawn upon the theory that both the Columbia County Lumber Company and the
“That the said dock was built high upon piling and sling loads of lumber of great weight were being handled, hoisted and lowered upon said dock by machinery, and the lumber piled thereon was piled in an irregular manner and without any lateral support, and the jar and movement of the dock and the ship’s tackle, because of the handling of the lumber thereon by the ship’s tackle and by the stevedores, was liable to cause said lumber piles to tip over and fall, and the said sling loads were liable to and did swing in various directions as they were being hoisted or lowered upon said dock, all of which was well known to and appreciated by the defendants, but notwithstanding the defendants wholly and entirely failed, omitted and neglected to use every device, care or precaution which it was practicable to use for the protection and safety of the life and limbs of this plaintiff * *
The complaint specifies the acts of alleged negligence as follows:
“The defendants had caused heavy timbers to be piled upon said dock immediately behind and close to the pile on which plaintiff was working, and the said heavy timbers were so piled that those on top did not rest squarely upon those underneath but extended out over the edge thereof, and, while this plaintiff was about his duty of building a sling load of lumber, a sling load of lumber, being removed by the ship’s tackle from the opposite side of the pile from which plaintiff was working, was so carelessly and negligently swung against the dock and the lumber piled*141 thereon, that one of the heavy timbers which was piled just behind where plaintiff was working, fell to the surface of the dock * * .
“They piled the said heavy timber upon the edge of the timber next below and without any support to keep it from falling off, so that when the timbers adjacent and near thereto were necessarily removed to make up said sling load of lumber, and on account of the jarring and movement aforesaid, the said heavy timber, so negligently piled as aforesaid, suddenly and unexpectedly, and without any notice to the plaintiff, fell from a portion of a pile of lumber behind plaintiff, thereby injuring him as aforesaid.
“That the ship’s winches and tackle were handled and operated in such manner as to strike heavy sling loads’ of lumber violently against the dock and against the lumber piles on said dock, thereby shaking and jarring the whole dock and the lumber thereon.
“In that they failed to use any device, care or precaution whatsoever for the safety of the life and limbs of this plaintiff, although it would have been practicable and expedient to pile the said lumber regularly and squarely one piece on top of the other, and to handle the ship’s tackle in such manner that sling loads of lumber would not be bumped violently against the dock or the piles of lumber thereon.”
There was no evidence to sustain the allegation that a sling load removed by the forward gear from the south side of the pile was swung against the dock or against the lumber piled thereon and thus caused the injury. While it is conceded by all parties that the forward gear was kept moving just as was the after gear, a finding that a sling load taken from the south side of the pile struck against the pile of lumber or against the dock and was the immediate cause of the falling of the piece that struck plaintiff, would, on the record presented to us, amount to a mere guess, especially in view of the testimony of the wit
The plaintiff sued the Columbia County Lumber Company and the steamship "Willamette” as joint defendants. In thus suing the vessel the plaintiff availed himself of the boat lien law and consequently in so doing joined an action at law against the lumber company with a suit in equity against the vessel. If the question as to whether or not a proceeding’ against a vessel under the chapter known as the boat lien law is to be prosecuted as an action at law or as a suit in equity were res integra, the writer would have difficulty in agreeing with the view that it is to be prosecuted as a suit in equity. But however that may be, the question is one merely of procedure, of adjective law; and whether the proceeding is prosecuted as an action at law or as a suit in equity the question of whether a plaintiff is entitled to recover at all and if so how much is a matter of substantive law, and the ultimate right of the plaintiff is the same whether the proceeding is under one mode or the other; and therefore since in Cordrey v. Steamship “Bee,” 102 Or. 636 (201 Pac. 202, 20 A. L. R. 1079), it was determined that the statute contemplated that the proceeding shall be prosecuted as a suit in equity the rule there announced ought, in the interest of
The defendants objected to the complaint upon the ground that it embraced a suit in equity together with an action at law. It is appropriate to add that the instant case was tried before the announcement of the decision in Cordrey v. Steamship “Bee.” Under the doctrine of Cordrey v. Steamship “Bee,” the claimant was entitled to have the cause tried as a suit in equity; and the plaintiff was not entitled to join in the same complaint an action at law against the Columbia County Lumber Company with a suit in equity against the vessel and then try the cause of action and the cause of suit as a single action at law.
If the work in which plaintiff was engaged came within the Employers’ Liability Act it was brought within the act only because of the “and generally” clause of Section 1 of the act. It is true that the floor of the dock was, at the edge of the dock, more than 20 feet from the ground; but that clause of the act which relates to a structure more than 20 feet from the ground has no application to the place where the plaintiff was working. The question here involved is not whether the defendants were negligent in not sufficiently securing the dock from swaying and in not properly guarding it with a rail so as to prevent a person from falling from the dock. The plaintiff was not hurt by a fall from the dock; he was injured on the dock and while at work on the dock at a place between 40 and 120 feet from the edge of the dock. Hence, if the instant case is governed by the Employers’ Liability Act it is so governed only because it is embraced by the language of the “and generally” clause. '
But the “and generally” clause did not govern the lumber company. The piling of the lumber had been completed about three weeks before the steamship came for the lumber. The work of the lumber company was ended when the piling of the lumber was completed. Nothing more remained to be done with or about the lumber except to load it upon the vessel; and the work of loading the lumber was entirely under the control of the captain of the ship. McCauley and all the other longshoremen were “employees of the ship,” took their orders “direct from the captain of the ship,” and were paid by the captain. The language of the “and generally” clause is: “Having charge of, or responsible for, any work involving a risk or danger to the employees.” The only work being done was the work in which the steamship alone was engaged and for which it, or its owner, was responsible. Not a single employee of the lumber company was at work anywhere upon or about the dock. The lumber company had done nothing on the dock for three weeks. We are not now concerned with any inquiry about the degree or extent of the common law duty of the lumber company; for our only inquiry now is whether or not the Employers’ Liability Act was applicable to the lumber company. To apply the Employers’ Liability Act to the lumber company in the attending circumstances would be judicially to extend the statute far beyond the intent of the enactment as that intent is gathered from the wording of the act and the history of its adoption. The instant case is readily distinguishable from Borvik v. North Pacific Lumber Co., 99 Or. 58
The judgment is reversed and the cause is remanded for such further proceedings as may be consistent with this opinion.
Reversed and Remanded. Rehearing Denied.