MEMORANDUM OPINION
Plaintiffs MBI Group, Inc. (“MBI”) and Altantie Group, SCI (“Atlantic”) bring this lawsuit against Credit Foncier du Camer-oun (“CFC”) and the Republic of Cameroon seeking damages for breach of contract, fraud, misrepresentation, intentional interference with contract, and misappropriation of trade secrets and proprietary information. This controversy arises out of an agreement by which plaintiffs would take the lead in constructing a series of affordable housing projects in Cameroon with CFC providing the land and funding for that initiative. As plaintiffs would have it, the deal was scuttled by CFC and Cameroon when MBI and Atlantic refused to deliver bribes that were demanded by certain officials within the government of Cameroon. Defendants, by contrast, deny the accusations of bribery and insist that there was no binding agreement to begin with. Claiming immunity subject to the Foreign Sovereign Immunities Act, 28 U.S.C. §§ 1602-1611, defendants have moved to dismiss the complaint for an absence of subject matter jurisdiction. They also claim that the action should be dismissed for lack of personal jurisdiction and on forum non conveniens grounds. Plaintiffs, for their part, oppose defendants’ motion to dismiss and have moved for jurisdictional discovery in their own right. Those motions are fully briefed and ripe for resolution. Upon careful consideration, and for the reasons set forth below, the Court will deny plaintiffs’ motion for discovery and grant defendants’ motion to dismiss on forum non conveniens grounds.
BACKGROUND
MBI is a Delaware corporation that has “designed and developed a business plan, program and model for the construction, marketing, sale and operation ... [of] affordable housing in regions of the world with limited or undeveloped housing infrastructure.” Compl. ¶¶ 4, 9. Cameroon, of course, is a sovereign nation located in Africa. CFC is a corporation organized under the laws of Cameroon.
See
Defs.’ Mot. Mekongo Deck ¶ 3. The majority of CFC’s shares are owned by the government of Cameroon.
Id.
CFC’s stated purpose is to make affordable housing available to Cameroon’s citizens.
Id.
¶ 5. To that end, CFC is funded in part by a 1% tax levied on the salaries of workers in Cameroon who earn over 50,000 CFA Francs per month, as well as a .25% payroll tax on employers in the country.
Id.
According to plaintiffs, CFC first approached MBI in November 2003 “and solicited MBI’s participation in the development and the implementation of an affordable housing program in Cameroon.” See Compl. ¶ 14. That contact was made through Joseph Edou, who was the General Manager of CFC during the relevant time period. Id. Edou represented to MBI that Cameroon lacked a supply of affordable housing and that CFC “desired to enter into an agreement with an entity that would serve as a developer ... [and] implement an affordable housing program which would be rolled out in various cities in Cameroon.” Id. ¶ 15. The Overseas Private Investment Corporation (“OPIC”) is a U.S. government agency that aims “to develop robust housing markets through construction of affordable homes in developing nations with the goal of bolstering retail banking and fueling local capital markets as engines of entrepreneurship.” Id. ¶ 12 (internal quotation marks omitted). Plaintiffs assert that “CFC desired to attract financing and support for an affordable housing program from agencies such as OPIC,” and CFC recognized that “financial support from OPIC required substantial financial participation from an American entity,” such as MBI. Id. ¶ 15.
Due to MBI’s familiarity with OPIC and its interest in the Cameroon project, MBI officials traveled to Cameroon to investigate the feasibility of the undertaking. Id. ¶ 16. MBI then submitted a “formal expression of interest” in the project at CFC’s request. Id. ¶ 17. After CFC responded that the proposal “conformed with CFC’s requirements,” MBI began taking preliminary steps to “commence master planning” of the project. Id. ¶ 18. One such step was the creation of Atlantic on March 24, 2004. Id. ¶20. Atlantic was incorporated under the laws of Cameroon “specifically for the development and implementation of the Cameroon Housing Project.” Id. Atlantic, however, is not a wholly owned subsidiary of MBI. In fact, MBI directly owns only 35% of Atlantic. See Defs.’ Mot. Ngwafor Decl. ¶ 13. Roger Tchoufa, a co-founder of MBI, owns another 20% of Atlantic in his personal capacity. Id. The remaining 45% of Atlantic stock is owned by a company known as The Falls. Id. The Falls is a public limited company organized under the laws of Cameroon. Id. ¶ 10. The sole shareholder of The Falls is Ateba Minkoulou Gabriel, who is evidently Joseph Edou’s brother-in-law. Id. ¶ 10; Defs.’ Mot. Mek-ongo Deck ¶ 19. As defendants would have it, this arrangement is merely a front and the true owner and driving force behind The Falls is in fact Joseph Edou.
In any event, in May 2004 the parties were engaged in an effort to formalize the tentative agreement between MBI and CFC. In order to facilitate that, Edou traveled to the United States for two weeks and MBI arranged for him to meet with several officials of OPIC and the U.S. Department of Housing and Urban Development, among other agencies.
See
Compl. ¶ 25. Also present during this period was Andre Booto A Ngon (“Booto”), then the Chairman of the Board of CFC.
See
Pl.’s Opp’n Tchoufa Deck ¶¶ 10-11. On May 18, 2004, MBI and CFC signed a Memorandum of Agreement in Bethesda, Maryland memorializing the deal between the parties.
See
Compl. ¶ 26. Edou signed the agreement on behalf of CFC,
(a) project development and construction financing of approximately forty nine million dollars (US$49,000,000.00) and all necessary financial guarantees for the Yaounde Phase I Project; (b) land on which approximately 1,100 affordable housing units would be constructed by Plaintiffs for the Yaounde Phase I Project; (c) mortgage financing for the buyers of the 1100 units for the Yaounde Phase I Project; and (d) the identity of over 50,000 potential home buyers. CFC also confirmed the availability of mortgage funds for at least 5,000 to 6,000 houses over the next four years.
Id. ¶27 (internal quotation marks omitted). In return, MBI and Atlantic agreed to “be responsible for the selection and supervision of the contractors and consultants for the housing project,” to “carry out a feasibility study for the housing project ... [and to serve] the role of Developer.” Id. ¶¶ 28-29.
Soon thereafter, plaintiffs retained the services of Group Five International (“Group Five”), a South African construction company, to “carry out pre-construction studies of the Project and to prepare detailed cost estimates.” Id. ¶ 31. During November 2004, plaintiffs submitted a feasibility study to CFC. Id. ¶ 33. CFC requested certain changes to the project in lieu of the study’s findings; plaintiffs promptly made those changes and resubmitted another proposal to CFC on December 8, 2004, which plaintiffs allege was then accepted by CFC. Id. ¶¶ 34-37. Plaintiffs then contracted with Group Five to undertake the construction project dubbed “Yaounde Phase I.” Id. ¶¶ 39-40. In furtherance of that agreement, CFC delivered $4,750,000 in funding to Group Five to begin the project. Id. ¶ 40.
On July 23, 2005, plaintiffs allege that CFC “handed over to Plaintiffs and to Group Five 102 hectares of land for the construction and the completion of the Yaounde Phase I Project” at a public ceremony. Id. ¶45. On July 15, 2005 and August 11, 2005, respectively, plaintiffs and CFC signed two additional Memoran-da of Agreement in Cameroon. Id. ¶¶ 47-52. Joseph Edou signed for CFC on both occasions. Those agreements purported to expand upon the initial 2004 Memorandum of Agreement to provide for additional phases of the Cameroon housing project. Plaintiffs timely took steps to begin performance under both agreements. Id. ¶¶ 54-57. Indeed, in reliance upon the July 15th Agreement, plaintiffs submitted an application with OPIC in Washington, D.C. for construction financing for the Yaounde Phase II Project. Id. ¶ 50. And pursuant to the August 11th Agreement, plaintiffs also submitted a Preliminary Application for Guarantee with the Multilateral Investment Guarantee Agency of the World Bank. Id. ¶ 54.
Notwithstanding the progress that the parties appeared to be making on the project, plaintiffs allege that the endeavor began to unravel during “August or September 2005” when “officials of Cameroon solicited and demanded a bribe in connection with the Cameroon Project.”
Id.
¶ 60. That demand was communicated to plaintiffs through Joseph Edou. Plaintiffs steadfastly refused to pay any bribe, a stance that Edou evidently shared.
Id.
¶¶ 60-61. Due to Edou’s opposition to the bribery demands, plaintiffs contend that he was removed from his position at CFC and replaced by Camille Ekindi on September 13, 2005. Upon subsequent meetings between plaintiffs and Mr. Ekin-di, plaintiffs learned that Mr. Ekindi had
Plaintiffs “took all reasonable and prudent steps to continue or resume the Cameroon Housing Project and, in particular, the Yaounde Phase I Project.” Id. ¶ 85. Their efforts, however, were ultimately unsuccessful. As a result, “Group Five terminated its existing agreements and commenced the repatriation of its employees.” Id. ¶ 84. Tchoufa met a final time with Mr. Ekindi at CFC’s offices on February 15, 2006. Id. ¶ 86. At that meeting, Tchoufa contends that Mr. Ekindi “admitted that Defendants had no basis for objection to the revised plans, and that those plans had been approved by the relevant Cameroon land development agency.” Id. ¶ 87. Nevertheless, Mr. Ek-indi reportedly indicated that “there was no hope that the Cameroon Housing Project, and in particular the Yaounde Phase I Project would go forward.” Id. After reaffirming that he “would not authorize any payments of any bribes,” Tchoufa left Cameroon and returned to the United States. Id. ¶¶ 87-88.
On March 23, 2006, plaintiffs wrote to defendants demanding compensation for the damages caused by defendants’ breach of the existing agreements. Id. ¶ 89. Plaintiffs explicitly noted that defendants’ “conduct ... is conventionally associated with allegations of graft and corruption.” Id. Tchoufa asserts that, in apparent retaliation for those accusations, Cameroon officials improperly arrested his wife’s secretary and imprisoned her for one week without any formal charges. Id. ¶ 90. Additionally, the government seized portions of property belonging to Tchoufa and his wife and supposedly directed threats towards other members of Tchoufa’s family. Id. Moreover, during September 2006, one of Tchoufa’s relatives was arrested and Cameroon officials allegedly demanded a $200,000 bribe to secure the relative’s release. Id. ¶ 91. In fact, Tchoufa himself was incarcerated for nearly a month in the Ivory Coast on the basis of an Interpol notice allegedly issued by Cameroon; he was eventually released following the intervention of the United States Embassy. See Pl.’s Reply Tchoufa Deck ¶ 24. These incidents have convinced Tchoufa and plaintiffs that they “cannot receive a fair hearing in any court in the Cameroon.” See Compl. ¶ 96.
Defendants tell a different story, however. As they would have it, CFC was the victim of unauthorized self-dealing by rogue agents, specifically Edou and Booto. According to defendants, Edou had no authority to enter into the initial 2004 Memorandum Agreement because — pursuant to CFC’s by-laws — the general manager lacks the capacity to bind CFC to any contract in excess of $20,000.
See
Defs.’ Mot. At 7. Thus, because the various agreements that Edou signed with plaintiffs called for CFC to deliver approximately $49 million in funding, any such arrangements would require explicit Board of Directors approval.
Id.
And defendants
Under defendants’ view, due both to Edou’s purported lack of authority and also to his supposedly undisclosed ownership interest in Atlantic via The Falls, the agreements between Edou and plaintiffs should be viewed as unauthorized self-dealing. Those acts, according to defendants, led to a criminal indictment against Edou that charged him “with misappropriation and embezzlement of public funds, and conspiring with others to misappropriate funds for fictitious services purportedly rendered.” Id. at 9. Moreover, defendants allege that Tchoufa has been similarly charged and is presently “the subject of a fugitive warrant for his arrest.” Id.
STANDARD OF REVIEW
Forum non conveniens
is a discretionary non-merits threshold inquiry “ ‘designed not merely to defeat the asserted claims, but to preclude judicial inquiry.’ ”
See Public Citizen v. U.S. Dist. Court, Dist. Columbia,
The common-law doctrine has its primary application in federal courts where the alternative forum under consideration is foreign, and in contrast to the statutory doctrine governing venue within the federal-court system, dismissal rather than transfer is the appropriate remedy.
Id.
at 1190-91;
see also
28 U.S.C. § 1404(a);
American Dredging Co. v. Miller,
DISCUSSION
Although
forum non conveniens
involves a nonjurisdictional inquiry, the doctrine nevertheless presents one of the rare occasions where a court may dismiss a ease on prudential grounds prior to assessing its own jurisdiction over the matter.
See, e.g., Sinochem,
As noted above, the forum non conve-niens determination entails a three-step inquiry. The Court concludes that the public and private interest factors overwhelmingly favor trial in Cameroon. Only the initial step — determining whether an adequate alternative forum exists to hear plaintiffs’ claims — gives any real reason for pause. Nevertheless, as explained below, the Court finds that defendants have carried their burden of establishing that dismissal is appropriate on forum non conve-niens grounds.
a. Adequate alternative forum
The threshold question here is whether Cameroon constitutes an adequate alternative forum to hear this action. Defendants make a strong initial showing that the courts of Cameroon are open to hear plaintiffs’ claims and represent an adequate alternative to proceeding before this Court. Their demonstration relies heavily upon various declarations submitted by Professor Ephraim Ngwafor, a Professor of Law at the University of Yaounde II and an active participant in the 1996 revision of Cameroon’s Constitution. See Defs.’ Mot. Ngwafor Decl. ¶¶ 2, 8. To begin with, defendants maintain that courts in Cameroon would have jurisdiction over this lawsuit. See Defs.’ Mot. Ngwafor Supp. Deck ¶ 2. Indeed, neither sovereign immunity nor the applicable statute of limitations (evidently thirty years in Cameroon) would bar plaintiffs’ claims before the courts of Cameroon. Id. Moreover, according to defendants, there are analogous Articles contained in the Civil Code of Cameroon that would encompass each of plaintiffs’ asserted causes of action here 3 and monetary damages are similarly available in that forum. See Defs.’ Mot. Ngwa-for Deck ¶ 22. Both CFC and the government of Cameroon would be required to pay any damages that are awarded against them and CFC’s property in Cameroon would be subject to attachment in order to satisfy any judgment against the entity. Id. Defendants also contend that Cameroon’s judiciary is “independent of the executive branch of government” by virtue of its Constitution and that “the executive branch of the government cannot direct the courts’ decisions.” Id. ¶ 21.
Finally, defendants point out that all of the purported Memoranda of Agreement at issue in this case call for the law of Cameroon to govern any disputes arising out of the agreements. See Defs.’ Mot. at 26-27. Moreover, the latter two agreements contain an express forum selection clause that calls for adjudication before the High Court of Yaounde. Id. at 27. Thus, as defendants would have it, plaintiffs themselves view the courts of Cameroon as an adequate forum for adjudicating disputes because they specifically consented to exclusive jurisdiction before those tribunals in two of the purported agreements.
Plaintiffs, however, insist that Cameroon is not an adequate and independent forum to resolve this dispute. In support of that
In addition to those generalized criticisms of Cameroon’s judiciary system, plaintiffs submit that Cameroon’s “treatment of Mr. Tchoufa ... leaves no room for the conclusion that Cameroon is a viable alternative or that ‘plaintiffs can reinstate their suit in the alternative forum without undue inconvenience or prejudice.’ ”
Id.
at 38 (quoting
Friends for All Children, Inc. v. Lockheed Aircraft Corp.,
Notwithstanding some lingering concerns regarding possible hostility towards plaintiffs in the foreign forum, the Court concludes that under the law Cameroon is nevertheless an adequate alternative situs for this lawsuit for purposes of
forum non conveniens.
Plaintiffs’ generalized allegations regarding the state of Cameroon’s judiciary are unavailing. To begin with, as defendants correctly note, the law review article on which plaintiffs rely was written in response to a decision of the African Human Rights Counsel. Mr. Kofele-Kale’s article criticizes that decision, which dismissed certain claims before the Counsel because domestic remedies had not first been exhausted in Cameroon.
See
Defs.’ Reply at 17 n. 19. Responding to that failure to exhaust, Mr. Kofele-Kale opined that such exhaustion should not be required due to certain deficiencies in Cameroon’s judicial system.
Id.
But whatever the merits of Mr. Kofele-Kale’s argument in that particular context, one author’s criticism of Cameroon’s judiciary in response to an adverse decision does not constitute the sort of evidence required to
Moreover, binding authority in this jurisdiction defeats plaintiffs’ reliance upon the State Department’s report concerning Cameroon’s judiciary. In
El-Fadl v. Central Bank of Jordan,
the D.C. Circuit explained that a “foreign forum is not inadequate merely because it has less favorable substantive law, because it employs different adjudicative procedures, ... or
because of general allegations of corruption in the judicial system.”
Turning to their next assertion of inadequacy, plaintiffs insist that Cameroon’s treatment of Tchoufa is indicative of broad hostility towards plaintiffs. That suggests, the argument goes, that Cameroon’s judiciary would be prejudiced against their lawsuit. Defendants contend, however, that the “alleged actions relate to Mr. Tchoufa personally rather than the companies MBI and Atlantic.” See Defs.’ Reply at 19. That seems correct. There is no reason to conclude that other principals from MBI or Atlantic would be subject to adverse treatment by Cameroonian authorities, nor do plaintiffs assert that any counsel that they might secure would be precluded from filing suit in that jurisdiction. Most importantly, the alleged actions at issue were taken by the executive branch of the Cameroonian government, not by the judiciary. And defendants have submitted evidence that Cameroon’s judiciary is formally independent of the executive as a matter of the nation’s Constitution. As explained above, plaintiffs cannot disturb that presumption of independence by merely pointing to generalized reports that the executive branch may exert undue influence over the judiciary. 4
In sum, defendants have submitted ample evidence to demonstrate that Cameroon’s courts would have jurisdiction to entertain this suit and sufficient means to accommodate each of the claims that plaintiffs have presented in this case. Moreover, money damages are available in Cameroon and plaintiffs’ suit would not be barred by sovereign immunity in that forum. As the First Circuit put it, “[c]ourts generally deem [the alternative forum to be adequate] if the defendant demonstrates that the alternative forum addresses the types of claims that the plaintiff has brought and that the defendant is amenable to service of process there.”
Iragorri,
Nevertheless, in an abundance of caution and to avoid any potential undue prejudice to plaintiffs, the Court will condition dismissal upon defendants’ submitting to jurisdiction in Cameroon and on the Cameroonian courts’ acceptance of the case. The D.C. Circuit has expressly authorized this course of action on at least one prior
b. Private interest factors
There is ordinarily a “strong presumption” in favor of a plaintiffs choice of forum.
See Piper,
(1) the relative ease of access to sources of proof; (2) the availability of process for compelling unwilling witnesses; (3) the cost for obtaining attendance of willing witnesses; (4) the possibility of inspecting the premises, if appropriate; and (5) all other practical problems that make trial of a case easy, expeditious, and inexpensive.
Irwin,
First of all, with respect to the relative ease of access to the sources of proof, the Court notes that there is a built-in obstacle here concerning any documents originating or located in Cameroon.
7
That
Defendants have identified no fewer than seven necessary witnesses located in Cameroon, and that is likely a conservative estimate on their part. Significantly, it appears that any witness located in Cameroon is beyond the means of this Court’s compulsory process.
See Irwin,
And just as in
Irwin,
even if some witnesses are willing to attend trial, “the cost of bringing [those] witnesses to Washington, D.C. would be significant.”
In sum, the balance of private interests strongly tilts towards hearing this case in Cameroon rather than the District of Columbia. As explained below, the public interest factors implicated by this case likewise favor dismissal.
c. Public interest factors
The pertinent public interest factors in the forum non conveniens analysis are:
(1) administrative difficulties caused by foreign litigation congesting local court dockets; (2) local interest in having localized controversies decided at home; (3) imposing jury duty on residents of a jurisdiction having little relation to the case; and (4) avoiding unnecessary problems in choice-of-law and the application of foreign law.
Irwin,
The next component of the public interest factors analysis — the interest in having localized controversies decided at home— also plainly suggests dismissal. As defendants aptly put it, “this dispute centers on Cameroon and almost everything relevant to the dispute occurred in Cameroon. The dispute concerns an alleged real estate development project in Cameroon and will involve Cameroon legal issues, Cameroon witnesses, and events in Cameroon.”
See
Defs.’ Reply at 21. To be sure, there are some tenuous connections to the United States
9
involved in this case. The initial Memorandum of Agreement was signed in Maryland, for instance, and certain CFC officials are alleged to have made several trips to the United States in connection with the proposed building project. And MBI, of course, is a domestic corporation. Any interest that the United States may have in this litigation ends there, however. Cameroon, by contrast, clearly has a far stronger stake in this controversy. This dispute concerns an agreement to build a series of affordable housing projects in Cameroon. Plaintiffs have also accused officials of the Cameroonian government—
Cameroon plainly has a strong interest at stake in this litigation. The United States, however, does not. From the national perspective of the United States, this is simply an ordinary breach of contract case that just so happens to involve a domestic corporation dealing with an instrumentality of a foreign sovereign. Although it is true that the United States has some national interest in ensuring that its domestic corporations can obtain recourse when they are aggrieved when engaging in commercial activities abroad, in this case that interest pales in comparison to Cameroon’s stake in adjudicating a dispute that involves accusations of bribery against government officials and an affordable housing project of national concern. As between the two potential fora, Cameroon’s substantially more powerful interest in this litigation supports dismissal.
See, e.g., Croesus,
Finally, and significantly, this Court’s lack of familiarity with Cameroonian law, and other issues involved with the application of foreign law, weighs heavily in favor of dismissal. The alleged agreements at issue in this case all expressly call for the application of Cameroonian law to govern any disputes arising out of them. Moreover, at least two of the agreements contain a forum selection clause identifying the High Court of Yaounde, Cameroon as the proper tribunal to adjudicate any disputes. As explained above, the applicable portions of that body of law are based on the Civil Law model rather than the common law. This Court has no
a priori
familiarity with the Civil Law system. Plaintiffs point out that Fed.R.Civ.P. 44.1 would allow foreign law to be proved during the course of the litigation. That is true, but plaintiffs are far too dismissive of the difficulties associated with that course of action. A proceeding before this Court applying Cameroonian law would require the testimony of several legal experts familiar with that body of law. And the testimony of those experts would likely have to be translated from French into English as well. Moreover, as in
Croesus,
“the Court’s analysis of foreign law issues will be impeded by its inability to work directly from the original [foreign-language] legal sources.”
In sum, this a case that primarily involves the nation of Cameroon. The supposed agreements contemplated performance in Cameroon in the form of the construction of affordable housing units. The agreements also called for the law of Cameroon to govern any disputes arising out of the endeavor. Moreover, the alleged bribery demands and accompanying breach of the agreements all occurred in Cameroon. Many of the governing documents are located
II. Plaintiffs’ Motion for Discovery
That leaves one final issue. Plaintiffs have requested jurisdictional discovery on all of the grounds for dismissal raised by defendants, including
forum non conve-niens.
The Court will not belabor this point, particularly because plaintiffs do not appear to have articulated a specific need for discovery on the
forum non conveniens
issue. In
Croesus,
this Court indicated that it “does not believe that this is an appropriate issue for exploration through discovery. If plaintiff had evidence— through judicial decisions, legal experts or otherwise — of the mistreatment of foreign plaintiffs in Brazilian courts, they could have offered it.”
CONCLUSION
For the foregoing reasons, the Court will grant defendants’ motion to dismiss for forum non conveniens and deny plaintiffs’ motion for jurisdictional discovery. A separate Order accompanies this Memorandum Agreement.
Notes
. The prior forum non conveniens test in this Circuit, cited by defendants in their briefing, has been partially superseded by Supreme Court precedent. In Pain v. United Tech. Corp., the D.C. Circuit outlined the following process for determining whether to dismiss a case for forum non conveniens:
As a prerequisite, the court must establish whether an adequate forum exists which possesses jurisdiction over the whole case. Next, the trial judge must consider all relevant factors of
private
interest, weighing in the balance a strong presumption against disturbing plaintiff’s initial forum choice. If the trial judge finds this balance of pri
. Although it is not relevant to the
forum non conveniens
analysis, the Court notes that CFC qualifies as "an agency or instrumentality of a foreign state” under the FSIA.
See
28 U.S.C.
. See Defs.’ Mot. Ngwafor Deck ¶ 22 (breach of contract covered by Articles 1147 and 1184, deceit and fraudulent misrepresentation covered by Article 1116, negligent misrepresentation covered by Article 1383, intentional interference with contract covered by Articles 1165 and 1382, misappropriation of intellectual property and trade secrets covered by Article 1382).
. The affidavit of the Cameroonian attorney submitted by plaintiffs contains no specific basis or reasoning for its conclusion that plaintiffs would not receive a fair trial in Cameroon other than the treatment received by plaintiffs to date at the hands of certain
. The fact that plaintiffs have previously consented to suit in Cameroon by way of the forum selection clause contained in two of their agreements with defendants lends further support to the conclusion that Cameroon is an adequate forum for this dispute. Plaintiffs’ only response to that supposition is that forum selection causes should not be enforced if there are "compelling and countervailing reason[s]” not to do so. See Pl.’s Opp’n at 36 n. 29 (citations omitted). But that contention is beside the point. The Court is not enforcing any mandatory forum selection cause contained in those agreements. Instead, the clause merely serves as evidence of the adequacy of Cameroon as a forum for this dispute.
. The parties quarrel over the appropriate weight to assign to plaintiffs' choice of forum in this case. As plaintiffs would have it, MBI's choice of forum is entitled to the full presumption of appropriateness because it is a U.S. corporation and it has chosen to pursue this lawsuit in its “home” forum.
See
Pis.' Opp'n at 41 (quoting
Presbyterian Church of Sudan v. Talisman Energy, Inc.,
. Those documents include the "books and records of CFC and other documents related to the alleged housing project.”
See
Defs.’ Reply at 23. Moreover, the "site of the al
. As this Court stated in
Croesus,
"because claims under the FSIA are not eligible for resolution by a jury, there is no particular burden on the community imposed by the litigation here.”
. Plaintiffs' asserted "local” interest is actually entirely "national.” There is no suggestion whatsoever that this matter has anything to do with the District of Columbia, other than the mere fact that some of the government agencies that played de minimis roles in this affair are located here.