143 P. 648 | Or. | 1914
delivered the opinion of the court.
“The party of the first part will save the party of the second part free and harmless from the payment of any and all liens which may be enforced on account of any material furnished or labor performed on said building and premises, or any part of either thereof; and the said party of the second part further covenants and agrees that he will not allow any laborer’s, mechanic’s, materialman’s or any lien or liens to be filed against the said building and premises, or any part of either thereof, and, further, that the said building and premises and every part of either thereof shall be at all times free from any and all liens.”
This stipulation was against “any and all liens,” without discrimination between the claim of the original contractor and that of any subcontractor, mechanic or laborer, and it was properly held that this constituted a waiver on the part of the contractor of any lien in his own favor. Having promised to keep the building and premises always free from “any and all liens” without distinction, he could not be heard to claim a lien for himself.
The statute, however, differentiates between the original contractor, mechanic, artisan, materialman and laborer. It is a duty of the former to file his claim of lien in 60 days, and of all other parties to file their
“The plaintiffs neglected and failed to provide any drainage from exterior moisture and seepage, with soil drains under the walls, or to place therein any drains whatever.”
This is explicitly provided for in the specifications made part of the contract, and the plaintiffs themselves admit that it was overlooked and not installed. It is also required that the contractors shall “lay a cement floor over entire basement area, * * with an even and sufficient drainage to all floor drains and traps.” The testimony of the plaintiffs shows that the basement floor is so fashioned that it will not com
“The contractor shall make no changes, alterations or substitutions to these specifications, or to the blueprints and drawings, nor to the building during its construction without permission of the architect in writing, approved of by the owner in writing, and duly acknowledged by the contractor in writing over his own signature.”
No pretense is made that the omission of the drain tile, or the manner in which the basement floor was constructed, was authorized by the architect or the owner. Having alleged performance of the contract, and it having been denied by the defendant, it was incumbent upon the plaintiffs to prove the allegation as laid, under the statutes that “ evidence shall correspond with the substance of the material allegations” and “each party shall prove his own affirmative allegations”: Sections 725 and 726, L. O. L.; Hannan v. Greenfield, 36 Or. 97 (58 Pac. 888); Young v. Stickney, 46 Or. 101 (79 Pac. 345); Richardson v. Investment Co., 66 Or. 353 (133 Pac. 773).
The conclusion is that the plaintiffs cannot prevail in this suit to foreclose their lien, but must be remitted to such action at law, either on the contract or upon the quantum meruit, as they may think proper in the premises.
The decree of the Circuit Court is affirmed.
Affirmed.