141 S.E. 782 | W. Va. | 1928
From a judgment against them jointly for $1,100.00 the defendants, the City of Bluefield and the Princeton Power Company, have prosecuted separate writs of error in this Court.
Plaintiff's action was for damages alleged to have accrued to him by the act of the power company in elevating its street car line on Princeton Avenue by direction of the city and on a grade designated by the latter, which collected waters coming into said avenue from other connecting streets and threw the same upon his property, to his injury. Plaintiff's house and lot are located on the south side of Princeton Avenue, along and on the north side of which street the defendant power company maintained and operated its street *211 car line. A few months before the time of the injury complained of, the city began plans to pave Princeton Avenue by placing thereon a seven inch slab of concrete, and directed the power company to raise its track to the level established by the city engineer. At the time of the injury complained of, the power company had completed the raising of its car line on a strip of concrete laid by it, in front of plaintiff's lot, but the city had not commenced to lay concrete on the remainder of the street.
It is contended that the flood was an unusual and unprecedented one, an act of God, which neither of the defendants were chargeable with providing against. Witnesses for both plaintiff and defendants testified that they had seen in the same community as great or greater storms or floods in recent years. The character of the evidence was such as to present this question of fact to the jury.
Error is assigned in the refusal of the trial court to set aside the verdict of the jury as being excessive and not supported by the evidence. The testimony of the plaintiff, his wife, a plasterer and a carpenter, as to the goods destroyed, and as to the amount of money expended and necessary to put the building in repair, show items amounting to several hundred dollars more than the verdict. It is not pointed out in what particular any of these items are incorrect, and we cannot say they are excessive.
It is argued that the city is not liable for damages, because the water thrown upon plaintiff's premises was only surface water. For this proposition counsel rely on the case ofJordan v. City of Benwood,
Defendants contend that the trial court erred in refusing to give to the jury their instruction No. 1, that "it was the duty of the plaintiff to remove such goods from his basement, as might have been removed, by the exercise of reasonable diligence, before being seriously damaged by virtue of the act complained of" etc. The rain causing the sudden rise of waters began about eleven o'clock at night, and before plaintiff was aware of the fact, his basement was flooded to the depth of about five feet. It is contended that he was negligent in not immediately removing from the water what of the goods injured could have been carried out, in an effort to mitigate damages. The articles injured in the main consisted of fruits and vegetables canned and preserved, some of which were in jars covered with cloth, some window shades and rugs temporarily stored there while the remainder of the house was being papered and painted, and a supply of fuel coal. Damages were also claimed for injury to a furnace, and the walls and foundation of the house. Mrs. Mason testified that she did remove and use such of the canned fruits as were not injured. The court instructed the jury that it was the duty of the plaintiff to save as much of the property as possible in order to minimize damages, and that if they found from the evidence that he failed to exercise reasonable *213 care in trying to do so, the jury should take that question into consideration in minimizing the damages in the case. It does not clearly appear what plaintiff could have done in the way of removing from five feet of water in a basement any of the property in time to save it from injury. It does appear that it was several days before the water ran or seeped out of the basement, but plaintiff testified that there was no other way to remove it except to carry it out in buckets.
The city claims that since the power company constructed the concrete slab alleged to have caused the injury, it alone should be held to damages. The evidence does not show by what authority the city directed the power company to lay a part of the street surface, but it is admitted that such directions were given, and that the grade established by the city was followed. The work was done at the direction of the city, for its benefit, not that of the power company. When completed, the concrete strip became a part of the city's street. And unless the sole negligence of the power company caused the injury, the city would not be relieved, if then. The evidence shows that on top of the concrete, to protect it from traffic until it had hardened, the power company placed somewhere near plaintiff's lot some sort of wooden structure about two inches in thickness, but it is not made clearly to appear that this contributed to the injury. The concrete itself was high enough above the level of plaintiff's basement window to cause the water to enter there, and that was laid under the direction of the city, on a grade established by it or its engineer. This case in this respect is different from that of Jordan v. Cityof Benwood, supra, for there the change in grade was made by the street railway company under authority granted by the city, "a mere license," as expressed in the opinion in that case.
It is said that the case was tried on an erroneous theory, and that the measure of damages should have been the difference between the value of the property before and after the injury. This rule applies where the action is for permanent damages to the property due to the grading or changing of grade of an adjoining street. But here the rule laid down inMcHenry v. City of Parkersburg, supra, must be applied, *214
that: "Injury to real property, caused by a city, in the collection of surface water and casting the same upon the premises, by means of the grading and sewering of its streets, so as to subject the same to occasional and intermittent submergence, gives right to recover temporary, not permanent, damages." Rogers v. Boom and Driving Co.,
The power company tendered and was permitted to file its special plea, alleging that it was its duty to comply with the order of the city in raising the part of the street laid by it on the grade established by the city; and issue was joined on this plea. This defendant offered an instruction to the jury to find for it, which was rejected by the trial court. The court, however, on its own motion, over the objection of both defendants, instructed the jury that "if they should believe from the evidence that the raising of the track of the Princeton Power Company caused the water to be diverted from its natural flow over the street on to the property of the plaintiff, thereby causing the injury complained of, then they should find for the plaintiff against both of the defendants," etc.
We are of opinion that the court erred in refusing the peremptory instruction offered, and in giving its own instruction, objected to. It is clear that the power company was only complying with the order of the city, and raising a part of the street grade for the municipality, for the use and benefit of the latter, an obligation assumed as a part of the consideration of its franchise. No negligent act is alleged in the declaration on the part of either defendant. It is charged that the said defendants, not regarding their duty in the premises, without the consent of the plaintiff, by the use of certain material named, constructed in front of and contiguous to plaintiff's lot a cement and concrete pavement and street railway track, by reason of which the injury complained of was caused. Plaintiff evidently relied upon right to damages under section 9 of article 3 of the state constitution.Jordan v. City of Benwood, supra. *215
We are asked to enter a judgment non obstante vardicto in favor of the Princeton Power Company, and to dismiss the action as to it. Issue was joined on its special plea. We find in the record no motion before the trial court, made after verdict, except the joint motion of both defendants, to set aside the verdict and grant them a new trial.
By authority of Pence v. Bryant,
Finding no error in the record prejudicial to the defendant City of Bluefield, the judgment as to it will be affirmed; and because of the error in refusing to direct a verdict for the Princeton Power Company, and in instructing the jury that both defendant were guilty, if either, the judgment as to the power company must be reversed, the verdict against it set aside, and a new trial awarded it.
Judgment reversed; verdict set aside; new trial awarded.