Martorano v. Department of Public UtilitiesMartorano v. Department of Public Utilities
The Tennessee Gas Pipeline Company (Tennessee), a supplier of natural gas, petitioned the Department of Public Utilities (department) for an exemption under G. L. c. 40A, § 3 (1986 ed.), from local zoning regulations in order to permit Tennessee to construct a natural gas meter station in Acton. The department thereupon conducted a public hearing to determine whether the zoning exemption should be allowed. At the hearing, the Boston Gas Company (Boston Gas), and the Acton-Concord Citizen Coalition (coalition), a citizen’s group opposed to the exemption, participated as interveners. On September 24, 1986, the exemption was granted. On October 10, 1986, the coalition moved the department to reopen the proceedings and reconsider its decision, but the motion was denied. The coalition petitioned the Supreme Judicial Court for the county of Suffolk under G. L. c. 25, § 5 (1986 ed.), to set aside or modify the department’s decision. A single justice reported the matter to the full court. There was no error committed by the department.
We summarize the facts found by the department. Wholesalers and retailers of natural gas deliver and receive their product through underground pipeline networks. Gas owned by one company may, by contract, be transported through another
Current levels of gas supplied to Boston Gas by Tennessee are insufficient to meet Boston Gas’s needs during periods of peak demand. Tennessee presently supplies Boston Gas under a “best efforts” contract, i.e., Tennessee has agreed to transport gas when there is space available on its pipelines, but not when all capacity is filled by other customers who have “firm supply” commitments. Until recently, this arrangement has not posed a problem for Boston Gas, because it has been able to rely on Algonquin Gas Transmission Company, in periods of peak demand.
Algonquin has informed Boston Gas that it may no longer depend on this service. Therefore, Boston Gas sought to obtain gas transported by Tennessee on a “firm supply” basis. The two companies agreed that Tennessee would transport the extra gas on a firm supply basis (firm supply contract), but an additional delivery point would be needed to accommodate the extra gas. Boston Gas and Tennessee’s pipeline networks would be connected at this delivery point and a gas meter station would be built above it. A site in Acton (Lawsbrook Road site) was ultimately chosen because (1) it is a location where the Tennessee and Boston pipelines already cross over one another (but are not yet physically connected), and (2) at that particular point on the pipeline, there is sufficient excess capacity to guarantee Boston Gas a firm supply of gas during periods of peak demand. 3
The coalition thereupon moved the department to reconsider its decision and reopen the proceedings on the grounds that (1) Tennessee’s witnesses had made misrepresentations conceming both the carrying capacity of Tennessee’s pipeline and the desirability of the alternative sites, and (2) the hearing examiner improperly relied on an unsworn letter of counsel as evidence in the case. The department denied the motion and this appeal followed.
2.
The cost letter.
At the conclusion of the adjudicatory proceeding, the hearing examiner requested that Boston Gas “estimate the additional cost to Boston Gas associated with the alternative water district site.” In response, Boston Gas submitted a letter outlining costs for both the Acton water district site and the proposed Lawsbrook Road site (cost letter). The coalition complained to the department that the cost letter attempted post hoc to inflate cost estimates already on the record for the Acton water district site and to deflate cost estimates for the Lawsbrook Road site. In its order, the department found that, “[i]n fact, construction costs would be higher at the Water District site . . . .” The only sworn testimony relative to cost presented at the hearing was that of the coalition’s expert witness, Martin Smirlock, also a coalition member, who testified that costs at the Acton water district site would be
lower
than at the Lawsbrook Road site. The
The department found that “construction costs would be higher at the Water District Site” than at the Lawsbrook Road site. Since the only sworn testimony concerning cost came to the opposite conclusion, we must infer that the department’s finding was based on something other than sworn testimony.
Although the department must have relied to some extent on its finding as to the relative costs of the two sites, it would have been warranted in rejecting the Acton water district site even without the cost letter. The department also found the Acton water district site to be less desirable because Tennessee would have only been able to acquire a leasehold interest rather than owning the site. Moreover, the department found that there was no guarantee that Tennessee would be able to obtain regulatory approvals necessary to use the Acton water district site. Furthermore, there is no requirement that the department find the proposed site to be the least expensive one; the availability of alternative sites is pertinent only as a “matterf ] of fact bearing up on the main question whether the proposed site ... is reasonably necessary for the convenience or welfare of the public.”
Wenham
v.
Department of Pub. Utils.,
There must be some showing of prejudice before an agency ’ s disregard of its rules may constitute reversible error.
DaLomba’s Case,
The coalition’s claim that, apart from the violation of 220 Code Mass. Regs. § 1.10, reversible error arose from the department’s admitting the letter in evidence adds nothing. In this context reversible error cannot arise in the absence of prejudice.
3. Carrying capacity testimony. The coalition next contends that the department’s decision was not based on substantial evidence because the decision rested on allegedly false testimony concerning the carrying capacity of Tennessee’s pipelines. Some factual background is necessary.
As proposed by Tennessee, the meter station is to be built along a branch of Tennessee’s pipeline known as “line 200-2.” Two of the alternative sites proposed by the coalition — the Wayland site and the Lincoln site — are located along a different branch of the pipeline, “line 200-1.” At the hearing, two Tennessee engineers — Robert D. Goodenough and Thomas P. Hollo well — testified repeatedly that the Wayland and Lin-coin alternative sites would not be suitable because there was not sufficient excess “capacity” on line 200-1 to accommodate the additional volumes of gas to be transported under the firm supply contract. The department credited this testimony in its initial decision and order and in its denial of the coalition’s motion for reconsideration.
In essence, then, this matter was a factual question involving assessments of credibility which the department chose to resolve in favor of Tennessee. It is not for this court to disturb that choice. “The proper function of the court is not to engage in complex fact determinations more appropriately committed to an agency, with staff and skilled experience to make them. Rather, the court must accept the factual determinations made by the agency if it finds they are supported by substantial evidence . . . .”
School Comm. of Boston
v.
Board of Educ.,
Moreover, the department determined that the allegedly false statements were actually material taken out of context and misquoted by the coalition. D.P.U. 85-207-A, at 10 (1986). The department examined the hearing transcripts, the INGS document,
6
affidavits from Goodenough and Hollowell reaf
The department simply accepted the testimony and the expertise of Goodenough and Hollowell over that of Smirlock. Thus, there is no basis for contending that its decision was based upon false and misleading testimony.
4.
The department’s consideration of alternative sites.
Lastly, the coalition claims that the department was arbitrary in its evaluation of alternative sites. According to the coalition, the department was required to consider whether the public benefit of the proposed facility outweighed the adverse local impact. The coalition concedes that the department did evaluate the Lawsbrook Road site in terms of all the relevant criteria (see
New York Cent. R.R.
v.
Department of Pub. Utils.,
General Laws c. 40A, § 3, imposes no requirement that the department consider and reject every possible alternative site presented to it by an intervener. “[T]he availability of other sites and the efforts made to secure them, in so far as pertinent at all, are merely matters of fact bearing up on the main question.”
Wenham
v.
Department of Pub. Utils.,
Furthermore, while our decisions certainly require a “statement of reasons” from the department on each issue of fact or
So ordered.
Notes
Tennessee’s claim that this portion of the pipeline is the only place where it has sufficient excess capacity has been a hard-bitten bone of contention in this dispute. The coalition asserts that Tennessee could have
The sites suggested by the coalition are all located on a branch of Tennessee’s pipeline known as “line 200-1.” The Lawsbrook Road site for which Tennessee seeks approval is located on line 200-2. Line 200-2 has more capacity than line 200-1 because line 200-2 is under “compression.” That is, line 200-2 benefits from a kind of pump — or “compressor.” This compressor forces the gas through the line. Line 200-1 also benefits from the compressor, but the department accepted Tennessee’s statement that the additional horsepower allocated to that line does not serve to increase its capacity because of pressure reductions “upstream.” See D.P.U. Order 85-207-A, at 3-7 (1986).
The coalition also proposed a fourth alternative site, the “Concord site,” which proved to be more expensive than the Lawsbrook Road site.
Substantial evidence is that evidence which “a reasonable mind might accept as adequate to support a conclusion.” G. L. c. 30A, § 1 (6) (1986 ed.). See
Deacon Transp., Inc.
v.
Department of Pub. Utils.,
The coalition also claims as reversible error the fact that Tennessee failed to produce the INGS document in response to the coalition’s interrogatories. We need not concern ourselves with whether production of the
Cf.
Fitchburg Gas & Elec. Light Co.
v.
Department of Pub. Utils.,