6 S.E.2d 889 | N.C. | 1940
This is an action for actionable negligence, alleging damages, for alleged wrongful death. It was originally brought in the municipal court of the city of High Point, but a consent order was entered transferring it to the Superior Court of Guilford County. The defendant, Robert Company, Inc., entered a special appearance and moved that the action be dismissed as to it for want of proper service of process. This motion was sustained and an order entered to that effect. Service was duly had upon the other defendants, who filed answers. When the case came on for trial before his Honor, Luther Hamilton, judge presiding, each defendant demurred ore tenus to the complaint and moved for judgment on the pleadings. The demurrers and motions were sustained, and judgment entered dismissing the action. To the ruling sustaining the demurrers and motions, and to the signing of the judgment dismissing the action, the plaintiff appealed to the Supreme Court.
The complaint alleges, in part: "That the said plans and specifications were approved and accepted by the defendant Marshall Field and Company, which in January, 1937, employed the defendant Southeastern Construction Company to erect and construct said wing or addition; that the latter company employed J. L. Coe to do the structural steel work on said addition, and the plaintiff's intestate at the time of his death was employed by said J. L. Coe and was engaged in putting steel columns in said addition to said mill. That the addition or wing to said mill was to be constructed of brick, supported by considerable structural steel; that on March 11, 1937, said construction had progressed to a point where most of the steel in the floor of the second story had been placed, and the north brick wall was about 8 or 8 1/2 feet high; that in order to place the steel beams or columns in position it was necessary *57 to use a form of derrick, consisting of a wooden pole about 35 feet long and about 16 inches in diameter, called a gin pole, which was held in position by guy ropes and braces; that near the top of this pole were two pulley blocks and near the bottom of said pole was what is called a winch, on which is wound the steel cable used in hoisting the steel columns; that on March 11, 1937, said gin pole was located just inside the north brick wall of said addition, near the northeast corner of same; that it was located near a window in the north wall, in which window it was necessary to place one of these steel columns; that about 12 or 15 feet from said window in the northwesterly direction from it was located the pole from which the power lines ran to the old transformer; that said power lines ran from said electric light pole to said old transformer diagonally across said brick wall at a point a few feet above said window; that about 9:30 or 10:00 o'clock a.m., on said day plaintiff's intestate and fellow employees were hoisting a steel column into position in the aforesaid window; that said column was picked up from the ground just inside the north wall of said addition; that plaintiff's intestate and two other employees were at said time engaged in turning the handle on said winch, which caused said steel column to be lifted from the ground and into place with the assistance of other employees, who guided it in its movement; that said steel column was about 30 feet long and weighed about 650 pounds; that when it had been partially raised so that it was clear of the ground it came in contact with one of said power lines, which was charged with about 13,200 volts of electricity, causing said electric current to run down the column and the cable supporting said column and into plaintiff's intestate, knocking him a distance of 6 or 7 feet, and instantly killing him. That there was no sign on said power lines of any kind to warn persons on the premises that they were uninsulated, or charged with electricity, or dangerous; that plaintiff's intestate had not been warned of the danger of said wires; that the condition of said wires and the danger inherent therein were well known to all the defendants; that each and every one of said defendants had the right and authority, and was under the duty to warn persons rightfully on said premises of the condition and danger of said power lines, and to use reasonable precautions to protect such persons from harm therefrom; that plaintiff's intestate was a poor, illiterate and ignorant Negro, and was ignorant of the fact that said wires were uninsulated and exposed and charged with a high voltage and very dangerous. That plaintiff's intestate's death was directly and proximately caused by the negligence and carelessness of the defendants, and each of them, in the following particulars:
"(a) In that said power lines were placed upon and allowed to remain upon said premises in an exposed condition and uninsulated and in this *58 condition were charged with a high voltage of electricity, when the defendants knew, or by the exercise of reasonable diligence should have known, that they were inherently dangerous, and would probably result in serious injury or death to persons working near them, and more particularly plaintiff's intestate. (b) In that said power lines were so located upon said premises as to be exceedingly dangerous, when charged with electricity, to persons working near them, and more particularly the plaintiff's intestate. (c) In that defendants placed no sign of any kind on said power lines or the poles supporting them to warn persons against danger therefrom, and in that defendants failed and neglected to warn in any manner plaintiff's intestate that said power lines were open and exposed and dangerous. (d) In that the current passing through said power lines was not cut off while persons were working so near them, and particularly while plaintiff's intestate and others were hoisting steel columns so near to said wires, and in that no attempt was made by any of the defendants to cut off or have cut off said current. (e) In that said wires or power lines were not constructed at a height and in such a manner as to not interfere with the construction of said addition to said mill and the persons working thereon. (f) In that the said power lines were not covered with nonconductible material. (g) In that the defendants did not complete construction of the new transformer stand and change the wires from the old transformer stand to the new one, where they would be out of danger, prior to the commencement of construction of said addition. All of which acts of negligence on the part of the defendants were the sole, proximate and efficient cause of the death of plaintiff's intestate."
Plaintiff excepted and assigned error: "That his Honor sustained the demurrer ore tenus to the complaint and motion for judgment on the pleadings of each defendant," and "That his Honor rendered and signed the judgment set out in the record," and appealed to the Supreme Court. Did the court below commit error in sustaining the demurrer ore tenus to the complaint and motions for judgment on the pleadings made by each of the defendants? We think so under the facts and circumstances of this case.
In Leonard v. Maxwell,
It is well settled that only objections apparent on the face of the complaint can be considered on demurrer.
N.C. Code, 1935 (Michie), sec. 160, in part, is as follows: "When the death of a person is caused by a wrongful act, neglect or default of another, such as would, if the injured party had lived, have entitled him to an action for damages therefor, the person or corporation that would have been so liable, and his or their executors, administrators, collectors, or successors, shall be liable to an action for damages, to be brought within one year after such death, by the executor, administrator or collector of the decedent; and this notwithstanding the death, and although the wrongful act, neglect or default, causing the death, amounts in law to a felony. The amount recovered in such action is not liable to be applied as assets, in the payment of debts or legacies, except as to burial expenses of the deceased, but shall be disposed of as provided in this chapter for the distribution of personal property in case of intestacy."Curlee v. Power Co.,
N.C. Code, supra, sec. 8081 (r), in part, is as follows: "The rights and remedies herein granted to an employee where he and his employer have accepted the provisions of this act, respectively, to pay and accept compensation on account of personal injury or death by accident, shall exclude all other rights and remedies of such employee, his personal representative, parents, dependents or next of kin, as against his employer at common law, or otherwise, on account of such injury, loss of service, or death: Provided, however, further, that in any case where such employee, his personal representative, or other person may have a right to recover damages for such injury, loss of service, or death from any person other than the employer, compensation shall be paid in accordance with the provisions of this chapter: Provided, further, that after the Industrial Commission shall have issued an award, the employer may commence an action in his own name and/or in the name of the injured employee or his personal representative for damages on account of such injury or death, and any amount recovered by the employer shall be applied as follows: First to the payment of actual court costs, then to the payment of attorneys' fees when approved by the Industrial Commission; the remainder or so much thereof as is necessary shall be paid to the employer to reimburse him for any amount paid and/or to be paid by him under the award of the Industrial Commission; if there then remain any excess, the amount thereof shall be paid to the injured *60 employee or other person entitled thereto. If, however, the employer does not commence such action within six months from the date of such injury or death, the employee, or his personal representative shall thereafter have the right to bring the action in his own name, and the employer, and any amount recovered shall be paid in the same manner as if the employer had brought the action. The amount of compensation paid by the employer, or the amount of compensation to which the injured employee or his dependents are entitled, shall not be admissible as evidence in any action againt [against] a third party. When any employer is insured against liability for compensation with any insurance carrier, and such insurance carrier shall have paid any compensation for which the employer is liable or shall have assumed the liability of the employer therefor, it shall be subrogated to all rights and duties of the employer, and may enforce any such rights in the name of the injured employee or his personal representative; but nothing herein shall be construed as conferring upon the insurance carrier any other or further rights than those existing in the employer at the time of the injury to or death of the employee, anything in the policy of insurance to the contrary notwithstanding."
Section 8081 (i) — (b) "The term `employee' means every person engaged in an employment under any appointment or contract of hire or apprenticeship, express or implied, oral or written," etc.
In McCarley v. Council,
In Thompson v. R. R.,
This is an action against third parties for negligence. Under the N.C. Workmen's Compensation Act, negligence is eliminated and an employee may recover from his employer. N.C. Code, supra, sec. 8081 (i), subsec. (f): "`Injury and personal injury' shall mean only injury by accident arising cut of and in the course of the employment," etc.
If the insurance carrier of the employer has paid the award to the employee, he is subrogated, as set forth in sec. 8081 (r), supra. This action is brought by the administrator of the deceased employee charging negligent killing against the defendants, third parties. The plaintiff charges in his complaint the defendants (one not served) with a violation of duty by third persons in not using due care. The complaint charges *62 that the power lines were on the premises in an "exposed condition and uninsulated," and in this condition charged with "high voltage of electricity" (13,500 volts). "The said wires or power lines were not constructed at a height and in such manner as not to interfere with the construction of said addition to said mill and persons working thereon."
In Mitchell v. Electric Co.,
In Kiser v. Power Co.,
The defendant contends that upon the face of the complaint the Superior Court was without jurisdiction to hear and determine the matter for that, under the law, the N.C. Industrial Commission had the original and exclusive jurisdiction thereof. For the reasons given, we cannot so hold. The complaint sets forth actionable negligence against the defendants, who were third parties. The demurrer ore tenus as to each defendant is overruled. The judgment of the court below is
Reversed. *63