After this Court’s review of the record, our appraisal of the facts found in the complaint and exhibits differs somewhat from the facts stated in the opinion of the Court of Appeals. This action arises out of a contract for the purchase and sale of a new townhouse unit which plaintiffs entered into with Overlook Development (not a party to this appeal) on 22 February 1985. Plaintiffs allege that the relevant building permits were issued by J.R. Smith, a City of Asheville building inspector, to Overlook Development in December 1984 but that plaintiffs did not obtain title to the unit until 23 August 1985. Plaintiffs further allege that on 23 August 1985, an employee of the Building Inspections Department of the City of Asheville telephoned a representative of Carolina Power & Light Company, informed the company that a final inspection of plaintiffs’ unit had been done, and authorized the power company to hook up the electricity to the building.
Plaintiffs immediately assumed occupancy upon completion of the unit’s construction in August 1985. No certificate of compliance, as required by
After plaintiffs moved into their „new home in August, they discovered numerous defects in the construction and workmanship of their unit in violation of the Building Code, as well as problems with grading, drainage, and driveway pavement failure. These defects were the subject of a later condemnation proceeding brought by the City of Asheville (“City”) against plaintiffs on 5 December 1988 and 18 January 1989, resulting in a determination that plaintiffs’ unit was unfit for human habitation and an order to demolish the unit at the plaintiffs’ expense.
On 6 March 1989, plaintiffs filed their verified complaint, alleging eleven causes of action, seeking relief against numerous defendants (forty-six) on a variety of theories of recovery. Relevant to this appeal, plaintiffs allege that the City, through its agents, had a duty to inspect the unit and that defendants’ failure to inspect and/or order correction of the alleged Building Code violations was a proximate cause of plaintiffs’ damages. Plaintiffs sought compensatory and punitive damages against defendants City of Asheville and City Building Inspector J.R. Smith, in both his official and individual capacities, for his alleged acts and omissions pertaining to the inspection of the townhouse unit.
Prior to answering, these defendants filed a motion to dismiss plaintiffs’ claim pursuant to
The Court of Appeals reversed the trial court’s dismissal of plaintiffs’ claim for compensatory damages against the City “predicated on allegations of inspector Smith’s willful and wanton conduct” and affirmed the order in all other respects. Lynn v. Overlook Development, 98 N.C. App. 75, 80, 389 S.E.2d 609, 613 (1990). On 26 July 1990, this Court granted plaintiffs’ petition for discretionary review.
A
In this connection, we have examined the applicable statutes, the Building Code, and the trial court record. Plaintiffs allege that City Building Inspector Smith was negligent under the standards set forth at
The pertinent sections of the Building Code provide as follows:
105.4 — Application for Permit
(f) Where the General Statutes require a licensed contractor for certain types of construction, no permit shall be issued for such construction except in compliance with these statutes.
105.6 — Inspections Required.
(a) As the work covered by permit progresses, local inspectors shall make as many inspections thereof as necessary to satisfy them that the work is being done in accordance with this Code, any other applicable State and local laws, and the terms of the permit.
(b) When required, the Inspection Department shall make at least the following inspections of all work being performed under the permit and shall either approve that portion of the construction as completed or shall notify the permit holder or his agent wherein the same fails to comply with the law. The permit holder or his agent shall give timely notice to the Inspection Department when the work for these inspections are [sic] ready:
Final Inspection: To be made after the building or structure is completed and ready for occupancy.
(c) Work shall not proceed on any part of a building or structure beyond the point indicated for each inspection described in subsection (b) above until written approval has been received from the [Inspection [Department.
105.10 — Certificates of Compliance
(a) At the conclusion of all work done under a permit, the appropriate inspector or inspectors shall make a final inspection, and if they find the completed work complies with this Code and all other applicable State and local laws and with the terms of the permits, the Inspection Department shall issue a certificate of compliance.
(b) No new building or structure or part thereof may be occupied . . . until the Inspection Department has issued a certificate of compliance.
(d) Occupying a building or structure in violation of this section shall constitute a misdemeanor.
North Carolina State Building Code (1978).
The statutes and the sections of the Building Code in question are silent as to the legislative purpose and as to the class of persons for whose benefit they were enacted. In such a case, the application of the subject statutes and sections of the Building Code to the plaintiffs, invoking their protection, must be determined from a careful consideration of the provisions of the statutes and the Building Code and of the ends they were manifestly intended to accomplish. In the interpretation and construction of statutes, it is a primary rule that the intention of the legislature should be ascertained and given effect. McLean v. McLean, 323 N.C. 543, 374 S.E.2d 376 (1988). The enabling statute which calls for the institution of a State Building Code Council and the North Carolina Residential Building Code specifically addresses protection of the interests of the public, and provides, in part:
All regulations contained in the North Carolina State Building Code shall have a reasonable and substantial connection with the public health, safety, morals, or general welfare, and their provisions shall be construed liberally to those ends.
It is unclear, however, whether these particular plaintiffs as
purchasers
are within the class intended to be protected by the statutes and whether the harm resulting from Smith’s alleged acts or omissions is the specific type of harm which the statutes were intended to prevent. Assuming, without deciding the issue, that a city
The plaintiffs contend that defendants were negligent
per se
because they violated the provisions of
Plaintiffs allege violations of
As to the plaintiffs’ allegation that the city building inspector failed to observe violations of the Building Code pursuant to
As we have noted, plaintiffs elected to take title and assume occupancy of the townhouse in violation of the law before the building inspector had opportunity to make final inspection and issue a certificate of compliance. This act was an intervening, independent cause of plaintiffs’ damages. Therefore, the acts or omissions by the city building inspector did not proximately cause the plaintiffs’ damages.
We hold that the alleged violations of
Affirmed in part, reversed in part.