The Security Bridge Company entered into a contract with the town of Ryegate, Mont., the appellee, for the construction of a waterworks system in said town, and agreed to accept, and did accept, in part payment therefor, bonds of special improvement district No. 4 of the town of Ryegate, Mont., of the par value of $45,602.42. These bonds were purchased by the appellant. The bonds not having been paid when due, appellant brought tiiis actiou alleging such nonpayment and refusal on the part of the appellant to pay the same, and prayed judgment for the par value of the bonds with interest at 6 per cent, as therein provided. The appellee states that the action is one for money had and received, and there are allegations-in the complaint tending to substantiate this view. The trial court defined the action as one in assumpsit “on au implied contract for the balance due on the construction of a water supply system.” There are allegations in the complaint which tend to substantiate this view. The appellant, on the other hand, claims that it is entitled to judgment upon any one of several theories. It also contends that on this appeal the action should be dealt with as one in equity, and that upon the faets the judgment in favor of the city should be reversed and a judgment ordered for the whole or part of the amount for which suit was brought in accordance with such theory of the law and the facts as may ho adopted by this court. Montana has adopted the system of code pleading abolishing common-law forms of action, Rev. Codes Mont. 1921, § 9126; Daniels, v. Andes Ins., Co.,
The ease was tried by the court without a jury in accordance with .written stipulation. The issues were’, framed by the com-, plaint, answer, arid replyt Many of the al-; legations in the pleadings were admitted.' The parties entered into and filed at the trial a stipulation of the facts but expressly re-served the right to introduce evidence onfall issues not covered by the stipulation and did in fact offer evidence set forth in the bill of exceptions comprising about 100 pages of the transcript. As the power of this court on appeal to review the faets depends upon whether or not the appeal is from, a judgment at law or a decree in equity, we cannot at this juncture state the facts as admitted and agreed and as disclosed , by the evidence without confusing the questions properly before us for determination upon the reeord.
The complaint alleges that December 30, 1919, the town counsel of the appellee passed a resolution of intention to create special improvement district No. 4; that notice thereof was published; that on February 11, 1920, a resolution was passed creating the district and ordering work described in the resolution of intention to be done; that the purpose of these resolutions was to install in the town a complete system of waterworks; that the Security Bridge Company bid for the construction of the waterworks system and entered into a written contract to perform said work; that it was intended and contemplated by the appellee that it should issue negotiable evidence of the debt in the form of special improvement district bonds to pay for the construction of said waterworks system; that thereafter bonds in the form provided by law (Rev. Codes Mont. 1921, § 5249) were issued and acquired by the plaintiff; and that defendant paid the interest maturing January 1, 1922, but refused .to pay any further interest and declared its intention of never paying the principal sum and repudiated said' debt. These allegations, it will be observed, are consistent with the theory now advanced by the appellant that the action is a suit upon the bond for the reason that in a federal court the appropriate method of enforcing the obligation of the bond in the absence of power to entertain an original proceeding in mandamus to compel the officers to perform their duty to levy taxes is a suit against the municipality for a judgment to be thereafter followed by appropriate process to compel the assessment and levy of taxes upon the property within the municipality liable for the tax. County of Cass v. Johnston,
Assuming for the moment, without deciding, that the appellant stands in the shoes of the contractor, its allegations in support of the claim for money had and received must be predicated upon the theory that the bonds are invalid and that therefore the money paid by the appellant to the town through the contractor was without consideration. The allegations, whereby appellant seeks to stand in the shoes of the contractor and to recover from the town for work and labor done by the contractor under his contract, must also be predicated upon the theory that the bonds paid to the contractor and
The first obstacle raised to a consideration of the facts by this court is based upon the proposition that although most of the facts were stipulated by the parties there was no motion by appellant for a judgment and no request for a ruling upon a principle of law, and consequently that the facts cannot be reviewed on this appeal. This position is well taken, were it not for the fact that an agreed set of facts somewhat changes the power and duty of the appellate court. That power and duty has been lately reviewed and stated in an opinion by District Judge Pollock speaking for the Circuit Court of Appeals of the Tenth Circuit, Kansas City Life Ins. Co. v. Shirk,
The importance of these observations in the ease at bar lies in the fact that the allegation in the complaint tending to establish privity between appellant and the appellee were all denied and that the stipulated facts did not cover these allegations and that evidence was adduced with relation thereto. In so far as these allegations are material to the plaintiff’s right of recovery upon any theory, he must fail upon this apiJeal. It must therefore be assumed that there was no privity between the appellee and the appellant. Consequently, appellant cannot recover from the appellee upon the theory of money had and received. (Aetna Life Ins. Co. v. Town of Middleport,
The conclusion we have arrived at with reference to the rights of the parties upon the theory of money had and received and implied contract for the performance of work and the furnishing of materials is also necessitated by an entirely different view of the - situation as disclosed by the stipulated facts. It is stipulated that at the time the work and labor were performed and materials furnished (and the money was furnished by the appellant to the contractor) the indebtedness of the city equalled the limit fixed by the Constitution of the state (3 per cent.). That constitutional provision is as follows: “No city, town, township or school district shall be allowed to become indebted in any manner or for any purpose to an amount, including existing indebtedness, in the aggregate exceeding three (3.) per centum of the value of the taxable property therein, to be ascertained by the last assessment for state and county taxes previous to the incurring of such indebtedness, and all bonds or obligations in excess of such, amount given by or on behalf of such city, town, township or school district shall be void; provided, however, that the legislative assembly may extend the limit mentioned in this section, by authorizing municipal corporations to submit the question to a vote of the taxpayers affected thereby, when such increase is necessary to construct a sewerage .system or to procure a supply of water for such municipality which shall own and control said water supply and.devote the revenues derived therefrom to the payment of the debt.” Const, art. 13, § 6.
i Thus,, the town was .without authority to fcreate a direct- obligation to pay for the work and materials or for the money furnished therefor and was equally without authority to establish such obligation by implication. . The law will not imply a contract to pay where an express agreement to do ’ so would be illegal and void. This subjefet is much discussed in the briefs, but we content ourselves with a citation of the decision' of the Supreme Court in Litchfield v. Ballou, 114 U, S. 190, 192,
The appellee contends that as the case was tried in the court below on the theory that the bonds are invalid no other theory can be considered by this court. In order to support this contention appellee applied to the court for an order directing that the briefs in the trial court be made a part of the record. This application was denied. Assuming that it was appropriate to consider such briefs in order to determine whether or not there is a change of theory in the appellate court, it is necessary that they be incorporated in the bill of exceptions and in no other way could they properly be considered by us. We do not wish to be understood, however, as suggesting this as a proper practice. The theory upon which the case is tried must be derived from the method in whieh the trial is conducted, the evidence offered, objections made and the rulings of the court invoked and not from the argument offered at the conclusion of the trial. It does appear from the opinion of the trial judge which is incorporated in the transcript entitled “Decision” that, in answer to the proposition advanced by the defendant that the general question presented in the case was -whether or -not the town was liable for the debt represented by the bonds of a special' improvement district, which are by their terms payable from special funds derived from special assessment upon propérty within the district, the court, in commenting on the foregoing statement of the issue of law involved, said: “ * * * Plaintiff contends that the town never acquired jurisdiction to create a -special improvement district, and that the bonds issued were by the court' declared to' be invalid after the contract, for which the bonds were delivered, had been fully performed.” Appellant states in its brief that this contention ivas made in answer to a special proposition advanced by the appellee. . With some hesitation, after considering the entire record, we conclude that the appellant is entitled to a consideration upon the record of its rights in the event that the bonds in question are legal. We reach this conclusion in part because of the evident reluctance of either party to take a decided stand on the appeal as to the validity or invalidity of the bonds in question. The appellant insists that the bonds are legal obligations en
These bonds are not obligations of the town. On their face they are payable from funds derived from a collection of a special tax and assessment which is a lien against the real estate within the improvement district, and are payable by the treasurer of the town of Ryegate to the bearer from such fund. It has been held by the Supreme Court of Montana in Stanley v. Jeffries, and Stanley v. City of Great Falls,
In view of our conclusion with reference to our power in this case to consider the facts, it will be necessary to state more in; detail facts as disclosed by the pleadings and stipulation with a view of determining the question as to the validity of the bonds,' although by way of preface it may be stated that these particular bonds have been declared invalid and the assessment and levy of taxes to pay said bond has been invalidated and the city authorities enjoined from proceeding further thereon in an action brought'by individual property holders living in the district against the town of Ryegate and W.' O. Wood, county treasurer of Golden Yalley county, Mont., to whom taxes levied in the special improvement district were paid or to be paid. Appellant claims it is not bound by this decision, that it is erroneous, and that the federal courts must determine the rights of the bondholder by the law of Montana as established by its statutes and court decisions at the time the contract was entered into which resulted in the issuance of the bond and should not follow subsequent decisions of the state Supreme Court as to the interpretation of the statutes of, the state, if it deems such subsequent decisions to be an erroneous interpretation of the law, although as to rights arising thereafter it would accept the decision of the state court as binding and conclusive as to the meaning of the state statutes, even if the federal court believed the ruling of the state court to be erroneous. See Road Imp. Dist. No. 7, of Poinsett County, Ark., v. Guardian Sav. & Trust Co. (C. C. A. 8)
The town council of the appellee being desirous of acquiring its system of waterworks including a well, pump, reservoir, pump house, pipe lines, and hydrants, mindful of the fact that the assessed valuation of the property within the city was such that the limits of a bonded indebtedness permissible under the Constitution of Montana without the vote of the people authorizing the increase of a constitutional limit, or of bonds issued therefor, Would not pay the entire cost thereof, determined that the amount of $15,000, which was within the constitutional limitation, should be raised by issuing and selling the bonds of the town. In order to pay the balance of the expense of such waterworks the council decided to establish a special improvement district (No. 4) within the boundaries of the town covering a large part, but not all, of the habitations and buildings therein. The well, pump and pump house, and reservoir were to be located outside of this district. Within the district water mains and hydrants were to be installed. It was estimated and stated in the contract for the work that the $15,999 would take care of the cost of all the property located outside the proposed special improvement district and that the funds derived from the sale of the bonds of said district would pay the cost of the improvements within the district. With this end in view the city issued $15-,000* of general bonds of the town which were purchased by the Security Bridge Company, the contractor, on April 14, 1929, and received by the appellant on May 29, 1929. On December 39,1919, the town council passed its resolution of intention to establish special improvement district No. 4 for the purpose of raising all additional funds over and above $15,999 to pay for said water system, and improvements. Due notice was given of the passage of this resolution, and on February 17, 1929, a resolution was passed by the town council establishing the district. The improvements as de-. scribed in these two resolutions are as follows : “Section 6. That the character of the improvements to be made in said Special Improvement District is hereby declared to be as follows: The . construction of pipes,hydrants and hose connections for irrigating appliances and fire protection; all of which improvements are to be made in accordance with the plans and specifications, to be prepared by the .engineer of the town of Bye-gate and to be adopted by the council of said town, and which plans and specifications will then be on file in the office of the town clerk, and to which reference is hereby made and by such reference are made a part hereof to all intents and purposes the same as though said plans and specifications were fully set forth and incorporated at length in this resolution.” The resolution also provided that the district to be created was “for the purpose of making special improvements upon and along that portion of Bail-way Avenue, Second Avenue and the alley between Third and Fourth Avenues, and the alley between Fourth Avenue and the avenue next north of Fourth Avenue, from Hark-ins Street on the west and the street next east of Second Street on the east, including all avenues, streets and alley intersections.”
It is contended that this description is insufficient to justify or describe the installation of a system of waterworks. Section 5226 of the Bevised Codes of Montana in force at the time these proceedings were instituted, authorized the creation of special improvement districts for the purpose, among others, of constructing “waterworks, water-mains, and extensions of water-mains; pipes, hydrants, hose connections for irrigating purposes; appliances for fire protection, tunnels, viaducts, conduits, subways, break-waters, levees, retaining walls, bulkheads, and walls of rock or other material to' protect the same from overflow or injury by water; the opening of streets, avenues, and alleys; the planting of trees thereon; and to maintain, preserve and care for any and all of the improvements herein mentioned; and the construction or reconstruction in, over, or through property or rights of way owned by such city, of tunnels, sewers, ditches, drains, conduits, and channels for sanitary and drainage purposes, or either or both thereof, with necessary outlets, cesspools, manholes, eatchbasins, flush tanks, septic tanks, connection sewers, ditches, drains, conduits, channels, and other appurtenances; pipes, hose connections for irrigating, hydrants and appliances for fire protection; and break-waters, levees, retaining walls and bulkheads; walls of rock or other material to protect the streets, avenues, lanes, alleys, courts, places, public ways, and other property in any such city from overflow by water ; and to order any work to be done which shall be deemed necessary to improve the whole or any portion of such streets, avenues, sidewalks, alleys, or places or public ways, or property, or right of way of such city. The city council is also hereby author
“It is further provided that the council shall have the same jurisdiction and powers as in this section above provided, to (before ■doing any of the work mentioned in this act) require any public service corporation, or company, firm, or person occupying such streets, avenues, or alleys, at their own expense and within a reasonable time to be fixed by the council, place in an underground conduit in such manner as may be directed by the city council, all wires, electric conduits, telephone, telegraph, power, or power transmission lines, or appurtenances thereto, or appliances owned, held, or enjoyed in connection therewith; provided, however, that the whole cost so assessed shall at no time exceed the sum of one dollar and fifty cents per lineal foot, plus the cost of the pipe so laid of the entire length of the water-mains laid in such district.”
The description contained in both resolutions uses the exact language of the statute “pipes, hydrants, hose connections for irrigation purposes.” It also includes incidental “appliances for fire protection.” These, it will bo observed, were to bo installed upon and along certain designated streets, so that without reference to the plans or specifications subsequently filed, the length of the pipe' (although not the diameter) was fairly disclosed by the resolutions in question. The Supreme Court of Montana has consistently upheld proceedings based upon a very general description of the work to be done in the resolution of intention, and also in the ordinance establishing the district after due notice, supplemented as such description is by the more particular description shown by the plans and specifications on file. In Mansur v. City of Polson,
Thereafter, plans and specifications were filed with the clerk, bids for the construction of the waterworks system were made by the Security Bridge Company, the contract was awarded to that company, and a. written contract was entered into on April 26, 192.0, between the Security Bridge Company as contractor and the town of Ryegate for the construction of the aforesaid improvements. This, contract, however, covered the entire system of waterworks both outside and- within the special improvement district. It provided for the payment by the town to the contractor for the work done at unit prices, for instance, the price per foot for 4" cast-iron water pipe, including necessary excavation back fill, valves and “specials, according' to .plans and specifications,” $2.55; for fi" pipé $3..60; 'for 8" pipe $5.044; for hydrants', including auxiliary valves, necessary excavation back fill, $174.70; excavation reservoir $3.17 per cubic yard; concrete $37.50 per cubic yard; roof, etc., for reservoir $1,425; excavation of well $2.75 per cubic yard; concrete for pump foundation, etc., $40 per cubic' yard; pumps-for well, $2,525; pump house $1,625; rock excavation in drained pump.pit $3 per cubic yard. It was provided in the specifications for the contract; but not in the contract proper, that the town has available from the proceeds of general obligation bonds $15,000 cash to apply on the construction of the waterworks system; that this amount, after deducting preliminary expenses, was to be paid to the contractor in cash for the reservoir, pump-house,' pumping plant, and such of the main water line as it will cover, the balance of the water system to be paid by special improvement district bonds, drawn against special improvement district No. 4. (We omit all reference to sewer system although the contract introduced in evidence would seem to indicate that another district, No. 3, was established for the purpose of constructing sewer system to be constructed by the same contractor as counsel assert that no such sewer system was constructed.) The estimated cost of the improvements within the improvement district was stated in the resolution of intention as required by statute (section 5227) as $28,350'. The bonds actually issued therefor was the amount here-inbefore stated, to wit, $45,602.42. The bridge company sold the bonds, both general and improvement district, for 85 per cent, of the par value to the appellant which paid for the improvement district bonds the sum of $38,762.06. Although the construction contract disclosed that the bonds were to be taken at par as a consideration in the construction contract, they were in accordance with the prior agreement between appellant and the Security Bridge Company sold to the appellant by the bridge company at 85 per cent, of the par value thereof. It was stipulated that all the money used by the Security Bridge Company to build and complete the waterworks system and improvements specified in said resolution was derived from the sale of these bonds by it to the appellant and that such money was received as the bonds were delivered by the town to the contractor during the progress of the work in payment for such portions of the work as were completed. It was stipulated that fhe water system and improvements specified in the resolution of intention were constructed and accepted and that the town has since been and is still receiving the income derived from said system and that the said water system find improvements are now in use. It was stipulated, however, that the gross income derived therefrom for the years 1921 to 1927, inclusive, is $5,545.53 and that the expenditures exceeded that amount by about $1,506; that the interest on the general bonds has been paid from a tax levy upon all the property within the limits of the town, although the special tax levy of 7% mills therefor has not been quite sufficient to pay the full amount of the interest.
It will be observed that the construction contract does not .specifically provide , that the amount of special district improvement bonds received by the contractor should bq limited to the contract cost of the pipes arid hydrants, etc., within the limits of the district, nor did it expressly, provide that the $15,000 to be paid to the contractor from the general bond issue should: be received by, it in full payment of, all the work done outside the special ^ improvement district. As we understood counsel for appellee upon the argument, he was disposed to concede that the invalidity of the proceedings leading up to the issuance of the special improvement bonds resulted solely and only from the fact that the contract ¿rid proceedings thereafter were so conducted' that it was possible to charge upon the property holders within the district a portion of the expense of the work
It also appears from the findings and decree of the District Court that the plans and specifications for the improvement, although delivered to the town clerk ten days or two weeks before April 13, 1920, the day before bids were called for, were not presented to the town council or approved thereby until April 13, 1920. It was also stated in the findings in that ease that “no notice of any kind was ever given to property holders as Improvement District No. 4, or to anyone else, of the letting of the contract for the construction of the improvements.” There is no evidence or allegation in this case on either subject. Appellant claims that no such notice is necessary and we have been unable to find any requirement of the Montana law in that regard and none has been pointed out by the appellee. It was also found as a fact “that there was no sprinkling or parking or boulevard districts in the town of Ryegate, and never have been”; that certain of the property owners, plaintiffs in that case, filed objections within 60 days after letting the contract, hut that others had not done so,; that the Chicago, Milwaukee & St. Paul Railway, a property owner within the district, had withdrawn its protest against the improvements upon being paid $3,500 by “interested citizens of the town of Ryegate”; that with said petition the protests were sufficient to prevent the improvement and without it were insufficient; that the total cost of pipe used was $17,726.-47 and that the length thereof was 11,838 feet; hence, that the total cost for laying the pipe exceeded $1.50 per foot of pipe plus the cost of the pipe which would amount to $35,473; that the total cost of $45,602.40 exceeded the estimated cost of $28,350; that the improvement installed was a complete system of waterworks and hence was not sufficiently described by the resolution of intention for the construction of pipes, hydrants, and hose connections for irrigation and fire protection. As conclusions of law the District Court of the. Fifteenth Judicial District of Montana held that the town never acquired jurisdiction to create the improvement district, that the installation of the system was without authority, that all the proceedings with reference thereto were null and void, that the cost of the system was in excess of that allowed by law, to wit, $1.50 per lineal foot of pipe laid plus the cost of the pipe, that the assessment was for that reason illegal, that the price was increased because of the sale of the bonds at less than par. In the case at bar there is no evidence which wo can consider of some of the facts before the District Court for the district of Montana. Its findings are not evidence.
However, we do not find that the decision in Evans v. Helena, supra, is a departure from the prior decisions of the Montana Supreme Court, and that court apparently did not consider that it was changing any established rule of law nor did it purport to overrule any of its previous decisions. The case of Evans v. City of Helena was decided upon suit brought by the property holders within the district to prevent the letting of the contract and the construction of the improvements, and the language used by the court in its decision must be interpreted in the light of that fact. The Supreme Court of Montana has uniformly held that a property holder in an assessment district who stands by and allows improvements to be made in the district which enhance the value of his property is estopped from attacking the validity of the assessment therefor, if the city had acquired jurisdiction in appropriate fashion to establish the district and make improvements described in the resolution of intention so to do. In Power v. City of Helena (1911)
In Harvey v. Town of Townsend (March, 1920)
Furthermore, it is provided by statute in Montana, with relation to assessments for improvements made under the law authorizing the establishment of improvement dis
It has been held by the Supreme Court of Montana that although this statute does not authorize an assessment where the city authorities have not acquired jurisdiction to establish the district and to order the work done therein, Shapard v. Missoula, supra, when the jurisdictional facts exist and the work has been done without apparent protest there seems to be no impediment in the statute or decision of the Supreme Court of Montana against such reassessment. Where jurisdiction has been acquired by the city authorities to form the improvement district and go forward with the work, the remedy for subsequent errors apparently is not governed with the strictness usually applied to proceedings in invitum, thus in Pool v. Townsend,
From these cases we conclude that the property within the district was properly assessable for that portion of the contract price for fire hydrants and pipes laid therein ; that is to say, we conclude that the town council had jurisdiction to order such work to be done. Moreover, the statute itself not only authorizes but expressly provides for a reassessment where for any reason the assessment made is invalid or claimed to be. Section 5253, Rev. Codes Mont. 2901, supra. The contract price of the work done within the district is readily ascertainable from the contract, plans, and specifications. The plan would indicate about 1,425 feet of pipe laid outside the district; of this not more than 841 feet could he 8" pipe, and the balance was probably 6", giving a contract cost of about $6,341.04 for the pipe outside the district, and $28,802.05 for the cost of the pipe within the district, to which should be added the contract price for fire hydrants of $2,267.20 and a proportion of the engineering costs pro rated thereto, being about $1,864.17 plus cost of printing bonds, $52,
There is, therefore, no inherent difficulty in making the appropriate deductions to confine the assessment to the improvements within the district, and to the maximum limit allowed by law therefor.
We now consider the question as to an agreement to sell the bonds below par. There is no allegation in the pleadings in relation thereto other than the allegation in the answer that the appellant purchased the bonds at 80 per cent, of their par value ($36,481.-94) and the allegation, as to the nature and allegations of the above-mentioned complaint filed by the property owners in the district court for the Fifteenth judicial district. The stipulation of agreed facts states that the appellant purchased the bonds of the Security Bridge Company for $38,762.06, being 85 per cent, of their par value, in accordance with a prior “agreement between them,” i. e., prior to the construction contract. Nothing more is disclosed by the agreed facts to bring the case at bar within the principles of the decision of the Supreme Court of Montana in Evans v. Helena, supra. The appellant offers to rebate the 15 per cent, discount it received when it purchased the bonds and claims a judgment for the amount it paid only. This deduction would seem to satisfy the principle announced by the Supreme Court of Montana in Evans v. Helena, supra, i. e., that the property owners in the district should not suffer a loss because the bonds are taken by the com-traetor upon a discount basis. To carry out the principle under the circumstances of this case it would also be necessary to limit the recovery to the improvements within the improvement district at the amended contract price, that is, at 85 per cent, of $31,069.45 (contract price of water mains and hydrants within the district), which equals $26,409'.-03, to which should be added engineering costs for the same and cost of printing bonds and other incidental or preliminary expenses. We do not expressly hold that this 15 per cent, deduction should be made for the reason that the record does not raise that question effectively on this appeal and for the further reason that in conformity with the settled, policy of the federal courts we prefer to follow, rather than to lead, in the interpretation of a state law where under the circumstances it is permissible. If the appellant makes good on its offer to waive the 15 per cent, discount advantage it now has, we have indicated the appropriate application thereof to the facts in the case.
As to the excessive contract price over the approximate statement thereof in the resolution of intention, -the contract contains the basis of the cost of the'improvement, and under the Montana decisions we hold that the property owners cannot now avail themselves of this discrepancy where they have stood by and allowed the improvements to be made without seeking injunctive relief in the courts. See Swords v. Simineo,
We might order a judgment upon the admitted facts (see Northern Pacific Ry. v. Van Dusen Harrington Co. (D. C.)
Judgment reversed.