147 Ky. 137 | Ky. Ct. App. | 1912
Opinion of the Court by
Reversing.
In 1909 the city of Pulton, a fourth class city, after duly adopting an ordinance, let to Charles W. Little, the appellee, the original construction, at the cost of the adjacent property holders, of certain of its streets. The streets were to be built of macadam. There were three separate contracts, known respectively as the West Pulton, East Pulton and Lake street contracts. In November of that year the city council met and upon report of the city engineer accepted the West Pulton work as completed under Little’s contract. Within the thirty days provided by Section 3574 of the statutes the appellant, Lovelace, and some seventy other, property holders whose property was subject to assessment for the payment of the street construction under the contracts, brought this proceeding in the Pulton Circuit Court against Little, the contractor, the city of Pulton, the individual members of the Board of Council of Pulton, the Clerk of the Board of Council, and the City Treasurer of Pulton. The petition set up that the contractor did not comply with his contract in the construe
It is established by a long line of causes written by this court that, in the absence of fraud or collusion, the -action of a Board of Council in accepting work of this nature will not be interferred with. Campbell vs. Southern Bithulithic Co., 106 S. W., 1189; Baldrick v. Gast, 79 S. W., 212; Barker v. Tennessee Paving Co., 71 S. W., 877; Eversole v. Walsh, 76 S. W., 358, and many other cases. These cases are conclusive in so far as the work under the West Fulton contract is concerned; and the passage of the ordinance accepting that work is conclusive upon the parties. It is true that the plaintiffs allege fraud in the acceptance of the work, but the proof does not go far enough to establish fraud; though the proof discloses that there were shortages in -the amount
As to tbe remainder of the work, tbe East Fnlton and Lake street portions, tbe record is in an anomalous condition. Its effort was to enjoin tbe individual members of tbe Board of Council, wbo were the rightful defendants, under tbe doctrine of Montgomery County v. Menefee County Court, 93 Ky., 33, from accepting tbe work in East Fulton and on Lake street. Tbe term of office of tbe Council then in office expired on January 1, 1910, and tbe record does not advise us as to tbe personnel of tbe present board; nor are the members of the present board, by any amendment, made parties defendant. Tbe trial court, therefore, was not at liberty to enjoin tbe members of tbe new board from accepting tbe work under tbe two last named contracts. Tbe city of Fulton, however, is made a party, and Little, tbe contractor, is made a party; and'it would doubtless be argued that an affirmance of this case would be res adjudicata upon tbe nature, character and completion of tbe work not yet accepted. Since we have jurisdiction in this case over Little, tbe contractor, it seems clear to us that we have the right to pass upon tbe record as to him, insofar as the unaccepted work is concerned.
Little, in his testimony, admits that be actually spread upon tbe streets, under tbe three contracts 892 cubic yards of macadam less than was called for by bis contracts; but tbe record does not disclose where this shortage occurred — whether in West Fulton, East Fulton or on Lake street. At tbe rate at which be was to receive pay for tbe entire amount of macadam this shortage would amount to, in round figures, $1,450. We bold that be is not entitled to pay for such portion of this sum as tbe sum of tbe macadam to be placed upon Lake street and in East Fulton bears to tbe sum of tbe macadam to be placed under all three contracts.
Tbe city engineer’s figures show that tbe total of excavation done by Little was 25,741 cubic yards. Upon tbe other band, Wilkes, a civil engineer wbo went over tbe work in April, 1910, testifies'that tbe total amount ■of excavation was 12,622 cubic yards. Tbe contract price for excavation was 33.74 cents per cubic yard. At this rate the' difference in tbe excavation reported by tbe city engineer and that reported by Wilkes would amount to $4,400 in round figures. Wilkes’ calculations and observations weré not made until after tbe work was done;
The City Council can, in accepting East Fulton and Lake street, consider, if it so desires, such other defects as it may believe existed in the construction of the streets, and such other failures, if any, as the Council may believe existed on the part of Little, the contractor, as to work on those two contracts. In other words, it is to be understood that in finding upon the subject of the amount of macadam and the amount of excavation for which Little should not be-paid, we do not mean to say that this is conclusive of any other matters involved in such controversy as may arise between Little and the present Board of Council. That body has the entire right to pass upon all other questions which may be proper within the range of the general powers delegated to the council in this respect.
As between the citizens whose property abuts upon the West Fulton streets on the one hand, and those whose property abuts upon the streets of East Fulton and Lake street upon the other hand, the results . achieved by this consideration work . a hardship upon the former; ' but this is because the Council had accepted their streets, and the courts, in the absence of fraud, are concluded by that
For the reasons indicated the judgment is reversed as to Little and the city of Fulton, and affirmed as to the other defendants, for proceedings consistent herewith.