280 N.W. 430 | Neb. | 1938
This is an appeal from the judgment of the district court denying the Loup River Public Power District the right to appeal or prosecute error from the action of the county board in the matter of the Looking Glass Drainage Ditch. This involves the construction of the statutes and their application to this particular case. Strictly stating the action of the trial court, it sustained the motions of the Union Pacific Railroad Company and the county of Platte to dismiss the appeal of the district and to strike the petition and dismiss its application for writ of certiorari.
The question presented here is the legal method of procedure from the county board to the district court by one dissatisfied with the assessment of benefits by said board in the establishment of a drainage district. The appellant in
The drainage ditch involved here was established and constructed under the provisions of chapter 31, Comp. St. 1929. The district at least partially relied upon section 31-115, Comp. St. 1929. The right to appeal from the assessment of benefits by the county board in the creation of a. drainage district is not given by section 31-115, Comp. St. 1929.
The nature of the appeal is questioned, and it is necessary to determine if this is an appeal from the assessment of benefits, or an appeal from the award of compensation of land appropriated, or allowing damages to property. The matter was before the county board of Platte county on the report of the engineers for the ditch. Neither the railroad nor the district had made any claim for damages. The summary of the engineer’s report as to benefits, in so far as applicable to this case, is as follows:
(a) District, canal right of way, 9,200 feet $5,912.00
(b) Railroad, right of way, 10,000 feet 4,941.00
(c) County, public roads, 15,300 feet 1,800.00
(d) Other property owners 4,147.00
Total estimated benefits $16,800.00
Excavation $ 6,370.00
Right of way (Including $49.50 to R. R.) 2,187.00
Damages 100.00
Highway bridge 1,800.00
Railroad bridge 3,491.00
Raising railroad track 1,450.00
Culvert and bridge approaches 200.00
Engineering, advertising, etc. 1,202.00
Total estimate cost $16,800.00
The engineer in his report added this note: “In order to make a just distribution of the costs of this project, the Union Pacific Railroad will maintain the railroad bridge over this ditch at their own expense; and all lands, etc., included in this apportionment, including the Union Pacific Railroad, will share proportionately in the costs of maintenance of all other parts of this project.”
It is obvious from the summary of the report which appears in the transcript as a part of the petition that this is merely an estimate of the cost, and an assessment of the benefits against the various property owners, including the railroad and the district. The acceptance of the report by the county board was not such as comes within the purview of section 31-115, Comp. St. 1929, providing that an appeal may be made from the board to the district court. In such a case, an appeal from the board is specifically provided by section 20-1901, Comp. St. 1929, which provides: “A judgment rendered, or final order made, by a county court, justice of the peace or any other tribunal, board or officer exercising judicial functions, and inferior in jurisdiction to the district court, may be reversed, vacated or modified by the district court.”
A part of the same chapter provides: “The proceedings to obtain such reversal, vacation or modification, shall be by petition entitled ‘petition in error,’ filed in a court having power to make such' reversal, vacation or modification.” Comp. St. 1929, sec. 20-1903.
A very similar case was presented to the court some years ago. When it was considered a second time, this court held in substance that, when a county board fixes assessments to pay for the construction of a drainage ditch, error will lie to the district court. Dodge County v. Acom, 72 Neb. 71, 100 N. W. 136. In that case language so applicable to the present case was used that it is repeated: “Again, on principle, a party to a suit would be entitled to prosecute error where no appeal is provided for. The act in question provides for an appeal from certain of the findings and orders of the board, but not from the order fixing the assessments. One cannot be denied his right of review in the appellate courts, and proceedings in error are always resorted to where no other method is pointed out or provided for.”
Of course, no appeal lies from the assessment, but the appellant insists that this was more than a mere assessment of the benefits. This court does not share this opinion. This
In such cases error to the district court would be the proper remedy under the statutes. An appeal was attempted in this case, and when the trial court indicated that the appeal was not the remedy, the district made an attempt to change the proceeding by filing an amended petition to one seeking a writ. Of course, one cannot be deprived of the right of appeal, but that appeal must be prosecuted as provided by the statutes. This court does not state that the appellant has an adequate remedy by proceeding in error. That question is not before the court. But the appellant has not the right after the time has elapsed for prosecuting error to change a former appeal proceeding so that it will be an error proceeding and benefit from the time within which the wrong remedy was pursued. The instant case does not fail because of a procedural misconception, but because the evidence does not sustain the contention of the appellant. This is not a claim for compensation for land appropriated or a claim for damages to property affected by the improvement. A proceeding in error is the proper remedy under our statutes, and it must be taken within the time provided by statute.
Affirmed.