Lopez Castro v. Fidelity and Deposit Company of MarylandLopez Castro v. Fidelity and Deposit Company of Maryland
MEMORANDUM OPINION
Plаintiffs, who worked as laborers for a sub-subcontractor in the construction of a District of Columbia building, allege that they were underpaid for their efforts. They have sued under the federal Davis-Bacon Act (DBA), 40 U.S.C. § 3141 et seq., in an effort to collect against the prime contractor’s construction bond, which was secured pursuant to the District of Columbia’s Little Miller Act (DCLMA), D.C.Code § 2-201.02 et seq. Defendant insurance companies guaranteed the bond as co-sureties. In moving to dismiss, they now maintain that Plaintiffs are not eligible to sue on the bond, and that even if they were, thеy have failed to comply with a one-year statute of limitations. Plaintiffs *3 counter that they are not only eligible, but that they also benefit from a two-year limitations statute, which applies to suits brought by workers, as opposed to suppliers and sub-contractors. The Court ultimately agrees with Plaintiffs and holds both that they have stated a claim under the DBA and that their action is timely.
I. Background
Plaintiffs were employed by S & J Acoustics, a second-tier subcontractor (or sub-subcontractor) retained to complete ceiling installation on the Consolidated Forensic Laboratory, a building owned by the District of Columbia. See Am. Compl., ¶¶ 2, 5. Pursuant to the DBA, 40 U.S.C. § 3141 et seq., and the DCLMA, D.C.Code § 2-201.01 et seq., the project’s prime contractor, Whiting-Turner Contracting Co., provided a payment bond to the District of Columbia as an assurance that project laborers would receive payment at Department of Labor-mandated hourly rates. See Am. Compl., ¶¶ 3, 8. In bringing this action against Defendants (1) Fidelity and Deposit Company of Maryland and (2) Travelers Casualty and Surety Company of America, who insured Whiting-Turner’s bond as co-sureties, see id., ¶ 3, Plaintiffs allege that they were not paid for their contributions to the рroject in accordance with these designated wage rates. See id., ¶¶ 16-18, 21. As background, the DCLMA requires contractors on government-funded projects to secure payment bonds to protect the interests of suppliers of materials and subcontractors, and the DBA establishes prevailing wage rates for workers who contribute to government-funded construction projects.
Prior to initiating this action, Plaintiffs filed an administrative complaint with DOL, requesting that payments to the project’s prime contractor be withheld until an investigatiоn could be completed and Plaintiffs compensated for the alleged back wages.
See id.,
¶¶ 23-25. As the project had since wound up and all payments had been released to Whiting-Turner, the DOL investigator closed the case without making any findings on Plaintiffs’ eligibility for relief under the DBA.
See id.,
¶¶ 24-25. After Plaintiffs brought suit and Defendants filed their Motion to Dismiss, the Court
súa sponte
raised the issue of subject-matter jurisdiction, questioning whether Plaintiffs had sufficiently exhausted their administrative remedies with DOL.
See
Order to Show Cause at 2-3. Out of deference to DOL’s plenary role in making DBA back-wage determinations, thе Court issued a temporary stay in the proceedings and ordered Plaintiffs to return to DOL and request that conclusive findings be made.
See
ECF No. 16 (Order) at 4. Plaintiffs did so, but without success. DOL refused to take further action on the ground that the government had already made all payments to the prime contractor and had no further funds to withhold.
See
Joint Status Report, ¶¶ 6-7 & Exh. A. Satisfied that Plaintiffs had made all efforts to exhaust remedies with DOL, the Court concluded that it did have subject-matter jurisdiction under the DBA and could consequently address the substance of their claims and Defendants’ pending Motiоn to Dismiss.
See Castro v. Fid. & Deposit Co. of Maryland,
No. 13-818, — F.Supp.3d-,
Plaintiffs have since moved to amend their Complaint in order to clarify the contractual arrangement in effect between prime contractor Whiting-Turner and S & J Acoustics, Plaintiffs’ employer. See Am. Compl., ¶ 5 & Exh. B. The Court permitted the amendment without objection from Defendants, who argue that dismissal is nevertheless appropriate.
*4 II. Legal Standard
In evaluating a Motion to Dismiss under Federal Rule of Civil Procedure 12(b)(6), the Court must “treat the complaint’s factual allegations as true ... and must grant plaintiff ‘the benefit of all inferences that can be derived from the facts alleged.’”
Sparrow v. United Air Lines, Inc.,
III. Analysis
In weighing Defendants’ Motion, the Court must consider the respective scopes of application of sections of the three statutes implicated in this case—namely, § 2-201.02 of the DCLMA, § 3144(a)(2) of the DBA, and § 255 of the Portal-to-Portal Act, 29 U.S.C. § 251 et seq.—and the interrelationships among them. Application of these statutes, Defendants contend, demonstrates that Plaintiffs do not qualify for any remedy. But even if they did so qualify, Defendants nevertheless maintain that Plaintiffs’ suit is untimely.
To support these positions, Defendants offer a number of justifications that intersect and overlap, making them somewhat challenging to parse; What is evident is that this suit poses novel issues, and that neither Plaintiffs nor Defendants have much in the way of precedent to guide them. To date, the opinions that have discussed the DBA, the DCLMA (and its model, the Federal Miller Act), and the PPA have done so in piecemeal fashion, providing only a limited analytical framework for cases such as this one. In responding to Defendants’ arguments, therefore, the Court must traverse largely uncharted territory. It thus begins with a discussion of whether a remedy is available under either the DCLMA or DBA and then proceeds to consider the limitations question.
A. Availability of Remedy
Defendants first argue that Plaintiffs cannot invoke the DCLMA to sue on Whiting-Turner’s payment bond because eligibility under the statute is restricted to those suppliers of labor and materials that have been retained either by the prime contractor or by an immediate subcontractor. See Mot. to Dismiss at 9; Reply at 1-2. Since Plaintiffs were hired by a second-tier subcontractor, Defendants suggest that they fall outside of the scope of the statute. See Supp. to Mot. to Dismiss at 3.
Defendants further maintain that Plaintiffs also have no remedy under the DBA. They premise this argument on the text of DBA § 3144(a)(2), which provides that “laborers and mechanics have the same right [of] action ... as is conferred by law on persons furnishing labor or materials.” See Reply at 4. The use of the phrase “same right,” according to Defendants, demonstrates that § 3144(a)(2) does nоt actually grant aggrieved workers an independent cause of action, but merely references the applicable bond statute—in this case, DCLMA § 2-201.02. See Mot. to Dismiss at 9; Reply at 1 (“Plaintiffs do not have separate cause [sic ] of action against the Defendants in this case under the DBA____”). Alternatively, even if § 3144(a)(2) does create a freestanding cause of action, Defendants reason that the result should be the same because “the *5 rights, if any, that were conferred [by § 3144(a)(2) ] were limited by the express terms of the bond statute.” Reply at 7. The DBA, by this logic, merely duplicates the DCLMA, mirroring its procedural requirements and limitations on eligibility.
To address Defendants’ contentions, the Court first analyzes the scope and requirements of the DCLMA. It then turns to an examination of § 3144(a)(2) of the DBA to determine whether it provides an independent remedy with its own terms and conditions.
1. The DCLMA
The DCLMA, D.C.Code § 2-201.02
et seq.,
is modeled after the federal Miller Act, 40 U.S.C. § 3131, and opinions interpreting the latter statute provide persuasive authority for disputes under the former.
See Hartford Acc. & Indem. Co. v. D.C.,
Suppliers and contractors have few procedural hurdles to contend with when they sue on a prime contractor’s bond. If a supplier has not received payment within a 90-day period, it need only notify the prime contractor of its intention to collect on the bond before initiating a suit. See § 3131(b); D.C.Code § 2-201.02(a). Neither the Miller Act nor the DCLMA require the aggrieved party to seek administrative review of a claim before turning to the courts. See id.
Congress did impose sharp restrictions on the scope of the Millеr remedy, however, and only those parties with close links to the prime contractor can claim the proteptions of the bond. Those who have an attenuated connection to a project and operate further down the chain of commerce are excluded from coverage.
See F.D. Rich Co., Inc.,
In addition to excluding those beyond two degrees of contractual privity to the prime contractor, the Miller Act has another limitation. Unlike the DBA and other federal labor and wage statutes, Miller was not designed with the welfare of
workers
in mind, but was instead tailored to protect
suppliers and subcontractors.
In thе Supreme Court’s reading, the Miller Act “exelude[s] ordinary laborers” from its scope, only extending to those “who perform[ ] for and take[ ] from the prime contractor a specific part of the labor or material requirements of the original contract.”
Clifford F. MacEvoy Co. v. U.S. ex rel. Calvin Tomkins Co.,
The restricted scope of application of these bond statutes means that Plaintiffs cannot qualify under the terms of the DCLMA alone because they neither worked in the capacity of suppliers or subcontractors, nor were they hired by Whiting-Turner or an immediate subcontractor. Indeed, if the DCLMA furnishes the only, available remedy in cases such as this one, many workers employed directly at a job site would never be able to collect on a prime contractor’s bond, either because they were hired beyond a certain orbit of contractual privity,
see J.W. Bateson Co.,
2. DBA § SlU(a)
The game is not over, however, because the DBA protects precisely those “ordinаry laborers” that the Miller Act appears to exclude. The DBA applies to any construction contracts for public works and public projects that exceed $2,000 in value and to which either the Federal Government or the District of Columbia is a party. See 40 U.S.C. § 3142(a). It obliges contractors on such projects to pay workers in accordance with prevailing wage rates, established by the Secretary of Labor. See id. In the event that contractors do not comply with prevailing wage rates, a worker may seek redress through the mechanism set out in DBA § 3144(a)(2). Promulgated in 1935—just six days after the federal Miller Act was updated to reflect its current language—§ 3144(a)(2) is broadly worded, granting a right of action to “all the laborers and mechanics who have not been paid the wages required” pursuant to the DBA. In contrast to the Miller Act and DCLMA, which condition their protections on a requisite level of contractual proximity to the prime contractor, DBA eligibility appears to hinge upon a laborer’s presence at the job site. Section 3144(a)(2) stipulates that each “contractor or subcontractor” involved in a “contract” governed by the DBA “shall pay all mechanics and laborers employed directly on the site of the work, unconditionally and at least once a week ... regardless of any contractual relationship which may be alleged to exist between the contractor or subcontractor and the laborers and mechanics.” § 3142(c)(1) (emphasis added).
Although the DBA does not separately delineate the terms “contract,” “contractor,” “subcontractor,” or “laborer,” these terms are defined in corresponding regulations promulgated by the Secretary of Labor. See 29 G.F.R. § 5.2. The term “con *7 ■tract” comprises “any prime contract which is subject ... to the labor standards provisions of [the DBA] and any subcontract of any tier thereunder, let under the prime contract.” § 5.2(h) (emphasis added). This definition, unlike that in the DCLMA, is not limited by a particular degree of separation from the prime contractor. The regulations, in fact, expressly disavow any requirement that a worker demonstrate a particular contractual relationship, instead providing that “[e]very person performing the duties of a laborer or mechanic in the construction ... of a public building or public work ... is employed regardless of any contractual relationship alleged to exist between the contractor and such person.” § 5.2(o). The regulatory definition of “laborer” is governed by function, not by contractual formality, and extends to “at least those workers whose duties are manual or physical in nature.” § 5.2(m).
Even in the unlikely event that a court were to find the text of the DBA ambiguous, it would still be bound to apply DOL’s regulatory definitions in making its decision. “Because the Secretary of Labor has interpreted the Act,” сourts must defer to the Secretary’s judgment provided that these “interpretations are reasonable.”
AKM LLC v. Sec’y of Labor,
3. Interplay Between Statutes
Regardless of the DBA’s general scope of application, Defendants nevertheless argue that § 3144(a)(2) does not create a freestanding cause of action, and even if it does, whatever remedy it provides is functionally identical to that offered by the DCLMA. This is evident, Defendants argue, in the text of § 3144(a)(2), which offers workers only the “same right ... as is conferred by law on persons furnishing labor or materials.” See Mot. to Dismiss at 9; Reply at 1, 4-8. Neither common sense nor a holistic reading of § 3144(a)(2) supports such a result.
Clearly titled as a “[r]ight of action,” DBA § 3144(a)(2) provides that, if the Secretary of Labor’s withholdings under the terms of a contract are “insufficient to reimburse
all the laborers
and mechanics who have not been paid the wages required[,] ... the laborers and mechanics have the same right to bring a civil action and intervene against the contractor аnd the contractor’s sureties as is conferred by law on persons furnishing labor or materials.” (Emphasis added). Two points are notable here. First, the express title of § 3144(a)(2) indicates that Congress believed that it was creating a new and fully functional right of action, and not merely a superficial reference to remedies already available under the bond statutes. While many battles have been waged over whether or not an aggrieved worker can claim an implied right of action under the DBA and thereby circumvent the administrative-exhaustion requirements of § 3144(a),
see, e.g., Univers. Research Ass’n v. Coutu,
450
*8
U.S. 754, 780,
Second, the formulation “all the laborers ... who have not been paid” sets an expansive scope of application that is not obviously restricted by what follows. If Congress had intended to limit the scope of eligibility to sue on a bond to the narrow class of workers who might qualify under the terms of the Miller Act, it stands to reason that the legislature would have said so in clear and unambiguous terms or, more plausibly, would have completely omitted § 3144(a)(2) from the DBA. If Defendants are correct, § 3144(a)(2) would be mere surplusage, offering nothing of value over and above the remedies already available via the Miller Act and DCLMA. The Court cannot ignore the “ ‘cardinal principle of statutory construction’ that ‘a statute ought, upon the whole, to be so construed that, if it can be prevented, no clause, sentence, or word shall be superfluous, void, or insignificant.’ ”
TRW Inc. v. Andrews,
Perhaps even more troubling, Defendants’ assessment of § 3144(a)(2) would create two arbitrary classes of workers— first, those who satisfy the technical qualifications imposed by the terms of the Miller Act and DCLMA, and second, all otherwise DBA-eligible workers. If the Court were to endorse Defendants’ highly restrictive interpretation, it might encourage prime contractors to insulate themselves behind several layers of subcontracts and thus opt out of the obligation to pay DBA-mandated wages, particularly as a project draws to a close and the government is no longer able to withhold funds. It should be obvious, accordingly, that'all laborers present on the worksite of a DBA-eligible project should stand to benefit from the Act’s protections, regardless of contractual formalities. The Court thus concludes that § 3144(a)(2) of the DBA creates an independent cause of action that grants the ability to collect on a prime contractor’s bond to all eligible on-site workers, regardless of who hired them.
B. Applicable Statute of Limitations
Defendants’ final challenge pertains to the timeliness of this action. Because Plaintiffs narrowly missed the cut-off point for the DCLMA’s one-year statute of limitations,
see
D.C.Code § 2-201.02, due in large part to their efforts to exhaust administrative remedies with DOL, Defendants urge the Court to dismiss the suit.
See
Mot. to Dismiss at 3-4; Reply at 4. Plaintiffs, however, assert that they benefit from a two-year period conferred by Section 255 of the Portal-to-Portal Act. Having already argued that all of the DCLMA’s terms and conditions—including its statute-of-limitations provision—are incorporated by reference into the DBA § 3144(a)(2),
see
Mot. to Dismiss at 9; Reply at 1, Defendants maintain that the Portal-to-Portal Act did not alter the limitations period available under the DBA, at least for suits on a prime contractor’s bond.
See
Reply at 5-6. To further support this argument, Defendants rely upon past Supreme Court
dictum
that describes the PPA and Miller Act statutes of limitations as “incompatible,” and which might be read as obliquely questioning whether the PPA period applies to suits on a prime contractor’s bond.
See id.
(citing
Coutu,
The Court begins with the text of the PPA, which offers convincing evidence that a two-year statute of limitations should govern in DBA suits to collect back wages against a prime contractor’s bond. PPA § 255(a) provides, in relevant part:
Any action ... to enforce any cause of action for unpaid minimum wages, unpaid overtime compensation, and liquidated damages ... under the Fair Labor Standards Act ... the Walsh-Healey Act, or the Davis-Bacbn Act ... may be commenced within two years after the cause of action accrued, and every such action shall be forever barred unless commenced within two years after the cause of action accrued, except that a cause of action arising out of a willful violation may be commenced within three years after the cause of action accrued.
(Emphasis added.)
As Plaintiffs note, the language “any action ... to enforce any cause of action for unpaid wages” is expansive and appears to embrace all civil suits brought by workers to enforce DBA wage rеquirements.
See
Opp. at 7. While this limitation period has been found to apply to suits involving other statutes specifically named in § 255(a), particularly the Walsh-Healey Act,
see Unexcelled Chem. Corp. v. United States,
The PPA’s background and drafting history also support a literal reading of § 255. As the Supreme Court has explained, the PPA was “intended to curtail the numerous suits for unpaid compensation and liquidated damages under the FLSA,” following an earlier decision holding that workers could seek back-wаge compensation for the time incurred transiting to and from their places of employment.
Coutu,
The Supreme Court has examined the interactions among the DBA, the Miller Act, and the PPA’s statute-of-limitations
*10
provision on just one occasion, and only tangentially.
See id.
at 779-82,
More likely, the Court’s response was only intended to discredit the theory that the difference between the PPA and Miller Act limitations periods amounted to congressional affirmation that the DBA offered two avenues for worker redress—the exprеss remedy of § 3144(a)(2) and a functionally separate implied remedy. The discrepancy between the two periods was simply not on Congress’s radar at the time it promulgated the PPA.
Later observations in the
Coutu
case, also in
dictum,
further undermine Defendants’ argument. In its review of the Act’s drafting history, the Court observed that remarks .made during Senate debate on the PPA “strongly suggest! ] that the limitations period ... was designed to apply to the explicit statutory remedy set forth in [§ 3144(a)(2) of] the Davis-Bacon Act.”
Coutu,
When considered in this historical context, there appears to be even less support for Defendants’ argument that, due to the supposed incompatibility between the limitations periods in the PPA and Miller Act, back-wage suits initiated under the DBA—unlike those brought under the FLSA and Walsh-Healey Act—must be initiated within a one-year window. The difference between the two limitations periods can, in this Court’s view, be explained by the dissimilar conditions facing workers and suppliers when they sue against the prime contractor’s bond—conditions that Congress took into account when promulgating the PPA. As already discussed above, the Miller Act and DBA § 3144(a) protect two distinct groups of aggrieved persons and impose different prerequisites for bringing a civil action. To repeat: suppliers and subcontractors, unlike workers, are not required to exhaust any administrative remedies before initiating an action in federal court; if they have not been paid within a 90-day period, they can seek immediate redress.
See
40
*11
U.S.C. § 3133;
see also
D.C.Code § 2-201.02(a). Workers, however, must first seek a remedy with DOL, proceeding against the prime contractor’s bond only after the government determines that it has not withheld sufficient funds under the contract.
See Lopez Castro,
— F.Supp.3d at-,-,
The facts of this case provide an apt example. Although Plaintiffs promptly notified the prime contractor of their alleged underpayment and filed an administrative complaint with DOL in July of 2012, see Am. Compl., ¶¶ 22-23, DOL did not assign the matter to an investigator until February of 2013 or provide any'response to Plaintiffs until April of the same year. See id., ¶¶ 24-25. The shorter limitations period would thus punish people like Plaintiffs for delays largely beyond their control.
The Court, therefore, concludes that because’ Plaintiffs’ DBA action is subject to a two-year statute of limitations, it is timely.
IV. Conclusion
For the forgoing reasons, this Court will issue a contemporaneous Order this day denying Defendants’ Motion to Dismiss: