299 N.W. 485 | Neb. | 1941
This is an action to recover for damages sustained to growing crops as a result of seepage alleged to have been caused by water from the defendant’s supply canal. Plaintiff recovered a judgment for $598.82, and defendant appeals.
Plaintiff was the owner, during the times herein mentioned, of two tracts of land lying south of the North Platte river in Keith county. For convenience, the east tract will be referred to as the Lute land and the west tract as the Snyder land. The lands alleged to have been seeped by defendant’s supply canal are approximately one-half mile south of the North Platte river. Both seeped areas lie immediately south of the Union Pacific railroad which runs along the south side of the valley until it enters the Snyder land, where it turns north and crosses the North Platte river. A short distance south of the Union Pacific railroad
With these conditions existing, the defendant constructed a canal about one-half mile to the south of the Keith-Lincoln county canal. This canal was about 40 feet wide at the bottom and 60 feet in width at the top. It was used for the first time in 1935, but ran only a small head of water. Water ran in the canal in 1936 and until February, -1937, when a break in defendant’s siphon across the South Platte river occurred and prevented its further use for some time. Damages to crops were claimed for the years 1937 and 1938.
'There is evidence in the record that defendant’s canal crosses several sand draws. Plaintiff did not show that these sand draws were carrying subterranean waters in the general direction of his seeped lands. An engineer called by the defendant testifies that borings made by him below defendant’s canal showed that the earth was dry 15 feet below the surface.
It cannot be questioned that plaintiff’s lands are seeped and water-logged. There is evidence in the record that they have always been so low that they have at times become wet. One witness testifies that he had been duck-hunting on these lands many times before defendant’s canal was built. There is evidence that Bull ditch was constructed to carry away the waters causing this water-logged condition, and that because of a failure to clean Bull ditch, it had filled up with weeds and slime and failed to operate as a drainage ditch. In the opinion of the defendant’s en
That natural conditions have contributed to the seepage on plaintiff’s lands cannot be disputed. The involved lands are naturally low and are generally referred to as first bottom lands. The evidence shows that they are underlayed with a hard clay formation not conducive to absorbing waters above it, which contributes to the seeped condition and makes drainage necessary. The old Burlington grade has also settled and packed until subterranean waters percolating toward the river have been held back by it and added to the seeped waters accumulated on the Lute land. The slope of the land immediately south causes much surface drainage to be cast down upon plaintiff’s lands. This, added to the tail waters derived from the application of canal and pumped water for irrigation, adds to the accumulation of subterranean water. There is evidence in the record that subterranean flow from the river percolates into the area of plaintiff’s seeped lands from the west during flood seasons, due to the fact that this area was once a channel of the river. All of this evidence tends to establish that there are causes for the seeped condition of
In Joldersma v. Muskegon Development Co., 286 Mich. 520, 282 N. W. 229, the court, in a case similar in principle, said: “It was incumbent upon plaintiffs to establish by some means a relationship between the contents of defendant’s sump and their damage. The burden of proof was not met, in view of all the circumstances, by a simple showing that defendant permitted salt water to seep into the ground and that salt appeared at a distance of several hundred feet to the south. It was their burden to establish this relationship, not by a guess of the jury, but by the production of some competent testimony.”
In Enders v. Sinclair Refining Co., 220 Wis. 254, 263 N. W. 568, the court said: “It is considered that the evidence in this case, instead of eliminating the possibility of contamination from other sources, is such as to establish quite satisfactorily the fact that pollution comes from other sources rather than from the defendant’s bulk-station plant. The trial court apparently rejected the percolation theory, and rested the case entirely upon the proposition of a crevice which connected the two places. Whether or not there is such a crevice and whether or not it connects the two premises is purely a matter of speculation and conjecture. The only test that could be made was made and it tended to disprove rather than establish the plaintiffs’ case. It cannot be said that plaintiffs have by a fair preponderance of the evidence established the fact upon which
And in Wynn v. Wilson, 252 Ky. 352, 67 S. W. (2d) 483, the court said: “Under the evidence it is just as probable that the oil or water came from another source as from the abandoned well, thus presenting á case where all that the jury could do was to indulge in surmise or speculation. Where that is the case the evidence is not sufficient to take the case to the jury, and appellant’s motion for a peremptory instruction as to the injury to the spring should have been sustained.”
In the case before us there is no proof of actual loss from defendant’s supply canal or any showing of the direction of any underground flow immediately below the canal. There is evidence of other sources of seepage contributing to or causing the damage. Under these circumstances, the defendant’s motion for a directed verdict should have been sustained.
For the reasons herein stated, the judgment of the district court is reversed and the cause remanded for a new trial.
Reversed;