58 Colo. 308 | Colo. | 1914
delivered the opinion of the court:
1. The Moorhead Mining and Milling Company, plaintiff below, defendant in error, owns the Franklin lode mining location situated in Upper San Miguel mining district, and the Liberty Bell Gold Mining Company, defendant below, plaintiff in error, owns the Lucky Boy, Tariff, Overlook, lone and Winner lode mining locations, all joining the Franklin. A main vein, called the Liberty Bell vein, traverses the mountain, on the strike for miles, in an easterly and westerly direction. Two secondary veins to the main vein apex upon the Franklin, called by defendant the S. Hanging Wall and the Winner veins, and by plaintiff, Franklin No. 1 and the Waters veins. The dip of all these veins is southerly, and on the dip they pass under and through the Franklin and extend far
2. Defendant admits plaintiff owned the secondary veins upon which it trespassed for over three years and removed large bodies of ore which it milled, and sold the finished product and applied all the proceeds to its own use. The only excuse it now offers for the trespass is that a great portion of the ore was taken innocently with. an honest mistake of plaintiff’s right thereto; that the apexes of the veins were buried under a deep wash and their location could only be calculated; that in its deep mining’beneath the surface-, defendant made a mistake in calculating the location of tho tops of the veins, which, as soon as it ascertained, it ceased mining thereon except that in cleaning up, about 300 tons of ore was removed from the Winner vein after the mistake was discovered.
3. In case of innocent trespass by mining and milling metalliferous ores, where the trespasser sells the finished product and applies the proceeds to his own use, the owner should be reimbursed for his actual loss and his damages are compensatory only. The measure of
4. The court in effect told the jury in willful trespass the measure of damages was the enhanced value or gross proceeds realized from the ore at the time of the conversion with no deductions; that is, the owner could recover the full amount realized by defendant from the ore at the time of conversion without deductions for any cost in making the finished product from the raw material; that in willful trespass of this kind, the defendant should be at the expense of mining and milling the ore for the benefit of the owner. This is complained of as error. Defendant admits in willful trespass, it was entitled to no deductions for the cost of mining and bringing the ore to the mouth of the mine, but claims it was entitled to deductions thereafter for milling and transportation charges; in other words, that the conversion took place at the mouth of the mine and not at the time it applied the gross proceeds or finished product to its own use. This contention has lately been decided adversely to defendafit by the United States Circuit Court of Appeals.— Liberty Bell Co. v. Smuggler Co., 122 U. S. C. C. A. 113.
Defendant’s contention is based upon cases of trespass upon coal veins, where the conversion usually takes place at the collar of the shaft, and hence are not applicable here. In case of willful trespass upon metalliferous veins, where the trespasser has mined, milled and sold a finished or enhanced product, the conversion takes place when he applies the proceeds to his own use, and
5. The jury returned a^ general verdict for $46,072.50. No special finding was made or requested. Complaint is now made that the jury may have based some of its damages on ore taken from the main vein, which the court found belonged to defendant. Plaintiff’s evidence of ore taken from the S. Hanging Wall vein, •was 5445 tons of the value of $74,324.25; from the Winner vein 12220 tons' of the value of $83,707.00, making a total tonnage from these two veins of 17665 tons, and a total value of $158,029.00. Allowing from this the agreed deduction of $4.64 per ton, it leaves as the net value of the finished product, according to plaintiff’s minimum values, $76,165.65. Defendant’s testimony showed an admitted trespass on the two veins of 2842 tons of the value of $15,996.00, and the average between plaintiff’s minimum and defendant’s maximum values gives $46,035.08, or within $35.00 of the verdict. Plaintiff claimed in its complaint a tonnage in excess of 100,000 tons and a damage of over $500,000.00, and if the jury had based its verdict on the main vein, it would seem they must have found much larger damages than they did. Prom defendant’s own testimony, had they allowed damages on the main vein, the verdict would have been $138,727.36. The court found the trespass was on the secondary veins owned by plaintiff, and not on the main vein owned by defendant; it instructed the jury that each party to the action was entitled to all the veins, throughout their entire depth, the top or apex of which lay inside the surface lines of the location extended downward vertically, although such veins so far departed from a perpendicular in their downward course as to
We are of the opinion plaintiff recovered damages for trespass and conversion upon the secondary veins only. Judgment affirmed.
Affirmed.
Decision en banc.