Lead Opinion
OPINION OF THE COURT
Denise Lauderbaugh wants to install her manufactured mobile home, which complies with standards established by the Department of Housing and Urban Development (HUD), in the “R-2” residential district in the town of Hopewell. The HUD standards were created by the National Manufactured Housing Construction and Safety Standards Act (NMHCSSA), 42 U.S.C. §§ 5401-5426, an act that prohibits municipalities from imposing construction and safety standards on manufactured homes that differ from the federal standards.
I. Facts
In May of 1998, Denise Lauderbaugh prepared to purchase a home. She examined manufactured mobile homes sold by Larry’s Homes of Pennsylvania, Inc., and selected a multi-section manufactured home which would be placed on a permanent foundation with wheels and axles removed. The home Lauderbaugh selected was a HUD home, complying with the NMHCSSA. Lauderbaugh also looked at property in Hopewell Township and discussed acquiring building permits with Hopewell’s zoning officer, John Bates. Bates informed Lauderbaugh that the property she was considering was zoned “R-2” and that mobile homes were not permitted in the R-2 district. In a December 1998 letter, Bates explained that to qualify for the R-2 district, a home must be a “BOCA/CABO” home; that is, it must meet the following building codes: the 1993 BOCA building Code, the 1992 CABO One and Two Family Dwelling Code, the 1993 BOCA National Plumbing Code, and the 1993 BOCA National Fire Prevention Code. He also explained that “HUD Homes” were considered “mobile homes” and could not be located in the R-2 district, but only in the R-l district. Bates claims that Lauderbaugh then told him that she planned to install, not a mobile home, but a BOCA/CABO compliant manufactured modular home.
The Hopewell zoning ordinance allows “mobile homes” in the R-l district, but not in any other residential district. The ordinance defines mobile homes in S 310(60) as:
A transportable, single-family dwelling intended for permanent occupancy, оffice or place of assembly contained in one unit or in two units designed to be jointed into one integral unit capable of again being separated for repeated towing which arrives at a site complete except for minor and incidental unpacking and assembly operations, and construct*572 ed so that it may be used without a permanent foundation.
After her contact with Bates, Lauder-baugh arranged to purchase the HUD home. She contracted to buy a parcel of land in an R-2 district in Hopewell and to have the site prepared with a permanent foundation and a basement. She also applied for a building permit. The permit was issued, identifying the structure to be built as a “mason/frame” building proposed to be used as a single-family home. Hopewell claims that Lauderbaugh obtained her permit by misrepresentation because she had stated that she planned to place a modular home, not a mobile home, on the property. Bates contends that Lauder-baugh told him she needed the permit immediately to go to closing on the land and that she would deliver the plans for the modular home when she picked up the permit. Bates was not present when Lauderbaugh came in for the permit, and she did not deliver plans for a modular home. Lauderbaugh, on the other hand, contends that she was told by Larry’s Homes that the Chief of the Pennsylvania Manufactured Housing Division had said that “the [Hopewell] ordinance did not preclude the siting of a HUD-Code home in either Zoning District R-2 or anywhere else in Hopewell Township.”
On June 2 and 15, 1999, the two halves of Lauderbaugh’s home were delivered to the lot. When Bates saw that she was attempting to locate a HUD home in the R-2 district, he verbally revoked her building permit and forbade the placing of the home on the foundations. He formally revoked her permit in a letter, dated July 2, stating that the permit was revoked because the home was brnlt to the HUD Code rather than in compliance with BOCA/CABO. Soon thereafter, Lauder-baugh hired legal counsel and began to dispute the revocation of the building permit.
Lauderbaugh first filed an appeal from the formal revocation of her building permit with the Hopewell Township Zoning Hearing Board on July 19. The Zoning Hearing Board began a hearing on August 12 but continued it indefinitely for reasons that are not clear. The day after the hearing began and, despite the fact that the appeal was still pending before the Zoning Hearing Board, Bates sent a letter to Lauderbaugh demanding that she immediately remove her home because it posed a danger to the safety of neighborhood children and it was partially located on the public right of way.
To explаin the basis for the exclusion of mobile homes from R-2 districts, during the preliminary proceedings in this case, Hopewell presented affidavits from Ray
II.Procedural History
On August 20, 1999, Lauderbaugh and Larry’s Homes of Pennsylvania, Inc., filed a complaint in the United States District Court for the Western District of Pennsylvania. The complaint alleged that Hopewell Township had violated Lauderbaugh’s Fifth Amendment rights, her rights to due process and equal protection of the law, the NMHCSSA, and Pennsylvania state law. The plaintiffs also moved before the Zoning Hearing Board to continuе indefinitely Lauderbaugh’s appeals pending the resolution of this lawsuit.
Hopewell moved to dismiss the complaint because the action was not ripe for adjudication. The District Court denied that motion. After further proceedings, the District Court denied plaintiffs’ motions for summary judgment on their procedural and substantive due process, equal protection, Fifth Amendment Takings Clause, and state law claims. The court did not grant summary judgment on the substantive due process and equal protection claims because it found that material issues of fact existed as to whether aesthetic qualities of mobile homes and their effect on property values had led to the revoсation of Lauderbaugh’s building permit. The District Court then did grant summary judgment in favor of Lauder-baugh and Larry’s Homes of Pennsylvania, Inc., with respect to their claims under the NMHCSSA, finding that Lauderbaugh’s “manufactured” home was excluded from the R-2 district based solely on the fact that it was built to NMHCSSA standards and not to BOCA/CABO standards. As a result, the District Court ordered Hopewell to allow Lauderbaugh to install her mobile home on her property. Hopewell appealed.
III.Jurisdiction and Standard of Review
Our jurisdiction over this case is in dispute. The District Court exercised subject matter jurisdiction pursuant to 28 U.S.C. §§ 1381 and 1367 because the claims arose under the Constitution and laws of the United States and were part of the same case or controversy. However, as discussed below, the parties dispute whether these claims were ripe for adjudication by the District Court. We have jurisdiction to review a final order of the District Court under 18 U.S.C. § 1292.
We exercise plenary review over both the District Court’s ripeness determination, see Presbytery of New Jersey v. Florio,
IV.Discussion
A. Ripeness
Hopewell first challenges the District Court’s ruling on the grounds that this
Lauderbaugh’s first contention is that we should ignore Hopewell’s ripeness argument. She points out that Hopewell’s Notice of Appeal does not refer to the orders of the District Court that addressed the ripeness issue. As a result, she argues, Federal Rule of Appellate Procedure 3(c) denies us jurisdiction to consider ripeness. Her argument is clearly misplaced. In Acierno v. Mitchell,
We turn, therefore, to Hopewell’s argument. It is well established that, in § 1983 cases involving land-use decisions, a property owner does not have a ripe claim until the zoning authorities have had “an opportunity to ‘arrive[ ] at a final, definitive position regarding how [they] will apply the regulations at issue to the particular land in question.’ ” Taylor Investment, Ltd., v. Upper Darby Township,
Hopewell urges us to dismiss Lauder-baugh’s claim as premature. It argues that this case is like Sameric, Ademo, and Taylor because the Zoning Hearing Board’s decision to deny Lauderbaugh’s building permit is reviewable de novo by the Zoning Hearing Board, which has yet to make a final decision. See Sameric,
Hopewell’s argument ignores, however, that Lauderbaugh attempted to avail herself of the appeals process. She appealed the formal revocation of her building permit to the Hopewell Township Zoning Hearing Board on July 19, 1999. She also appealed the August 13th letter from Hopewell that demanded that she immediately remove her home because it was a safety hazard. She filed this lawsuit only after the Zoning Hearing Board had indefinitely continued her appeals and Hopewell
Thus, this is not a case, like Sameric, Acierno, and Taylor, where a plaintiffs failure to take advantage of available, subsequent procedures foreclosed any chance that those procedures could resolve the controversy and obviate the need to address the constitutional issues. Instead, Hopewell’s decision to ignore the appeals and enforce its zoning decision by forcing Lauderbaugh to pay to move her home has created a justiciable controversy.
Hopewell cannot treat its zoning decision as final enough to force a significant hardship upon Lauderbaugh by forcing her to pay to move her home but not final enough to be ripe for adjudication. The ripeness doctrine prevents judicial interference “until an administrative decision has been formalized and its effects felt in a concrete way by the challenging parties.” Abbott Labs., Inc. v. Gardner,
Hopewell agues that this analysis is incorrect, claiming that it is not treating its zoning decision as finally decided. Despite its threats of litigation, Hopewell contends that it ordered Lauderbaugh to remove her home for safety reasons, not because it considered its zoning decisions final. But, it was Hopewell’s own stоp work order that created the danger by preventing Lauderbaugh from installing her home, and that stop work order was predicated on Hopewell’s finding that Lauderbaugh’s home could not be installed in the R-2 district. Thus, although Hopewell has not denied the Zoning Hearing Board’s authority to oversee all zoning decisions, it is treating its own zoning decision as final enough to inflict a concrete injury on Lauderbaugh. As a result, we will affirm the District Court’s ruling that this case is ripe for adjudication.
B. Preemption
The substantive issue in this case is whether the District Court properly held that the NMHCSSA preempted Hopewell’s zoning ordinance. The District Court granted summary judgment in favor of plaintiffs because it found, as a matter of law, that Hоpewell used safety and construction codes that conflict with the NMHCSSA to exclude from the R-2 district some manufactured homes, ie., HUD homes which comply with the NMHCSSA, but not other manufactured homes which comply with BOCA/CABO. We must determine whether Hopewell is excluding HUD homes from its R-2 district solely because HUD homes fail to meet the BOCA/CABO safety and construction standards, as opposed to the NMHCSSA safety and construction standards, or because HUD homes fail to meet some other, permissible, zoning criteria.
The NMHCSSA was enacted to protect consumers by reducing accidents,
In order to achieve the consumer protection goal of providing for minimum construction and safety standards in the construction of manufactured homes, the NMHCSSA explicitly preempts state and local safety and consumer protection regulations regarding manufactured homes. The act provides:
Whenever a Federal mаnufactured home construction and safety standard established under this chapter is in .effect, no State or political subdivision of a State shall have any authority either to establish, or to continue in effect, with respect to any manufactured home covered, any standard regarding construction or safety applicable to the same aspect of performance of such manufactured home which is not identical to the Federal manufactured home construction and safety standard.
42 U.S.C. § 5403(d). See also, 24 C.F.R. § 3282.11(a) (Manufactured Homes Procedural and Enforcement Regulations that effectuate § 5043(d)). Thus, the NMHCSSA prohibits localities from imposing any safety and construction standard upon manufactured homes that differs from the federal standard.
The preemptive effect of NMHCSSA extends to safety and construction standards used to define zoning regulations. Thus, although localities may legitimately regulate land use to advance a myriad of different interests, including property values, aesthetics, health, and the general welfare, see Penn Cent. Transp. Co. v. City of New York,
The distinction between safety and construction standards and zoning regulations intended to promote aesthetic and property value standards may not be immediately evident from the language of a zoning ordinance. For example, in Georgia Manufactured Housing Assn., Inc. v. Spalding County,
The language of the Hopewell Zoning Ordinаnce 95-2 does not refer to NMHCSSA or to any other construction or safety standards for manufactured homes. Section 600 of the ordinance sets out the permitted uses for the R-l Residential-Agricultural District, which include “single family dwelling unit,” “mobile homes on individual lots” (with certain provisos not relevant to the case before us), “municipal recreation facilities,” “educational and religious uses,” “municipal facilities,” and “agriculture, horticulture and/or silviculture.” Section 700 describes the permitted uses for the R-2 Residential-Low District as “single-family dwelling units,” “municipal recreation facilities,” “educational and religious uses,” and “municipal facilities.” Hopewell Township interprets “single-family dwеlling units” as permitted in the R-2 district to be those that comply with BOCA/CABO. This definition, as it applies to manufactured homes, includes modular homes but not mobile homes. We must determine whether the basis for that distinction is a safety and construction standard or a desire to promote aesthetics and to protect property values in the R-2 district.
The District Court considered this distinction in ruling on plaintiffs’ motions for summary judgment. In connection with plaintiffs’ substantive due process and equal protection claims, the District Court found genuine issues of material fact. In reviewing the substantive due process claim, the court determined that, despite Lauderbaugh’s contention that the revocation of her building permit was an irrational application of the zoning ordinance, a jury must determine whether HUD homes are aesthetically similar to modular homes and whether HUD homes have an adverse effect on the tax base or on property values. The court noted that, based on the evidence before it, including the Antonelli and Kohlman affidavits, “a reasonable fact finder could reach either conclusion.” The court found the same material question regarding aesthetic and property value issues existed with regard to the equal protection claim.
The court then found as a matter of law that, because Lauderbaugh’s “manufactured” home was excluded from the R-2 district based solely on the fact that it was bufit to NMHSSCA standards and not to BOCA/CABO standards, the ordinance contravened the express preemption provision of the NMHSSCA. In making its preemption analysis, the District Court found that there was no genuine issue of material fact as to the reason that Hopewell refused to allow Lauderbaugh’s home in the R-2 district. The court reasoned that even if the ordinance was enacted to protect aesthetics and property values, no mention of these concerns was made in the decision to exclude Lauderbaugh’s manufactured home from the R-2 district.
This ruling by the District Court implies that, despite the fact that aesthetics and рroperty value considerations might lie behind the enactment and overall interpretation of the Hopewell zoning ordinance, these factors cannot be considered relevant to the revocation of Lauderbaugh’s building permit unless specifically mentioned as such. We do not accept this distinction. If in fact the zoning ordinance was established and has been interpreted to protect aesthetics and property values, we see no need for its enforcers to proclaim that a decision is based on aesthetics and property values each time the ordi
On remand, the District Court must determine whether Hopewell’s ordinance, insofar as it pertains to mobile homes, was enacted solely to establish safety and construction standards of whether there was an underlying purpose to protect aesthetics and property values in certain residential districts. The NMHCSSA preempts only safety and construction standards. It is focused on consumer proteсtion, see 42 U.S.C. § 5401, and does not strip a township of its authority to make land use decisions regarding, for example, aesthetics or property values. Thus, although the NMHCSSA prevents localities from using safety standards to exclude manufactured homes from a zoning district, it does not stop them from excluding certain types of manufactured housing from a zoning district using some other, permissible, criteria — even if, by using that permissible criteria, the locality bans most, or even every, manufactured home.
Moreover, if a township has decided that certain types of manufactured homes — which it has defined as “mobile homes” — are aesthetically unpleasing, or harmful to local property values, but that other types of manufactured homes— which it has interpreted to be “modular homes” — are not, the township may bar “mobile homes” from a zoning district and allow “modular homes.” It may do so even if a “mobile home” is built in compliance with NMHCSSA standards. See Scurlock v. City of Lynn Haven,
Because we are reviewing the grant of a summary judgment motion, we must view all the facts in the light most favorable to the non-moving party, in this case, Hopewell Township. See Goodman v. Mead Johnson & Co.,
V. Conclusion
For the above stated reasons, we will reverse the judgment of the District Court and remand this case for further proceedings consistent with this opinion.
Notes
. NMHSSCA was enacted by Congress as a consumer protection measure. See, e.g., Scur
. A “modular” home is built off-site in modular components that are transported to a residential site and erected on a permanent foundation. Unlike a "mobile” home, a "modular” home is not built on a permanent chassis. See Texas Manufactured Housing Assn., Inc. v. City of Nederland,
. Lauderbaugh denies that either section of the home intruded into the public right of way.
Dissenting Opinion
dissenting.
I believe that the District Court’s thorough analysis, and conclusion with respect to the preemption issue, are entirely correct. Indeed, I can add to Judge Diamоnd’s opinion only the following references and observations. The Township’s zoning ordinance expressly permits the placement of mobile homes only in its R-l (residential-agricultural) district, and placing them in other districts is excluded by
The preemption problem arises from the manner in which the Township’s ordinance has been applied in this case, rather than its underlying purpose. I can agree that on its face, the ordinance does not distinguish between manufactured and modular homes, but only between “mobile homes” as defined in the statute and other types of single-family dwelling units. There is, however, no doubt from this record that the ordinance has been (albeit inconsistently) interpreted by the Township to preclude the permanent siting of factory-built mobile or “manufactured” homes built to the HUD Code, but to allow the placement of factory-built “modular” homes built to the BOCA/CABO Codes, in the R-2 district. The evidence establishes that Bates was enforcing the ordinance against Appellee based on the fact that her home is a HUD Code, rather than a BOCA/CABO Code home. Indeed, even on appeal, Appellants continue to distinguish between excluded mobile, or “manufactured”, homes and permitted factory-built, or “modular” homes on the basis of Code compliance. See Brief on Behalf of Appellants at 27-28 (discussing how mobile homes are built in conformity with HUD standards, unlike modular homes that are constructed in accordance with CABO standards). This distinction by Code is improper.
The NMHCSSA preemption statute provides, in pertinent part:
Whenever a Federal manufactured home construction and safety standard established under this chapter is in effect, no State or political subdivision of a State shall have any authority either to establish, or to continue in effect, with respect to any manufactured home covered, any standard regarding construction or safety applicable to the same aspect of performance of such manufactured home which is not identical to the Federal manufactured home construction and safety standard.
42 U.S.C. § 5403(d). In addition, HUD’s guidelines on preemption specifically provide that “a locality is free to adopt and enforce ordinances that regulate the appearance and dimensions of homes so long as the criteria ... do not have the effect оf
Appellants claim that the District Court’s finding that exclusion was predicated on non-compliance with the BOCA/ CABO Codes is inconsistent with its finding that a jury could conclude that exclusion of mobile homes from the R-2 zones was motivated by aesthetic and tax considerations. As the District Court was careful to point out, however, preemption under the NMHCSSA turns not on motive but on the effective imposition of a construction or safety code differing from the federally-approved HUD Code. Here, the mechanism for distinguishing between permitted and forbidden uses turns on Code compliance. The resulting practice is statutorily-preempted, regardless of the motive for the undеrlying distinction. In other words, although the Township is free to exclude certain types of housing based on aesthetic and tax considerations, when it in practice defines what housing is deemed aesthetically dissimilar and economically undesirable by the construction and safety codes to which such housing has been manufactured, it runs afoul of the NMHCSSA.
Notwithstanding the parties’ evident disagreement as to the purpose behind the appellants’ attempted exclusion of HUD mobile homes, it appears there is no material issue of fact on how the exclusion was applied. Indeed, Appellant conceded at oral argument that it has used the HUD code compliance as a “short-hand” or prоxy for its aesthetic and tax concerns. I believe this concession proves the correctness of Judge Diamond’s analysis. The Act forbids local governments from using non-compliance with a competing code as a criterion, no matter what their motive in doing so may be.
As the District Court stated, “under both case law and HUD policy, a locality cannot exclude or restrict manufactured homes that meet the federal standards if the locality accepts manufactured homes meeting other differing standards.” It was correct in concluding that because, as a matter of law, “the Township’s zoning ordinance [was] being enforced to restrict homes from being sited in сertain zoning districts based solely on the building code to which they were constructed,” such application was preempted by the express provisions of the NMHCSSA.
For these reasons, and those given "by the District Court, I would affirm.
. The ordinance defines a “mobile home” as a "transportable, single-family dwelling ... contained in one unit or in two units designated to be jointed into one integral unit ... which arrives at a site complete and ready for occupancy except for minor and incidental unpacking and assembly operations, and constructed so that it may be used without a permanent foundation.”
The record is undeveloped as to whether transportability is a workаble distinction between mobile and modular homes. Of course, the burden was on Defendants to come forward with evidence to create a triable issue as to that distinction, or some other non-Code based distinction, being the actual basis for permit denial. Nowhere in Defendants' brief do they mention the transportability distinction; rather they consistently distinguish permitted and excluded housing on the basis of code compliance.
. The District Court concluded that conflicting evidence regarding the aesthetic similarity of Plaintiff's home to others in the neighborhood, and the effect of HUD Code homes on property values and the tax base, raised genuine issues of material fact as to Plaintiff's substantive due process claim, to be resolved at trial.
