delivered the opinion of the court:
Based upon a claimed violation of the Structural Work Act, more commonly known as the Scaffold Act, (Ill. Rev. Stat. 1957, chap. 48, pars. 60-69,) the plaintiff, Stanley Larson, brought this action in the circuit court of Cook County against Commonwealth Edison Company and A. Kolflat, the latter doing business as Sargent & Lundy, to recover for personal injuries sustained when a scaffold on which plaintiff was working broke and fell. The trial court directed a verdict and judgment for defendant Sargent & Lundy, and a jury returned a verdict for defendant Edison upon which judgment was entered. On appeal by plaintiff both judgments were affirmed by the Appellate Court. (
Factual background shows that in November, 1955, Edison commenced the remodeling and rehabilitation of an electric generating plant it owned and operated in the city of Chicago. The plant consisted of several buildings, occupying an area of three city blocks, and the project entailеd the removal of old equipment, cleaning out the interior of the buildings to the walls, and the installation of new equipment. To provide for continued plant operation, the work was accomplished in a progressive fashion and was done in “units.” For example, prior to the removal of old turbines from Unit 8, new turbines were installed in Unit 7 and, before the work progressed to Unit 8, a temporary barricade or partition was erected between the two units so that demolition in Unit 8 could proceed without damaging what had been accomplished in Unit 7.
Edison entered into from 70 to 80 contracts with numerous contractors, each of whom was to perform specific work on the over-all project. The majority of the contracts were prepared by Sargent & Lundy, (hereinafter referred to as Sargent) a firm of consulting engineers specializing in the design of electrical generating stations, as were the work plan, structural designs, and specifications used in the construction work. These contracts specifically required the cоntractors to comply with the provisions of the Scaffold Act.
Plaintiff’s employer, Paschen, had a contract for the work in Unit 7, one provision of which stated: “The work shall be done under the general supervision and to the satisfaction of owner’s Station Construction Department * * The contract also obligated Paschen to perform additional work as directed by Edison and, in accordance therewith, a “purchase order” was drawn by Edison whereby Paschen was directed to erect the barricade between Units 7 and 8. By the terms of the purchase order, Paschen was to: “Furnish all labor, materials, tools and equipment required to install preliminary structural work for Unit No. 8, Crawford Station, as directed by the Station Construction Department, and in accordance with drawings to be issued by Sargent & Lundy.” To aid in the construction of the barricade, scaffolds were erected by Paschen employes and it was one of such scaffolds which broke, causing plaintiff to be thrown to the floor. As may be seen in greater detail from the opinion оf the Appellate Court, (
Apart from intermittent visits by its chief engineer, Sargent had no personnel working at that constructiоn site. However, six employees of Edison, all members of its Station Construction Department, were on the job at all times. According to one of the group, they exercised no control over the work, but merely inspected to see that the terms and specifications of the contracts were complied with. So far as the barricades were concerned, the same witness stated that the scope of their inspection did not extend to the kind or safety of the scaffold employed, but only to a determination of whether Edison “got the type of barricade specified.” Representatives of Edison’s Safety Department also visited the site periodically, and while their primary concern was the safety of Edison’s operating personnel still on the premises, it appears they could make, but not enforce, safety suggestions to the contractors and their employees. Weekly work progress reports were compiled by Edison and, adhering to a long practice between the two firms for many years, copies of the reports were forwarded to Sargent. In addition weekly or bi-weekly meetings, presided over by Edison, were held to co-ordinate the sequence of the work, and were attended by representatives of all the contractors and by a representative of Sargent.
Although there is general accord between the оther participants to the appeal that both Edison and Sargent may be sued as' persons potentially having duties under the Scaffold Act, it is the contention of one amicus curiae, based principally on Breton v. Levinson, (1917),
The principal controversy between plaintiff and defendant Edison is whether the trial court erred when, over plaintiff’s objection, it instructed the jury as follows: “The Court instructs the jury that the plaintiff is not entitled to recover damages under the provisions of the Structural Work Act unless he has proven by а preponderance, or greater weight of the evidence, that the defendant, Commonwealth Edison Company, had charge of the work by retaining control and supervision of such work being performed by Paschen Contractors, Inc.” (Emphasis added.) The controlling section of the statute, which is section 9, makes no mention of either the retention or exercise of control and supervision, but imposes a duty of compliance, and liability for either wilful violation or a failure to comply with the terms of the act, upon “any owner * * * having charge of the erection * * * [or] alteration * * * of any building * * * or other structure * * Ill. Rev. Stat. 1957, chap. 48, par. 69. (Emphasis added.)
It is the contention of the plаintiff, concurred in by a dissenting justice in the Appellate Court, that the instruction misstates the law and improperly limits and restricts the language of the statute, first, when it requires proof of the retention of supervision and control as the basis for Edison’s liability, and second, when it also requires proof of the retention of supervision and control over the spеcific work being done by Paschen. Conforming to the views of the majority opinion in the Appellate Court, it is contended by Edison, first, that the words “control and supervision” employed in the instruction are the legal equivalent of the statutory language “having charge of,” and second, that under the factual circumstances presented in this case it was essential to focus the attention of the jury on Paschen’s work.
While it may be conceded that some of the decisions in this jurisdiction involving the Scaffold Act appear to have equated “having charge” with “supervision and control” in varying degrees, it is our opinion the language of the statute, and the legislative intent it reflects, do not permit the cоnclusion that the terms are the inflexible and unbending legal equivalent of the other. The term “having charge of” is a generic term of broad import, and although it may include supervision and control, it is not confined to it. As was said of the word “charge” in People v. Gould,
In the Gannon case, (
It is to be gathered from the opinion of the Appellate Court, аnd the arguments of Edison in this court, that justification for the instruction given in this case may be found in the need to provide jurors with a definition of the statutory words “having charge of.” We do not believe such a need exists. It is well established that the meaning of words, used in their conventional sense, need not be defined or explained in giving instructions to the jury. (Nowak v. Witt,
We are, however, in accord with the view of the Appellate Court that, under the particular circumstances of this case, it was proper to restrict the instruction to “ [work] performed by Paschen Contractors, Inc.” As pointed out in Gannon (p. 323,) “before civil liability may be imposed upon the defendant owner under section 9 of the act, it must appear that he had charge of the construction operations involving the violation.” Here, there were some 75 to 80 contracts, a large number of contractors were involved, and the alteration work was going on in several buildings. Thus, Edison could be liable only if the activities by which it could be found to have charge extended to the work of Paschen, the contractor which erected the faulty scaffold.
The conclusion we have reached, and the necessity for a new trial, requires us to determine the further question of whether plaintiff could properly prove that, after the occurrence, Edison instructed Paschen to use a different type of scaffolding. Citing numerous authorities, it is said in
Insofar as the defendant Sargent is concerned, plaintiff contends that the directed verdict was improper, and that the trial court also erred in quashing a subpoena which demanded the production of the contract between Edison and Sargent, and other records of the latter. The position of the plaintiff was, and is, that such records, the contract in particular, were relevant to the question of whether Sargent was in charge of the work, and that the' quashing of the subpoena prevented plaintiff from presenting evidence to establish his case against Sargent. The trial court, however, employing much the same concept embodied in the Edison jury instruction, held that Sargent could have duty and liability under the act only if it was “actively engaged in supervisory work,” or if it “had something to do with the supervision and management of the job,” and on this basis quashed the subpoena, reasoning that the records sought could nоt show active supervision and control. Looking once again to the legislative purpose of providing maximum protection in a particularly hazardous occupation, it is our opinion that the act was also too narrowly construed as to this defendant.
It may be conceded that Sargent, like an owner, must have some direct сonnection with the construction and alteration operations before it can be deemed to be in charge of the work, and thus subject to duty and liability under the act. But assuming that its contract with Edison, or perhaps the directions issued to Paschen pursuant to the “purchase order,” gave Sargent the right to control the work, we beHeve it necessarily follows that such right, exercised or not, is sufficient to establish duty under the act.
Even at common law retention of the right to control the work is sufficient to subject one to duty and tort responsibility, (see: Schwartz v. Gilmore,
Since the cause must be tried again as to Sargent, it is also necessary to consider the holding of the Appellate Court that the subpoena was properly quashed as being “unreasonable in scope” and “untimely” because plaintiff failed to use the discovery procedures provided for by Rule 17 of this court, (Ill. Rev. Stat. 1963, chap, 110, par. 101.17,) with respect to documents. As to the first premise, the conclusion of the Appellate Court that the subpoena sought “doсuments of several vague categories” is unwarranted. The request for plans, contracts, progress reports, etc., “concerning construction and alteration on Unit 7 & 8 and the barrier wall between,” was sufficiently definite for compliance. (Cf. People v. Allen,
For the reasons stated, the judgment of the Appellate Court is reversed as to both defendants, and the cause is remanded to the circuit court of Cook County for a new ^r*a^'
Reversed and remanded.
Notes
This opinion was prepared by the late Mr. Justice Daily and was adopted and filed as the opinion of the court.