ORDER
This сase was filed on Sept. 27, 2012, by an Oregon non-profit corporation, Central Oregon Landwatch, alleging numerous environmental violations pursuant to the defendant Forest Service’s lack of compliance with the National Forest Management Act (NFMA), 16 U.S.C. §§ 1600 et seq.; the National Environmental Policy Act (NEPA), 42 U.S.C. § 4321; and the Clean Water Act (CWA), 33 U.S.C. § 1251 et seq. Plaintiff filed a motion for a Temporary Restraining Order which this court granted on Thursday, October 4, 2012, until the court heard plaintiffs motion for preliminary injunction, scheduled on October 10, 2012. All parties requested an immediate ruling from this court to allow them tо pursue settlement options with Magistrate Judge Coffin.
This dispute surrounds Tumalo Creek (“Creek”), a tributary of the Deschutes River that runs through Bend, Oregon. The Creek is home to redband, brown and brook trout. It has also been identified as a candidate for the potential reintroduction of bull trout. Despite extensive restoration efforts, the Creek remains listed on the Clean Water Act 303(d) list for high temperatures.
On September 18, 2012, the Forest Service approved the issuance of a special use permit to the City of Bend (“City”) to construct the Bridge Creek Water Supply Project (the “Project”). In the short term, the Project requires cutting large spruce and other trees and permanently altering and filling wetlands. Once built and operational, the Project will result in increased water diversion and diminished water quality in the Creek during the lower flow summer months. The Project will permanently impact sensitive riparian ecosystems, including resident redband, brook and brown trout species. Lower flows and increased water temperatures threaten to foreclose the possibility of reintroducing bull trout to the Creek. The Project’s lifespan is at least 75 years and is expeсted to substantially increase the diversion of water from the Creek watershed through a 30-inch water supply pipe for use by the City of Bend.
Preliminary Injunction
A. Standards
The party seeking a preliminary injunction must demonstrate that he or
Courts may apply a “sliding scale” approach in their consideration of the success and harm factors. Alliance for the Wild Rockies v. Cottrell,
B. Discussion
Plaintiff asserts that it will likely succeed on the merits, due to the Forest Service’s failure to take a “hard look” at the direct, indirect and cumulative impacts to the aquatic еnvironment that is required by NEPA and its implementing regulations. 40 C.F.R. § 1500.1 et seq. For example, the Forest Service failed to disclose and analyze key baseline information regarding stream temperature and steam flow. The Forest Service failed to provide an analysis that ensures compliance with the applicable standards designed to protect aquatic life in the Deschutes National Forest and state water quality standards.
Specifically, when the Forest Service prepared the Environmental Assessment (“EA”) for this Project, it incorporated the work done by the City of Bend’s independent contractor HDR. HDR relied on the Heat Source model to forecast the increase in stream temperatures resulting from the Project. HDR modified the model, used temperature data from 1923 to 1987 and then used it to forecast temperatures year-round intо the future.
On the other hand, plaintiff retained hydrogeologist Mark Yinger to review HDR’s work. Yinger submitted extensive comments into the record underscoring the problems with HDR’s approach and how that approach rendered the critical temperature predictions unreliable. Neithеr HDR nor the Forest Service explained how the model was recalibrated and made suitable for use in forecasting year-round water temperatures. The Forest Service did not address the controversy over HDR’s modeling work in the EA, nor did it disclose the basis for allowing HDR to use the model in a manner for which the model had not been calibrated. Plaintiff argues that the Forest Service cannot demonstrate that it has taken a hard look at the Project and disclosed its impacts on the environment and met its obligations. This failure is critical here because the Forest Sеrvice relied on the Heat Source model to predict the likely increases in water temperature caused by the Project and to support its claim that the Project complied with substantive protections for aquatic life. Yinger asserts that the Heat Source modеl was created and calibrated by the Oregon Department of Environmental Quality only for use during a three week period in the summer of 2001. There is no evidence that the Heat Source model was designed for use to forecast complex data sets, including complete annuаl data. Therefore, plaintiff argues, the Forest Service cannot rely on HDR’s work to meets its obligation under NEPA to take a hard look at the direct, indirect and cumulative impacts of the Project or to
Moreover, the Forest Services seems to admit that the Heat Source modeling fails to show whether applicable water quality standards are met when it stated that the model’s “temperature predictions are effective for analyzing the relative temperаture differences between alternatives, but the range of temperatures does not fall within the range of what would be an expected measured temper a cure change in the field, since the model’;s accuracy is approximately +/- 1 degree [Celsius].” EA at 3-66.
In other words, the model may provide a comparison between the alternatives but the model does not accurately predict water quality impacts as required by state water quality standards. The model output lacks the accuracy necessary to determine compliancе with applicable water quality standards.
Even if this court were to assume that the Forest Service’s application of the Heat Source model does not violate the law, the Forest Service admits violations of the Inland Native Fish Strategy (“IN-FISH”) water quality standards in the EA. The INFISH amended thе Deschutes National Forest Land and Resource Management Plan (“LRMP”) with respect to water quality. The goal of the INFISH guidelines are to “maintain and restore” riparian resources, ecosystem health and fish populations. The Forest Service predicts temperatures exceeding 9 degrees Celsius during this “likely” spawning and rearing period throughout Tumalo Creek. The standard under INFISH is not to “retard attainment of water quality standards.” It is not enough for the Forest Service to simply conclude that there is no or little impact to the water temperature due to the Project without supporting reasoning, analysis, and data. See Marble Mountain Audubon Soc. v. Rice,
The Forest Service’s conclusions contradict themselves and the evidence in the record. The record supports plaintiffs likelihood of success on the merits in that the Project will result in violations оf IN-FISH standards for water quality.
Finally, the Forest Service failed to utilize the baseline to predict temperature changes resulting from the Project. To comply with NEPA’s “hard look” mandate, courts have held that agencies are obligated to maintain a current inventory of resources so that an adequate baseline exists to evaluate the environmental impacts of a proposed action. It is against baseline information that environmental impacts are measured and evaluated; therefore, it is critical that the baseline be accurate and complete. Ctr. for Biol. Diversity v. Bureau of Land Mgmt.,
In preparing the EA and analyzing the impact of the Project on temperatures and flows in the Creek, the Forest Service relied on a report prepared by HDR that used stream temperature data that was more than 25 years old. Bloemers Deсk, Exh. 1 (EA at 3-38); Exh. 11 at 6, 8. The Forest Service had more recent baseline data available to it, but stated that the older data was adequate and that newer data was measured at different points. Bloemers Deck Exh. 16 at 6. Given the Forest Service’s own admission that lower flows mean higher temperatures, and that during the last 25 years, the Creek endured greater temperatures and more extreme droughts, using more recent data would likely have been worse for the Creek than HDR predicted. The Forest Service failed to take a hard look and disclose the Project’s impacts consistent with NEPA’s requirements.
Plaintiff has raised serious questions about whether the Forest Service has ensured the Project complies with NFMA, NEPA and the CWA. The Forest Service did not disclose the environmental baseline and relied on a consultant’s modification of a temperature mоdel without requiring the model to be re-calibrated as directed by the Oregon Dept of Environmental Quality. The Forest Service’s own admissions demonstrate the Project is not in compliance with INFISH and that its approach cannot provide the measurements required by the appliсable Forest Plan standards.
Moreover, the immediate implementation of the Project will irreparably harm plaintiff and its members and supporters that use and enjoy the area at issue for its aesthetics, recreation such as hiking, camping, fishing, and photography, as well as watеrshed research, education and observing wildlife. Plaintiff and its members will further be harmed because the Project will degrade water quality, diminish aesthetic values and harm fish and wildlife in and around the Project area. “Environmental injury, buy its nature ... is often permanent or at least of long duration, i.e., irreparable.” Alliance for the Wild Rockies,
C. Bond
No bond shall be required. It is well established that in public interest environmental cases the plaintiff need not post bonds because of the potential chilling effect on litigation to protect the environment and the public interest. Federal courts hаve consistently waived the bond requirement in public interest environmental litigation, or required only a nominal bond. See People of State of Calif. ex rel. Van de Kamp v. Tahoe Regional Planning Agency,
CONCLUSION
Based on the record before this court as well as the parties’ oral arguments, evidence and witness testimony, plaintiffs motion for a preliminary injunction (doc. 11) is granted.
IT IS SO ORDERED.